Slide 1: Community Consultative Committee
Community Consultative Committee 24th February 2022
Slide 2: Action List
Action List ITEM RESPONSIBILITY PROGRESS UPDATE Update on Coolatai PB See enclosed presentation grass control Statistics on feral PB See enclosed presentation animal control Demolition of derelict PB For discussion dwellings 2 21 February 2022 2
Slide 3: Noxious weed spraying 2021
Noxious weed spraying 2021 3 21 February 2022 3
Slide 4: Noxious weed spraying proposed 2022
Noxious weed spraying proposed 2022 4 21 February 2022 4
Slide 5: Feral Animal Baiting
Feral Animal Baiting 5 21 February 2022 5
Slide 6: Bait taken locations
Bait taken locations 6 21 February 2022 6
Slide 7: Ashton Mine Statistics YTD 2022
Ashton Mine Statistics YTD 2022 Ashton Coal Key Statistics 2022 Budget (ytd) 2022 Actual (ytd) ROM (Mt) 0.34 0.09 Product Coal (Mt) 0.15 0.03 Total Coal Sales (Mt) 0.12 0.02 Total Recordable Injuries (TRI) 12 2 Total Employees (FTE) 288 241 Complaints 0 0 Environmental Incidents 0 2 7 21 February 20
Slide 8: Current Mining Plan
Current Mining Plan 8 21 February 2022 8
Slide 9: Environment Monitoring Data
Environment Monitoring Data ▪ Refer to monitoring data attachment 9 21 February 2022 9
Slide 10: Complaints & Incidents
Complaints & Incidents • There have been no community complaints since the last meeting. ▪ One environmental incident was reported. • A minor discharge of water and tailings from the tailings line was caught and contained within the bunded contour drains and sediment dam. 10 21 February 2022 10
Slide 11: Environmental Update
Environmental Update ▪ Monthly groundwater monitoring undertaken. ▪ Monthly noise monitoring undertaken. No issues identified. ▪ Annual fauna monitoring undertaken – first time that monitoring has detected evidence of a brush-tailed phascogale (a NSW threatened species) using nest boxes that were in
Slide 12: Camberwell update
Camberwell update • 34 Residential Tenancy Agreements • 10 properties in Asset Maintenance Program • Electrical audit inspections have been completed for occupied dwellings with repairs completed as required • 16 vacant residential lots • 2 commercial agreements • 9 rural areas occupied • Aggregated
Slide 13: Ashton-Ravensworth UG Integration Modification
Ashton-Ravensworth UG Integration Modification ▪ Modification was on display until 8th December 2021. ▪ Ashton has prepared response to submissions and submitted to DPE. ▪ https://www.planningportal.nsw.gov.au/major- projects/project/42971 13 21 February 2022 13
Slide 14: Any Questions?