Zanaga Iron Ore Co. Ltd. · LSE:ZIOC
Zanaga Iron Ore — Indaba 2013
24 slides from Zanaga Iron Ore's conference presentation, 2013
Slide 1: Investor Presentation Indaba 2013
Investor Presentation Indaba 2013
Slide 2: Disclaimer
Disclaimer This document, which is personal to the recipient, has been issued by Zanaga Iron Ore Company Neither this document nor any copy of it may be taken or transmi�ed into the United States of Limited (the “Company”). This document does not cons�tute or form part of any offer or invita�on Ameri
Slide 3: Corporate information
Corporate informa�on 3 Listed on AIM in November 2010 Highly Experienced Management & Board 3 Ticker: ZIOC Clifford Elphick Non-‐Execu�ve Chairman Founder & CEO of Gem Diamonds 3 Market cap: £71m ($111m) Former Director of Anglo American 3 Share price: £0.26 Mike Haworth Non-‐Execu�ve Director 3 Sh
Slide 4: Zanaga Project has world class potential
Zanaga Project has world class poten�al Large Resource Large opera�on Long life 6.8Bt 30 Mt 30 yrs High Quality Product Low Cost Suppor�ve Government 68% Fe $23/t ü 4
Slide 5: Republic of Congo is open for business
Republic of Congo is open for business Central African 3 Successful & established oil and gas industry Cameroon Republic 3 In opera�on for over 40 years Equatorial Guinea Republic of Congo 3 Suppor�ve government with strategy to diversify Gabon into mining Zanaga Project Exploration Licenses 3 Popul
Slide 6: Large deposit identified
Large deposit iden�fied 3 Only 25km of the 47km orebody drilled 3 >176,000 metres drilled 3 Feasibility Study drilling now complete 9703850mN 9703050mN 9694250mN Camp Itabirite/BIF Mafic amphibolites Basement 6
Slide 7: Large, well defined, long life mineral resource
Large, well defined, long life mineral resource 3 6.8 billion tonne Mineral Resource grading 32% Fe 3 Poten�al for higher produc�on levels & longer mine life 3 69% in Measured & Indicated category 3 Resource underpinned by >176,000m of drilling 3 Supports >30 year mine life 3 Feasibility Study drilli
Slide 8: Product and scale places Zanaga amongst the best in the world
Product and scale places Zanaga amongst the best in the world Fe grade vs. Impurity content 0% Highest Iron 2% Minas-‐Rio Phase 1 Brazil 2 Zanaga 30Mtpa ini�al phase 4% Alumina + Silica Content 1 China North America Australia – Medium Quality Lowest 6% impurity Other Africa CIS 8% Australia – High
Slide 9: Mining and Pipeline transportation
Mining and Pipeline transporta�on Mining Pit shell (North) 3 Open pit, low drill and blast opera�on 3 Low strip ra�o a key driver of low opex 3 Targe�ng high quality product with very low impuri�es 1,200 Indica�ve topographical profile comparison of Zanaga/Samarco Pipeline transporta�on 1,000 Samarco
Slide 10: Water, port site & power infrastructure
Water, port site & power infrastructure Port site design 3 A�rac�ve port site – 1.6km trestle with minimal dredging to accommodate cape size vessels 3 Land area presents scope for future expansion (to 60Mtpa) 3 Good exis�ng onshore support facili�es in nearby Pointe Noire Power supply 3 Ini�al proje
Slide 11: Attractive project economics
A�rac�ve project economics Capex Opex Pipeline PFS Area Mining 7.4 (2012 US$) Mine & processing plant 2,348 Processing 11.0 Pipeline 1,194 Port 603 Admin/Overheads 2.5 Power 717 Total Direct 4,862 Pipeline 0.5 Indirects 1,595 Total incl. Indirects 6,457 Port 1.5 Con�ngency 897 FOB Cost (incl. con�ng
Slide 12: Expected to be positioned at the bottom of the cost curve
Expected to be posi�oned at the bo�om of the cost curve… FOB Cash Costs for 2010 -‐ Saleable Mine Produc�on1 US$/t 120 RoW Brazil Australia China 100 80 60 Expected Cash Cost US$21.09/dmt + Estimated Royalties 40 Zanaga 20 0 0 163 325 488 651 813 976 1139 1301 1464 1627 2010A Cumulative Production
Slide 13: Remaining at the bottom of the cost curve once shipped to China
…remaining at the bo�om of the cost curve once shipped to China Global Iron Ore Cash Cost by Company, CFR China High Cost Chinese/Indian Mines 140 Cliffs 120 LKAB Mittal Metinvest Vedanta 100 CSN 80 $/dmt 60 40 Zanaga Project 20 0 0 500 1,000 Source: FMG, Rio Tinto, BHP, Vale, Company Reports, AME,
Slide 14: Leveraging the expertise of a leading diversified major
Leveraging the exper�se of a leading diversified major JV Agreement 50% +1 share Zanaga Project 50% -1 share 3 Xstrata obliged to fund FS costs 3 $42m cash and no current funding obliga�ons 14
Slide 15: JV Agreement provides optionality to ZIOC
JV Agreement provides op�onality to ZIOC 3 Xstrata obliged to fund Feasibility Study to internal standards and interna�onal best prac�ce 3 At end of the Feasibility Study Xstrata has a one off right to acquire ZIOC stake in the Project for cash at 100% NPV 3 Alterna�vely ZIOC has the right to fund it
Slide 16: EBITDA breakdown by commodity for majors
EBITDA breakdown by commodity for majors Iron ore remains the highest margin business for the majors, even in H1 2012 with iron ore around c.$105/t Iron Ore division % contribution to net profit Iron Ore 64% Aluminium 11% Copper 26% Iron Energy 27% Ore Diamonds and Minerals 27% 75% Other Operations
Slide 17: 17
17
Slide 18: 18
18
Slide 19: 19
19
Slide 20: ALT
ALT fo) & Za ro fe) SS "J 3 & 3 | > Hee
Slide 21: 21
21
Slide 22: 22
22
Slide 23: Zanaga Project continues to show world class potential
Zanaga Project con�nues to show world class poten�al Large Resource Large opera�on Long life 6.8Bt 30 Mt 30 yrs High Quality Product Low Cost Suppor�ve 68% Fe $23/t Government ü ü Strategic partnership ü High standards ü Funding FS 23
Slide 24: Investor Presentation Indaba 2013
Investor Presentation Indaba 2013