Centuria Industrial Reit · ASX:CIP

Centuria Industrial Reit — Investor Day (June 2026)

17 slides from Centuria Industrial Reit's investor day presentation, Jun 16, 2026

  1. Slide 1: Centuria Industrial REIT (CIP) Investor Day Presentation

    Centuria Industrial REIT (CIP) Investor Day Presentation SYDNEY (Tuesday, 16 June 2026) – Centuria Industrial REIT (ASX: CIP), provides the attached presentation that will be used as part of today’s Investor Day. – Ends – For more information or to arrange an interview, please contact: Grant Nichols

  2. Slide 2: Centuria Industrial REIT Investor Day

    16 JUNE 2026 | ASX:CIP Centuria Industrial REIT Investor Day CLAYTON DC, CLAYTON VIC

  3. Slide 3: Group overview and Centuria data centre vertically integrated capability

    LISTED: DATA CENTRE, PIPE STREET, WELLCAMP QLD​ Group overview and Centuria data centre vertically integrated capability John McBain, Centuria Capital Joint CEO Simon Holt, Centuria Capital CFO

  4. Slide 4: Centuria: Founder-led, Australasian fund manager overseeing $21Bn+ AUM

    Centuria: Founder-led, Australasian fund manager overseeing $21Bn+ AUM1 25+ year track record deploying capital into scalable investments CENTURIA DIVISIONS OPERATIONS PLATFORM CAPITAL1 • Real estate equity ✓ Funds management • 150+ unlisted funds & loan SPVs (Listed / unlisted funds) ✓ Transactions

  5. Slide 5: Centuria has established vertically integrated data centre capability

    Centuria has established vertically integrated data centre capability DC owner DC developer DC operator AI Factory operator ARTIST IMPRESSION TELSTRA DATA CENTRE, CLAYTON VIC DC EXPANSION, CLAYTON VIC WELLCAMP DC, TOOWOOMBA QLD AI FACTORY 1 First acquisition in 2020. Dedicated data centre developmen

  6. Slide 6: Data centre market overview

    Data centre market overview Kate Mitchell, Fund Manager – Data centres

  7. Slide 7: What's real and what's not? Duplication and constraints on prospective supply

    What’s real and what’s not? Duplication and constraints on prospective supply Australia’s installed 44GW capacity is currently GW of connection requests received in the 2025 ISAR1 only 1.5GW. Despite strong 30GW demand, this is only Removed by NSP and AEMO screening for credibility1 expected to grow

  8. Slide 8: Australia's competitive advantages are structural and strategic

    Australia’s competitive advantages are structural APAC data centre powered shell build cost estimates ($USM / MW)1 and strategic Advantages Tokyo 14.5 • Sovereign data and regulatory positioning Singapore 13.5 • Lower cost build vs North Asia1 • Strong renewable energy pipeline Hong Kong 12.0 • Prox

  9. Slide 9: Each digital wave has added to – rather than replaced – underlying demand

    Each digital wave has added to – rather than replaced – underlying demand Industry evolution is not as much about excess data centre capacity; as it is the risk that AI value creation occurs offshore, leaving Australia positioned as a consumer of AI, not a producer of it. Dot.com the internet Cloud

  10. Slide 10: Centuria DC: CIP's perspective

    LISTED: THOMASTOWN VIC Centuria DC: CIP’s perspective Grant Nichols, Head of Listed Funds & CIP Fund Manager

  11. Slide 11: Centuria Industrial REIT data centre strategy

    Centuria Industrial REIT (ASX: CIP) data centre strategy Targeting real estate returns from data centres Two different asset strategies Targeting real estate returns No operating risk • Existing operational data centres provide long • The CIP data centre strategy is targeted at • CIP cannot operate

  12. Slide 12: Clayton

    Clayton ARTIST’S IMPRESSION Current Future optionality • CIP owned asset since 2020. • Telstra has agreed to partially surrender one hectare of under-utilised land, providing an opportunity for a second data centre. • Telstra have a triple net lease over an existing data centre until 2050. • The exi

  13. Slide 13: Thomastown

    Thomastown ARTIST’S IMPRESSION Current Future optionality • Existing CIP landholding of 10.6 hectares. • Future optionality • Two existing industrial facilities on site, with lease expiries of 2027 and 2031. • Power applications have been lodged to VicGrid and Ausnet. • Significant power allocations

  14. Slide 14: Toowoomba

    Toowoomba Current Future optionality • Acquired by CIP in 2026. • Power studies underway to increase power capacity. • Centuria DC have a 15-year triple net lease over the facility. • Proximity to renewable and gas energy, creates opportunity for significant • Existing operation is a 2.5MW colocatio

  15. Slide 15: Other sites

    Other sites Yarraville Malaga Current Current • Located within 10 kilometres of Melbourne city, leased to 2028. • Malaga - 100% leased to Fujitsu until October 2030 (with a 5-year option). Future optionality • Located in the Western Melbourne availability zone, with numerous Future optionality Hyper

  16. Slide 16: Disclaimer

    Disclaimer This presentation has been prepared by Centuria Property Funds No.2 Limited (ABN 38 133 363 185, AFSL 340304) (CPF2L) as responsible entity of Centuria Industrial REIT (ARSN 099 680 252) (‘CIP’ or the ‘Trust’). This presentation contains selected summary information and does not purport t

  17. Slide 17: Centuria office locations

    AUSTRALIA Sydney (head office) Melbourne (02) 8923 8923 (03) 9616 6500 Level 41, Chifley Tower Level 47 2 Chifley Square 101 Collins Street Sydney NSW 2000 Melbourne Vic 3000 Brisbane Perth (07) 3905 7000 (08) 9321 7133 Suite 2802, Riverside Centre Level 27 Level 28, 123 Eagle Street 140 St Georges

Centuria Industrial REIT — Investor Day (June 2026) on 6ix