G11 Resources Limited · ASX:G11
G11 Resources — Odin Metals — Investor Presentation (November 2021)
14 slides from G11 Resources's investor presentation, November 2021
Slide 1: District Scale Copper Project Investor Presentation
District Scale Copper Project Investor Presentation November 2021 ASX: ODM
Slide 2: Disclaimer
Disclaimer This presentation does not constitute investment advice. Neither this presentation nor the information contained in it constitutes an offer, invitation, solicitation or recommendation in relation to the purchase or sale of shares in any jurisdiction. This presentation does not take into a
Slide 3: Corporate Overview and Investment Highlights
Corporate Overview Corporate Snapshot Investment Highlights Shares on Issue 466.3M HIGHLY PROSPECTIVE PROJECT 14M Market Capitalisation (at $0.03 per share) Highly prospective for VMS-hosted Copper and magmatic Ni- Cu-PGE Cash (as at 30 June 2021) $2.4M The Koonenberry Project covers 2600km2 of
Slide 4: Project Summary
Project Summary Koonenberry Project- District scale, copper and base metals LOCATION Located 80km east of major mining centre, Broken Hill NSW Access to the project areas is via Barrier highway containing several sealed main roads, rural roads and farm tracks PROJECT OVERVIEW The Koonenberry P
Slide 5: Work Program and Newsflow
Work Program and Newsflow Drilling underway at Koonenberry Completed Commenced Planned to be released October 2021 November 2021 January 2022 Final EM survey data Reverse Circulation (RC) Initial assays expected to processed and Drilling has commenced be received modelled which will be followed by
Slide 6: HeliTEM2 Airborne Electromagnetic Survey Results
HeliTEM2 Airborne Electromagnetic Survey (“EM”) Results 222 Targets Identified including 6 high priority targets Finalised data has been received from the HeliTEM2 EM survey covering an area of ~1,150km2 222 targets have been identified, evaluated and prioritised 6 priority one targets 45 pr
Slide 7: Drilling
Drilling Minimum of 5,000 metres of RC drilling underway RC Drilling Pattern Geochemical Auger Drilling Reverse Circulation (RC) Drilling is underway Drilling will test anomalous areas that are more conducive to Auger drilling post the initial RC program Minimum of 5,000 metres of RC drilling
Slide 8: Highly prospective VMS Geology
Highly prospective VMS Geology High quality assets VMS deposits overview Volcanogenic Massive Sulphide (VMS) deposits are one of the richest sources of metals such as copper, lead, and zinc globally Highly Prospective and under Potential for long term production due explored VMS Geology to the
Slide 9: Grasmere
Grasmere Indicated and Inferred Mineral Resource Estimate reported in accordance with JORC (2004) totalling 5.75 Mt @ 1.03% Cu. Grasmere best intercepts include : “The Grasmere deposit is the largest copper rich massive sulphide mineralised zone identified to date in western New 9.00m at 4.38% C
Slide 10: Cymbric Vale Prospect
Cymbric Vale Prospect Cymbric Vale Prospect – minimal modern exploration has identified significant copper anomalism: Shear hosted Cu system, similar structural and geological setting to Grasmere Anomalous surface rock chip samples (up to 5.6% Cu) covering more than 1.2km strike Two shallow
Slide 11: Copper Market Outlook
Copper Market Outlook Global de- carbonasition and electricfication to drive copper (EV’s, renewable energy) Goldman Sachs says copper prices are poised to increase as demand outpaces supply since the concentrate market is very tight, particularly in China Goldman Sachs forecasts copper will f
Slide 12: Key Management
Key Management PROJECT Experienced team with proven track record 22 years’ experience in public company management, corporate advisory, investment banking and public company accounting Specialising in advancing, financing and development of mineral resource assets and business development. Jason
Slide 13: Investment Summary
Investment Summary HIGHLY PROSPECTIVE LIMITED EXPLORATION The Koonenberry Project comprises 5 exploration Historic exploration has identified several copper licences, covering 2,600km2 and ~150m strike of the prospect areas. Priorities are the Grasmere trend, significantly under-explored Koonenberry
Slide 14: Contact Details
Odin Metals Limited Investor Presentation – November 2021 This release was authorised by Mr. Jason Bontempo, Executive Chairman of Odin Metals Limited Contact Details 35 Richardson Street, West Perth WA 6005 www.odinmetals.com.au ASX: ODM