Orestone Mining Corp. · TSXV:ORS

Orestone Mining — Investor Presentation (2014)

19 slides from Orestone Mining's investor presentation, 2014

  1. Slide 1: A Results Focused Gold-Copper Company

    A Results Focused Gold-Copper Company with High Impact Exploration Projects in BC, Canada and Sonora, Mexico. 1Q2014 TSX.V:ORS

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS This presentation contains certain forward looking statements that are based on assumptions made by management based on the information currently available to us. These statements include, but are not limited to, statements about our development plans, objectives, and expe

  3. Slide 3: Directors and Management

    DIRECTORS AND MANAGEMENT David Hottman, Director, President & C.E.O - 25 years experience in corporate finance and management of resource companies. A founder of Portal Resources, Eldorado Gold (TSX, NYSE) and Nevada Pacific Gold acquired by McEwen Mining (NYSE) in 2007. Gary Nordin, B.Sc (Geol. Hon

  4. Slide 4: Advisory Board

    ADVISORY BOARD Robert Pease, B.Sc., P.Geo, Advisor to the Board – Mr. Pease was previously the founder, CEO and a Director of Terrane Metals Corp., which owned the Mt. Milligan project until it was acquired for $700 million in 2010 by Thompson Creek Metals. He is also a former Director and Strategic

  5. Slide 5: Exploring in Sonora, Mexico

    EXPLORING IN SONORA, MEXICO The Estrella de Oro project is located 200 kilometers SE of Hermosillo, Sonora, Mexico; a region of good infrastructure for project development. 5 TSX.V:ORS

  6. Slide 6: Estrella de Oro Project – Terms and Model

    ESTRELLA de ORO PROJECT – TERMS AND MODEL  Earning a 60-per-cent interest in the 700 hectare property from Kootenay Silver Inc.  Terms of the Five Year Option Agreement:  issue 200,000 shares upon regulatory approval (issued);  cash payments totalling US$150,000 over the first four years;  cumu

  7. Slide 7: Estrella de Oro Project – Stockwork Veining

    ESTRELLA de ORO PROJECT – STOCKWORK VEINING Exposed bedrock in numerous prospect pits indicate a flat lying sheeted stockwork vein system. 7 TSX.V:ORS

  8. Slide 8: Estrella de Oro Project – Plan Map

    ESTRELLA de ORO PROJECT – PLAN MAP The project has intense structural formation in an area of very interesting gold values. A total of 391 selected grab samples of quartz vein were taken from prospect pits with 277 samples grading greater than 500 ppb gold and 160 samples greater than 1000 ppb gold

  9. Slide 9: Estrella de Oro Project – Primary Target Area

    ESTRELLA de ORO PROJECT – PRIMARY TARGET AREA Potential to outline an oxidized, bulk tonnage stockwork gold system over an area measuring 500 x 500 meters. 9 TSX.V:ORS

  10. Slide 10: Estrella de Oro Project – Exploration 2014

    ESTRELLA de ORO PROJECT – EXPLORATION 2014 The next phase of exploration will consist of soil geochemical surveys followed by backhoe trenching to further test the system prior to drilling. 10 TSX.V:ORS

  11. Slide 11: Exploring in British Columbia, Canada

    EXPLORING IN BRITISH COLUMBIA , CANADA 11 TSX.V:ORS

  12. Slide 12: Captain Property – A Major Asset in a Junior Company

    CAPTAIN PROPERTY – A MAJOR ASSET IN A JUNIOR COMPANY The 100% owned Captain Property covers 417 square kilometers and hosts a large gold/copper porphyry system 30 km south of the Mt. Milligan Mine (being developed by Thompson Creek Metals) along the same NW Structural Trends. Xstrata and Goldfields

  13. Slide 13: Captain Property - History

    CAPTAIN PROPERTY - HISTORY  Exploration expenditures on the property: $3.9 million; Orestone $1.4m  Established a large, early stage gold/copper discovery within a mineralized porphyry system that measures 7 x 14 kilometers  Relatively flat terrain, moderate tree cover and an extensive network of

  14. Slide 14: Admiral Target – Hole C12-05

    ADMIRAL TARGET – HOLE C12-05  Throughout the hole mineralization is associated with biotite-magnetite alteration within volcanics and monzonite porphyry dykes overprinted by potassic flooding.  Mineralized from the bedrock contact at 63 meters to the bottom of the hole at 550 meters - 487 meters,

  15. Slide 15: Captain Target – Admiral Target

    CAPTAIN TARGET – ADMIRAL TARGET Hole C13-03 intersected an unaltered and un-mineralized post mineral alkali gabbro dyke from the bedrock contact at 78.9m to 280.0m. At a depth of 204.9m to 207.9m a xenolith fragment of highly potassic-sericite altered monzonite porphyry was intersected which assays

  16. Slide 16: Captain Property – Detailed Ground Magnetics 2013

    CAPTAIN PROPERTY – DETAILED GROUND MAGNETICS 2013  Detailed magnetic surveys totaling 130 line kilometers, at a 100 meter line spacing have refined the size and shape of the Admiral and West targets.  Both areas have large magnetic high zones with coincident moderate IP chargeability highs periphe

  17. Slide 17: Captain Property – Ground Magnetics

    CAPTAIN PROPERTY – GROUND MAGNETICS Nine large targets virtually untested and the Company has all permits in place to facilitate the next several phases of exploration; 75 line kilometers of geophysics and 58 sites approved for drilling. 17 TSX.V:ORS

  18. Slide 18: Share Structure

    SHARE STRUCTURE Shares Issued & Outstanding 37,772,233 Warrants (June 2014 @ $0.14) 889,705 Options (Average Price $0.25) 2,842,500 Fully Diluted Shares* 41,504,483 18 TSX.V:ORS

  19. Slide 19: Contact Details

    CONTACT DETAILS Mr. David Hottman President & C.E.O TSX Venture Exchange Orestone Mining Corp. Symbol: “ORS” Suite 915, 700 Pender Street West Cusip No.: 686154204 Vancouver, B.C. Canada, V6C 1G8 Phone: 604.629.1929 Fax: 604.629.1930 Website: www.orestone.ca Email: info@orestone.ca 19 TSX.V:ORS

Orestone Mining — Investor Presentation (2014) on 6ix