Otter Tail Corporation · NASDAQ:OTTR

Otter Tail — Sidoti & Company Small-Cap Conference March 2023

38 slides from Otter Tail's conference presentation, Mar 23, 2023

  1. Slide 1: Sidoti & Company Small-Cap Conference March 23, 2023

    Sidoti & Company Small-Cap Conference March 23, 2023

  2. Slide 2: Forward-Looking Statement

    Forward-Looking Statement Except for historical information contained here, the statements in this presentation are forward-looking and made pursuant to the safe harbor provisions of the Private Securities Litigation Reform Act of 1995. The words “anticipate,” “believe,” “could,” “estimate,” “expect

  3. Slide 3: Company Overview

    Company Overview MANUFACTURING PLATFORM ELECTRIC PLATFORM MANUFACTURING SEGMENT PLASTICS SEGMENT Electric Platform Manufacturing Platform 2022 Earnings Mix Long-Term Earnings Mix • Competitive low-cost (Beginning in 2024) • Long-term growth operations potential • Constructive • Capacity utilization

  4. Slide 4: 2022 Financial Summary and Highlights

    2022 Financial Summary and Highlights FINANCIAL RESULTS 2022 HIGHLIGHTS In thousands, expect per share amounts 2022 2021 • Record Financial Results We produced record earnings in 2022. All segments produced double digit earnings growth Operating Revenues $ 1,460,209 $ 1,196,844 from 2021; Electric 1

  5. Slide 5: Earnings Per Share Growth

    Earnings Per Share Growth $8.00 5YR CAGR = 30.2% $6.78 $7.00 $6.00 $5.00 $4.23 $4.00 $3.00 $2.06 $2.17 $2.34 5YR CAGR = 10.8% $1.81 $2.00 $2.12 $1.89 $1.66 $1.67 $1.00 $1.46 $1.27 $— 2017 2018 2019 2020 2021 2022 *Consolidated EPS w/o Plastics is a non-GAAP financial Consolidated EPS Consolidated EP

  6. Slide 6: Cleaner Energy Future

    Cleaner Energy Future Otter Tail Power CO2 Trend Otter Tail Power Energy Resource Mix 6.0 Coal Renewable Purchased Gas/Oil 4.3 (million short tons) 3.9 3% 4% 3% CO2 Emissions 4.0 3.7 2.9 23% 2.6 30% 28% 9% 42% 2.1 2.0 25% 45% 68% 69% 0.13 0.0 30% 21% 2005 2009 2013 2017 2022 2025 2050 Target Target

  7. Slide 7: ESG Highlights

    ESG Highlights By 2025, We are Targeting: 50% 50% Our owned and contracted Our carbon emissions from energy generation will be owned generation more than 50% renewable resources will be 50% below (Does not include MISO market purchases) 2005 levels Carbon emission reductions targeted to be 97% below

  8. Slide 8: ESG Highlights - Human Capital

    ESG Highlights - Human Capital We are focused on the health and safety of our employees and creating a culture of inclusion, excellence, and learning. Safety - Safety is one of our core values. We focus on the safety Leadership Development and Succession Planning - We invest in of our employees and

  9. Slide 9: Electric Platform

    ELECTRIC PLATFORM OrEnian POWER COMPANY

  10. Slide 10: Electric Operations

    Electric Operations Operating Revenue (in millions) $600 $549.7 $480.3 $446.1 $400 $200 Highlights • Rate base growth opportunities: $0 • Renewable generation - Hoot Lake Solar, Ashtabula Wind III 2020 2021 2022 purchase, and wind repowering Net Income (in millions) • Technology & infrastructure - A

  11. Slide 11: Rate Base Growth

    Rate Base Growth Rate Base $1.1B of Capital Spending from 2023 to 2027 Renewables & Natural Gas, 36% in billions $2.21 $2.11 $1.99 Transformative $1.85 Other, 12% 2023-2027 Technology & $1.75 Total Infrastructure, 7% $1.62 6 .4% GR of Distribution 02 7 CA Replacement, 18% -2 2 022 Transmission (incl

  12. Slide 12: Regulatory Framework

    Regulatory Framework Minnesota North Dakota South Dakota Renewable Riders Rider recovery / Rate case Rider recovery / Rate case Phase-in rider / Rate case A constructive regulatory environment Transmission Riders Rider recovery / Rate case Rider recovery / Rate case Rider recovery / Rate case provid

  13. Slide 13: Rate Base Projects

    Rate Base Projects Our Investment Project (millions) In Service % Complete Recovery Mechanisms Hoot Lake Solar ~ $62 2023 ~ 65% Rider/General Rate Case - MN Advanced Metering Infrastructure and Grid Modernization ~ $145 2019 - 2024 ~ 25% Rider/General Rate Case - MN, ND, & SD (Innovation 2030) Rider

  14. Slide 14: Hoot Lake Solar

    Hoot Lake Solar Project Hoot Lake Solar Description 49-MW self-build solar Schedule 2020-2023 Otter Tail Power Cost ~ $62 million Project Summary • Qualifies for investment tax credit of 40% after IRA passage; safe harbor equipment secured • Eligible to meet utility scale portion of MN Solar Energy

  15. Slide 15: Ashtabula Wind III Purchase

    Ashtabula Wind III Purchase Project Ashtabula Wind III Description 62.4-MW wind farm Schedule Completed purchase in January 2023 Otter Tail Power Cost $50.6 million Project Summary • Purchase power agreement (PPA) with NextEra Energy began in 2013 • Exercised option to purchase operational assets of

  16. Slide 16: MISO Long Range Transmission Planning (LRTP)

    MISO Long Range Transmission Planning (LRTP) Project MISO LRTP Description LRTP Tranche 1 Transmission Projects Schedule In Development Otter Tail Power Cost ~$390 million Project Summary • MISO recently approved its Long Range Transmission Plan with includes two 345kV projects in Otter Tail Power s

  17. Slide 17: Integrated Resource Plan & ND Regional Haze Plan

    Integrated Resource Plan & ND Regional Haze Plan Integrated Resource Plan (IRP) • Original IRP filed September 2021, jointly in MN, ND, & SD • Required filing in Minnesota and North Dakota. • Preferred 5-year plan, requested authority to: ◦ Add dual fuel capability at Astoria Station. ◦ Add 150 MW o

  18. Slide 18: Key Regulatory Matters

    Key Regulatory Matters Estimated Regulatory Matter MN ND SD Date Astoria Dual Fuel ADP X Q1 2023 Conservation Improvement (CIP) Triennial Filing (2024-2026) X Q2 2023 Fuel Clause Adjustment Forecast Filing X Q2 2023 Updated IRP Filing X X X Q1 2023 Annual Updates to Capital Recovery Riders X X X 202

  19. Slide 19: Electric Rates

    Electric Rates Average Summer Residential Rate per KWH 14.4 15.0 13.5 Otter Tail Power has maintained rates 13.1 13.2 13.2 13.1 lower than the national average in 12.5 recent years while major projects Cents per KWH 11.7 have been constructed and put in 10.0 10.5 service. 10.0 10.2 9.8 9.7 7.5 Conti

  20. Slide 20: Manufacturing Platform

    Manufacturing Platform we @®) VINYLTECH TO. PLASTICS Vill BT D northern pipe PVCePIPE products 20

  21. Slide 21: Manufacturing Operations

    Manufacturing Operations Operating Revenue (in millions) • Contract metal fabrication – stamping, machining, tube bending, tool & die, $500 laser cutting, welding, painting, assembly. A one stop shop for customer needs. • Growth opportunities with existing customer base and expansion with new $398.0

  22. Slide 22: Manufacturing Locations

    Manufacturing Locations 22

  23. Slide 23: Manufacturing Sales by End Market

    Manufacturing Sales by End Market Agriculture, 15% Energy, 1% 2021 Agriculture, 18% Energy, 1% 2022 Rec. Vehicle, 34% Rec. Vehicle, 34% Lawn & Garden, 20% Lawn & Garden, 19% Industrial, 12% Industrial, 10% Construction, 18% Construction, 18% 2021 2022 Other, 1% Industrial, 4% Industrial, 6% Medical,

  24. Slide 24: End Market Outlook - Manufacturing Segment

    End Market Outlook - Manufacturing Segment 2023 End Market Outlook Comments BTD Manufacturing • Dealer inventory remains below historic levels creating production demand for restocking Recreational Vehicles • Inflation and interest rate environment expected to impact discretionary spending • Demand

  25. Slide 25: Plastics Operations

    Plastics Operations Operating Revenue (in millions) $600 • Manufactures and sells PVC (polyvinyl chloride) pipe to $512.5 distributors. Pipe is used in municipal water, rural water, wastewater, and storm drainage systems. $400 $380.2 • Plants located Fargo ND & Phoenix AZ. • Approximate production c

  26. Slide 26: Plastics Locations

    Plastics Locations 26

  27. Slide 27: Historical Resin, Pipe Price and Spreads

    Historical Resin, Pipe Price and Spreads Sales prices remained strong while resin prices decreased and demand soften Continued strong domestic demand and increased export market demand drive further margin expansion. Resin shortages, driven by Hurricane Ida, COVID and a polar vortex, drives margins

  28. Slide 28: Annual U.S. Housing Starts

    Annual U.S. Housing Starts 2.5 in millions 2.0 1.54 1.5 50-Year Average 1.28 1.30 1.0 0.5 0.0 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022E 2023E 2024E Source: U.S. Census Bureau, U.S. Department of Commerce and Wells Fargo Economics 2

  29. Slide 29: Financial Update

    FINANCIAL UPDATE 29

  30. Slide 30: Financial Overview

    Financial Overview Operating Revenues Operating Income Net Income in millions in millions in millions $1,750 $500 $300 $284.2 2021 and 2022 earnings mix are impacted by strong Plastic $1,500 $1,460.2 segment performance. $250 $400 $390.4 $1,250 $1,196.8 $200 $176.8 $300 $204.2 $1,000 $910.5 $890.1 $

  31. Slide 31: Liquidity, Cap Structure and Credit Ratings

    Liquidity, Cap Structure and Credit Ratings Liquidity: Line of Credit Availability Consolidated Capital Structure & ROE Otter Tail Corporation Otter Tail Power Company 120% 32% Borrowing Capacity of $170M in millions 25.6% 90% 24% Equity / Debt Percentage 40.6% Return on Equity 49.3% 46.3% $88.3 Ava

  32. Slide 32: 2023 Earnings Guidance

    2023 Earnings Guidance Actual 2023 Guidance Diluted EPS 2021 2022 Low High Electric $ 1.73 $ 1.91 $ 2.00 $ 2.04 Manufacturing 0.41 0.50 0.43 0.47 We anticipate 2023 Plastics segment earnings will recede Plastics 2.34 4.66 1.57 1.76 from historic highs in 2022 as industry conditions begin to Corporat

  33. Slide 33: Five Year Financing Plan

    Five Year Financing Plan Long-Term Financing 2022 2023-2027 in millions (Actual) (Planned) LONG-TERM DEBT Otter Tail Power Issuances $ 90.0 $ 290.0 Retirements (30.0) (42.0) Otter Tail Corporation (Parent) Issuances — 80.0 Retirements — (80.0) Net Debt Increase $ 60.0 $ 248.0 EQUITY - No material ex

  34. Slide 34: Bond Maturity Schedule

    Bond Maturity Schedule $150 in millions Balanced and manageable maturity schedule 7.00% 6.47% Weighted average interest 6.37% rate of 4.23% $125 6.00% 5.47% $100 5.00% Debt Maturity Interest Rate 4.45% $75 4.07% 3.92% 3.82% 3.77% 4.00% 3.62% 3.69% 3.55% 3.52% $50 3.22% 2.74% 3.00% $25 $0 // // // //

  35. Slide 35: Capital Expenditures

    Capital Expenditures Total in millions 2022 2023 2024 2025 2026 2027 2023-2027 Electric Segment Renewables & Natural Gas Generation $ 88 $ 119 $ 88 $ 79 $ 10 $ 384 Technology & Infrastructure 33 30 6 5 1 75 Distribution Plant Replacements 33 37 38 38 43 189 Transmission (incl. replacements) 34 36 46

  36. Slide 36: History of Dividend Growth

    History of Dividend Growth Our Dividend Story Dividend Growth & Payout Ratio CAGR = 5.4% • Paid annual dividend without interruption since 1938 $1.75 $1.65 $1.56 $1.48 • 6.1% increase, or $0.10 per share, indicated $1.25 $1.28 $1.34 $1.40 $1.23 for 2023 • Strong balance sheet, ample liquidity, histo

  37. Slide 37: OTTR Investment Theme

    OTTR Investment Theme Financial Performance Targets Total Shareholder Return1 8-10% Long-Term EPS Growth Rate2 5-7% Dividend Yield ~ 3% Long-Term Targeted Dividend Payout Ratio 55-65% Dividend Growth Rate 5-7% Equity Layer 55-60% 1 2 Defined as EPS growth rate plus dividend yield; 2024 as the base y

  38. Slide 38: www.ottertail.com

    S OTIERTAIL W CORPORATION www.ottertail.com

Otter Tail — Sidoti & Company Small-Cap Conference March 2023 on 6ix