Filo Mining — Investor Presentation (July 2021)
33 slides from Filo Mining's investor presentation, July 2021
Slide 1: Advancing the Filo del Sol Copper-Gold-Silver Project in South America
ADVANCING THE FILO DEL SOL COPPER-GOLD-SILVER PROJECT IN SOUTH AMERICA Corporate Presentation – July 2021 A Lundin Group Company www.filo-mining.com TSXV: FIL | Nasdaq First North Growth Market: FIL | OTCQX: FLMMF
Slide 2: Cautionary Statement
CAUTIONARY STATEMENT Certain statements made and information contained in this presentation constitutes “forward-looking information” and “forward- Estimates of Mineral Reserves and Mineral Resources looking statements” within the meaning of applicable securities legislation (collectively, “forward-
Slide 3: Filo Mining Corp. Company Profile and Share Ownership
FILO MINING CORP. COMPANY PROFILE SHARE OWNERSHIP Lundin Family Trusts South American Project – Filo de Sol (100% interest) Board & Management Current Indicated Resource of: Advanced Institutions Exploration » 4.4 Million oz Gold Other » 147 Million oz Silver Company » 3.1 Billion lbs Copper CAPITAL
Slide 4: Filo del Sol Project
FILO DEL SOL PROJECT Filo del Sol hosts a high-sulphidation epithermal copper-gold-silver deposit associated with a large porphyry copper-gold system. Located in San Juan, Argentina & Chile » Pro-mining jurisdictions » Mining Integration and Complementation Treaty for cross-border projects » 12 km a
Slide 5: Investment Highlights
INVESTMENT HIGHLIGHTS UNPARALLELED GROWTH POTENTIAL Lukas Lundin commented, Existing Cu-Au-Ag resource, backstopped by a robust oxide “…the potential size and scale project. of the Filo del Sol deposit is unparalleled to any project I have been involved with … Our drill results this season are Outst
Slide 6: Why Copper?
WHY COPPER? » Copper fundamentals are strong; recent price movement upwards of $4.50/lb, declining global inventories • Lack of Investment: coming out of a cycle of depressed copper prices, limited new copper discoveries • Demand driving by Electrification, Infrastructure: copper is the “Green” meta
Slide 7: Exploration
EXPLORATION Filo Mining | Corporate Presentation
Slide 8: Significant Results Summary
SIGNIFICANT RESULTS SUMMARY HIGHLIGHT HOLES: FSDH032: FSDH041: FSDH046: FSDH048: total intercept total intercept total intercept total intercept of 1,009m @ of 858m @ of 1,378m @ of 1,081m @ 0.95% CuEq 1.80% CuEq 0.71% CuEq 0.88% CuEq From Hole-ID To (m) Length (m) Cu % Au g/t Ag g/t CuEq %1 (m) FSD
Slide 9: Filo in Manhattan, London, Stockholm, Toronto (scale comparison)
FILO IN MANHATTAN FILO IN LONDON 5 km 5 km FILO IN STOCKHOLM FILO IN TORONTO 5 km 5 km Slide 9
Slide 10: Filo del Sol Size & Grade
FILO DEL SOL SIZE & GRADE From To Length Hole-ID Potro Cu % Au g/t Ag g/t CuEq %1 (m) (m) (m) Cliffs - One of the largest steam- FSDH041 Filo – 7km 188.0 1,046.0 heated 858.0 alteration 0.89 zones 0.70 in the 48.1 Andes 1.80 incl 376.0 1,046.0 670.0 1.07 0.85 60.9 2.23 incl 780.3 943.3 163.0 2.31 2.
Slide 11: Comparison with Global Copper Intercepts
COMPARISON WITH GLOBAL COPPER INTERCEPTS Best holes over the past 2 years with Copper as the primary commodity CuEq Grade x Date Hole Number Project Country Company From (metres) To (metres) Interval (metres) CuEq (%) Source Document Interval¹ (%-m) 2020-02-24 VHD037 Onto Indonesia PT Sumbawa Timur
Slide 12: 2021 Results - Sections
2021 RESULTS - SECTIONS Slide 12 Filo Mining | Corporate Presentation
Slide 13: 2021 Results - Sections
2021 RESULTS - SECTIONS +200m North +200m North Slide 13 Filo Mining | Corporate Presentation
Slide 14: Development of an Exploration Target
DEVELOPMENT OF AN “EXPLORATION TARGET” BASED ON PREDICTED VOLUMES AND AVERAGED GRADES FROM SAMPLING THE DEEP DRILLING The quantity and grade of this exploration target is conceptual in nature, and there has been insufficient exploration to define a mineral resource in this area. It is uncertain if f
Slide 15: Positive PFS (Jan 2019)
POSITIVE PFS (JAN 2019) Filo Mining | Corporate Presentation
Slide 16: Filo del Sol - PFS Results Summary
FILO DEL SOL – PFS RESULTS SUMMARY Cu Copper After-Tax NPV (8%) $1.28b Avg. Annual Cu Production 67 kt Au Gold After-Tax IRR 23% Payback 3.4 Yrs Avg. Annual Au Production 159 koz Ag Silver C1 Cash Cost $1.23/lb CuEq Avg. Annual Ag Production 8,653 koz Slide 16 Filo Mining | Corporate Presentation
Slide 17: Filo del Sol Project Economics
FILO DEL SOL PROJECT ECONOMICS PFS SENSITIVITY TO METALS PRICES Metals Prices After-Tax NPV8% After-Tax IRR (Cu $/lb) / (Au $/oz) / (Ag $/oz) ($B) (%) PFS Case $3.00 / $1,300 / $20 $1.28 22.7% $3.50 / $1,550 / $23 $1.95 28.9% $4.00 / $1,800 / $26 $2.61 34.6% SPOT (Jun 14, 2021) $4.50 / $1,850 / $28
Slide 18: Pre-Feasibility Results
PRE-FEASIBILITY RESULTS FILO DEL SOL – PFS RESULTS – January 2019 Pre-Tax NPV (8%) ($B) $1.86 ANNUAL METAL Pre-Tax IRR (%) 27% PFS METALS PRODUCTION PROFILES After-Tax NPV (8%) ($B) $1.28 PRICES Payable Copper After-Tax IRR (%) 23% ASSUMED 90 80 70 Undiscounted After-Tax Cash Flow ($B) $3.23 60 Tonn
Slide 19: Pre-Feasibility Layout
PRE-FEASIBILITY LAYOUT Slide 19 Filo Mining | Corporate Presentation
Slide 20: Probable Mineral Reserves
PROBABLE MINERAL RESERVES FILO DEL SOL MINERAL RESERVE STATEMENT (@ 0.01 $/T NVPT CUT-OFF) Tonnage Grade Contained Metal Category (all domains) (Mt) Cu (%) Au (g/t) Ag (g/t) NVPT ($/t) Cu (M lbs) Au (K oz) Ag (K oz) Proven _ _ _ _ _ _ _ _ Probable 259.1 0.39 0.33 15.1 25.30 2,226 2,764 126,028 Total
Slide 21: Environmental, Social and Governance (ESG)
ENVIRONMENTAL, SOCIAL AND GOVERNANCE (ESG) LAYING THE STRATEGIC GROUNDWORK FOR RESPONSIBLE MINERAL DEVELOPMENT » Lundin Group’s commitments, culture and track record set expectations for ESG » Filo’s Responsible Mineral Development Policy frames corporate approach » Alignment with International Stan
Slide 22: Lundin Foundation: ESG Differentiator
LUNDIN FOUNDATION: ESG DIFFERENTIATOR A Canadian corporate foundation whose purpose is to position Lundin Group companies as the resource developers of choice, resulting in stronger communities. SINCE OUR 2007 INCEPTION, WE HAVE DISBURSED MORE THAN $72.6M USD INTO INITIATIVES THAT ENABLE LOCAL EMPLO
Slide 23: Experienced Management Team
EXPERIENCED MANAGEMENT TEAM EXPERTISE IN EXPLORATION, PROJECT STUDIES, FINANCING JAMIE BECK BOB CARMICHAEL JEFF YIP President & CEO Vice President Exploration Chief Financial Officer » More than 15 years of international » Also Vice President Exploration of » Also CFO of NGEx Minerals Ltd. project m
Slide 24: Strong & Reputable Board
STRONG & REPUTABLE BOARD EXPERTISE IN EXPLORATION, PROJECT STUDIES, FINANCING, M&A TRANSACTIONS ADAM LUNDIN ALESSANDRO BITELLI ERIN JOHNSTON Chairman » Over 30 years of experience in the resource » Current Managing Director of the industry and in public accounting, both in North Lundin Foundation, a
Slide 25: Next Steps & Outlook
NEXT STEPS & OUTLOOK LAYING THE GROUND WORK FOR YEAR ROUND DRILLING CURRENT STATUS » Drilling on-site now complete for the 2020/2021 field season » Three holes remained underway when the field season ended in May 2021. These holes were suspended prior to reaching target depths and are ready for re-e
Slide 26: Contact Us
Filo Mining | Corporate Presentation CONTACT US filo-mining.com Filo Mining Corp. Suite 2000 - 885 West Georgia Street Vancouver, BC, V6C 3E8 Canada FOR MORE INFORMATION CONTACT Amanda Strong Robert Eriksson Investor Relations Canada Investor Relations and Media Sweden info@filo-mining.com reriksson
Slide 27: Appendix
APPENDIX Filo Mining | Corporate Presentation
Slide 28: Apr 12, 2021 Results
APR 12, 2021 RESULTS NEW GOLD DISCOVERY IN FSDH042, EXTENSION OF THE HIGH GRADE SILVER ZONE 600 METRES NORTH Slide 28 Filo Mining | Corporate Presentation
Slide 29: Indicated and Inferred Resource
INDICATED AND INFERRED RESOURCE Cu 3.1 Billion lbs Cu Copper INDICATED Cu INFERRED 1.0 Billion lbs Au 4.4 Million oz Au Gold INDICATED Au INFERRED 1.8 Million oz Ag 146.9 Million oz Ag Silver INDICATED Ag 34.8 Million oz INFERRED Refer to slide 23 for additional details regarding the reporting of th
Slide 30: Mineral Resource
MINERAL RESOURCE Slide 30 Filo Mining | Corporate Presentation
Slide 31: Mineral Resource
MINERAL RESOURCE Tonnes Cu Au Ag Lbs Cu Ounces Au Ounces Ag Zone Cutoff Category (millions) (%) (g/t) (g/t) (millions) (thousands) (thousands) Indicated 349.6 0.34 0.32 12.6 2,656 3,623 141,364 Oxide * See notes Inferred 103.9 0.26 0.32 8.7 585 1,083 29,067 Indicated 75.5 0.27 0.34 2.2 451 813 5,374
Slide 32: Lundin Group: A History of Creating Value
LUNDIN GROUP A HISTORY OF CREATING VALUE FOR SHAREHOLDERS IN ARGENTINA The Lundin Group of Companies has a record of creating substantial value for shareholders. Past projects have generated some $15.8 billion. Shareholder Return on Investment* 1757% 1041% 1091% 961% 850% 558% 609% 352% 139% Lundin
Slide 33: A District in the Making
A DISTRICT IN THE MAKING EXPLORATION HISTORY, POTENTIAL & SCALE Potro Cliffs – One of the largest steam- heated alteration zones in the Andes Filo – 7km Slide 33 Filo Mining | Corporate Presentation