Kgl Resources Limited · ASX:KGL

Kgl Resources — Proactive Investors (August 2015)

24 slides from Kgl Resources's conference presentation, Aug 4, 2015

  1. Slide 1: Proactive Investors, 4th August 2015

    For personal use only Proactive Investors 4th August 2015 1

  2. Slide 2: Corporate Overview

    Corporate Overview For personal use only ASX code KGL Board of Directors & Management Issued shares 141.5 million Options 2.8 million Simon Milroy Managing Director Share Price 13.5 cents Chris Bain Acting Chairman Market capitalisation (3 Aug 15) $19.1 million Brad Ellis Non-Executive Director Cash

  3. Slide 3: For personal use only

    For personal use only 1. Jervois Copper Project 2. Jervois PFS Optimisation 3. Resource Update 4. Geophysics Results 3

  4. Slide 4: Jervois Project Setting

    Jervois Project Setting For personal use only  On the Plenty Highway  Concentrate to be trucked from site to Alice Springs then transported by rail to Darwin port  In the 1960’s, ore was trucked from Jervois to Mt Isa 4

  5. Slide 5: Geological Setting

    For personal use only Geological Setting • Hosted by Bonya Metamorphics in Eastern Arunta • Northerly Plunging Syncline • Hybrid SEDEX-VMS 5

  6. Slide 6: Reward Prospect looking south

    Reward Prospect looking south Reward Marshall Cox’s Find Green Parrot Rockface Bellbird For personal use only 6 6

  7. Slide 7: PFS Optimisation

    For personal use only 7 PFS Optimisation

  8. Slide 8: Jervois Pre-Feasibility Study

    For personal use only Jervois Pre-Feasibility Study Dec 2014  2 mtpa Flotation Plant  7 Year Mine Life  21,000 tpa Copper Production  1 M ozpa Silver Production  Initial Capex $189m  C1 cost US$1.51/lb* * (After by-product credits and using an exchange rate of A$/USD 0.845 and silver price of

  9. Slide 9: PFS Optimisation

    PFS Optimisation For personal use only 1. Geotechnical – Steeper Pit Walls 2. Metallurgy – Increased recovery of Copper and Silver 3. Resource Drilling 4. Operating Costs – Reductions in mining costs Pre-Feasibility Study Update – October 2015 9

  10. Slide 10: Resource Update

    For personal use only 10 Resource Update

  11. Slide 11: Mineral Resources Update

    Mineral Resources Update For personal use only 30.5 Mt @ 1.07% Cu for 327,000 t Cu 30.5 Mt @ 23 g/t Ag for 22.6 M oz Ag 350 25 300 20 Contained Silver (Moz) Contained Copper Metal (kt) 250 200 15 150 10 100 5 50 0 May July Jan Nov Sep July 0 2011 2011 2012 2012 2014 2015 May July Jan Nov Sep July 20

  12. Slide 12: Highlights of Resource Update

    For personal use only Highlights of Resource Update  21% increase in Total Resource to 30.5Mt  36% increase in Indicated Resources to 11.5Mt  17% increase in contained copper to 327,000 tonnes  26% increase in contained silver to 22.6Moz 12

  13. Slide 13: Lead and Zinc Resources

    Lead and Zinc Resources For personal use only 160 50 45 140 40 Contained Zinc Metal (kt) 120 Contained Lead Metal (kt) 35 100 30 80 25 20 60 15 40 10 20 5 0 0 May July Jan Nov Sep July May July Jan Nov Sep July 2011 2011 2012 2012 2014 2015 2011 2011 2012 2012 2014 2015 Zinc Indicated Lead Indicated

  14. Slide 14: Geophysics

    For personal use only 14 Geophysics

  15. Slide 15: 3D Induced Polarisation Survey and Magnetotelluric

    For personal use only 3D Induced Polarisation Survey (IP) (0-500m depth) Magnetotelluric (MT) (500m-1,500m depth) 15

  16. Slide 16: IP Survey Results

    IP Survey Results For personal use only BELLBIR TARGET D SOUTH TARGET A PIT BELLBIRD B CENTRAL TARGET PIT G TARGET TARGET TARGETD Z TARGET E F TARGET X TARGET C Resistivity 400 Ohm-m Chargeability 25 mrads Chargeability 18 mrads 16

  17. Slide 17: IP Results

    IP Results For personal use only  The IP results show excellent correlation with known mineralisation.  Known copper mineralisation is both conductive (low resistivity) and chargeable.  The IP survey generated a number of new anomalies which are both conductive and chargeable in areas that have n

  18. Slide 18: Resistivity and Chargeability 200m RL

    Resistivity and Chargeability 200m RL (160m below Surface) For personal use only 18

  19. Slide 19: Resistivity and Chargeability 100m RL

    Resistivity and Chargeability 100m RL (260m below Surface) For personal use only 19

  20. Slide 20: Resistivity and Chargeability 0m RL

    For personal use only Resistivity and Chargeability 0m RL (360m below Surface) 20

  21. Slide 21: Schedule

    Schedule For personal use only  RC and Diamond drilling to test IP targets to commence in 2 weeks  MT Results complete in September  PFS Update in October 21

  22. Slide 22: For more information contact

    For more information contact For personal use only Simon Milroy on +61 7 3071 9003 or info@kglresources.com or visit www.kglresources.com ASX code: KGL Level 7, 167 Eagle Street Brisbane, QLD 4000 AUSTRALIA Forward-Looking Statements: This presentation includes certain “Forward-Looking Statements”.

  23. Slide 23: July 2015 Jervois Resource

    July 2015 Jervois Resource For personal use only Jervois Category Tonnes Copper Silver Lead Zinc Copper Silver Lead Zinc Cut‐off Copper Resources Mt % g/t % % kt Moz kt kt Cu% Marshall Indicated 1.4 1.45 35.6 20.1 1.6 0.5 Copper Inferred 0.3 0.90 20.2 2.5 0.2 0.5 Reward Indicated 5.0 1.14 25.3 57.1

  24. Slide 24: Competent Person Statement

    For personal use only Competent Person Statement The Jervois Exploration data in this report is based on information evaluated by Martin Bennett, who is a member of the Australian Institute of Geoscientists and a full time employee of KGL Resources Limited. Mr. Bennett has sufficient experience whic

KGL Resources — Proactive Investors (August 2015) on 6ix