EOG Resources, Inc. · NYSE:EOG

EOG Resources — Investor Presentation (May 2015)

36 slides from EOG Resources's investor presentation, May 2015

  1. Slide 1: EOG Resources stock information and investor relations contacts

    NYSE Stock Symbol: EOG Investor Relations Contacts Common Dividend: $0.67 Cedric W. Burgher, SVP Investor and Public Relations Basic Shares Outstanding: 549 Million (713) 571-4658, cburgher@eogresources.com David J. Streit, Director IR (713) 571-4902, dstreit@eogresources.com Internet Address: Kimbe

  2. Slide 2: Copyright; Assumption of Risk; Forward-Looking Statements

    Copyright; Assumption of Risk: Copyright 2015. This presentation and the contents of this presentation have been copyrighted by EOG Resources, Inc. (EOG). All rights reserved. Copying of the presentation is forbidden without the prior written consent of EOG. Information in this presentation is provi

  3. Slide 3: 1Q 2015 Operations Highlights

    1Q 2015 Well Performance Exceeded Expectations - Oil Production Ahead of Guidance Well Costs Currently Below 2015 Plan Levels - Additional Reductions Possible Maintained Flat YoY Oil Production Guidance for 2015 - “U” Shaped Production Pattern - Reduced 1Q 2015 Completions 39% YoY Operations On Trac

  4. Slide 4: Focus on Returns

    Focus on Returns Maximize Return on Capital Invested in 2015 - Drill Best Plays: Eagle Ford, Delaware Basin and Bakken - Deferring Well Completions Focus on Improving Well Productivity, Reducing Costs Maintain Strong Balance Sheet Take Advantage of Opportunities to Add Drilling Inventory - Leasehold

  5. Slide 5: Rate-of-Return Focus Drives Shareholder Value

    Rate-of-Return Focus Drives Shareholder Value Exploration and Technology Focus - Core Competency and Sustainable Competitive Advantage Exploration - Generate New Plays Internally • Capture Premier Acreage • Early-Mover Strategy Drives Low Leasing Costs - Identify Additional Targets in Existing Plays

  6. Slide 6: Direct ATROR at Flat $65 and $55 Oil

    Eagle Ford Bakken/Three Forks Direct ATROR* at Flat $55 Oil Direct ATROR* at Flat $65 Oil Delaware Basin Leonard Delaware Basin Wolfcamp Oil and Combo Delaware Basin 2nd Bone Spring Sand 35% 60% Powder River Basin Midland Basin Wolfcamp 15% 25% Wyoming DJ Basin * Direct ATROR Based on cash flow and

  7. Slide 7: Play Minimum Locations

    Minimum Drilling Play Locations* Years** Eagle Ford 5,500 11 Bakken/Three Forks 580 7 Delaware Basin Leonard 1,600 40 Delaware Basin 2nd Bone Spring Sand Evaluating Delaware Basin Wolfcamp 1,100 75 DJ Basin 460 12 Powder River Basin 275 8 Midland Basin Wolfcamp 500 50 ≈ 10,000 >15 Years of Drilling

  8. Slide 8: ROCE and ROE versus peers

    ROCE** ROE** 16.4% 15.6% 13.7% 13.7% 14.1% 13.3% 12.4% 12.4% 12.4% 10.5% 7.8% 6.6% 6.9% 4.8% Integrateds Integrateds Integrateds Integrateds 3.4% 3.7% Majors Majors Majors Majors EOG* EOG* EOG* EOG* E&P E&P E&P E&P 1 2 1 2 2013 2014 2013 2014 * See EOG reconciliation schedules. ** Source: Company fi

  9. Slide 9: ≈85% of 2015 Capex Going to Top Plays

    Gathering, Processing and Other $8.3 Bn Exploration and Development Facilities $0.7 Exploration and Development $1.0 $4.9-$5.1 Bn $0.4 $0.6 $6.6 $4.0 2014 2015* ≈85% of 2015* Capex Going to Top Plays: Eagle Ford, Delaware Basin and Bakken * Based on full-year estimates as of May 4, 2015, excluding a

  10. Slide 10: Additional Net Present Value Per Well from Deferring Completion

    Additional Net Present Value Per Well Defer Well Completion Six Months at Various Prices $900M $750M $600M $450M $300M $55 $60 $65 $70 $75 Oil Price After Six Months* * $45 oil price first six months. Based on Eagle Ford West Type Well. EOG_0515-8

  11. Slide 11: Deferring Completion Increases Rate of Return

    Deferring Completion Increases Rate of Return Even if Oil Price Does Not Recover for 24+ Months 15% 10%  ATROR** 5% 0% 6 9 12 15 18 21 24 Months of Deferred Completion* * $45 oil price until completion, then $65 thereafter. Note: Based on Eagle Ford West Type Well. ** See reconciliation schedule. E

  12. Slide 12: Better Economics @ $65 Oil than $95 Oil

    Better Economics @ $65 Oil than $95 Oil 100% Three Years Ago 80% 73% 71% 60% 60% ATROR* 40% 36% 20% 0% Western Eagle Ford Delaware Basin Leonard 2012 @ $95 Oil Today @ $65 Oil * See reconciliation schedule. EOG_0515-10

  13. Slide 13: Top Thousand Club Contributors

    Top 20 “Thousand Club*” Contributors Top 20 “Thousand Club*” Contributors Peak 30-Day Rate 2014 Well Count Boed 250 2,500 200 2,000 150 1,500 100 1,000 500 50 0 0 EOG 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 EOG 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Oil Gas * Source: Bernstein Resea

  14. Slide 14: Employee headcount versus peers

    80 70 60 50 40 30 20 10 0 EOG Co. 1 Co. 2 Co. 3 Co. 4 Co. 5 Co. 6 Co. 7 Co. 8 Co. 9 Peer Co. 10 Co. 11 Co. 12 Co. 13 Co. 14 Avg Source: Company Reports. Average employee headcount in 2014. Peer Group: APA, APC, CHK, CLR, CXO, DNR, DVN, ECA, MRO, NBL, NFX, PXD, WLL and XEC. EOG_0515-12

  15. Slide 15: EOG Maintains Stable LOE Despite Rising Liquids Mix

    $14 EOG Maintains Stable LOE Despite Rising Liquids Mix $12 $10 EOG Peers’ 2014 LOE $8 LOE/Boe 2011 2014 2015E 2012 $6 2013 2010 $4 $2 $0 0% 10% 20% 30% 40% 50% 60% 70% 80% Liquids Production Source: Company filings. Peers: APA, APC, CHK, CLR, CXO, DVN, MRO, NBL, NFX, PXD, RRC and XEC. EOG_0515-13

  16. Slide 16: Committed to the Dividend

    $0.70 Committed to the Dividend $0.67 Increased Dividend Twice in 2014 $0.60 16 Dividend Increases in 15 Years $0.50 $0.40 $0.38 $0.34 $0.31 $0.32 $0.29 $0.30 $0.26 $0.20 $0.18 $0.12 $0.10 $0.08 $0.05 $0.06 $0.03 $0.04 $0.04 $0.04 $0.00 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 201

  17. Slide 17: Largest Oil Producer and Acreage Holder in the Eagle Ford

    Largest Oil Producer and Acreage Holder in the Eagle Ford - 15 Rigs on Average Operating in 2015 San Antonio - Complete ≈345 Net Wells in 2015 Estimated Potential Reserves* 3.2 BnBoe; 7,200 Net Wells - EUR 450 MBoe/Well, NAR at Average 40-Acre Spacing Crude Oil Window Multi-Well Pad Development - Hi

  18. Slide 18: Eagle Ford West Completion Design

    Eagle Ford West Completion Design Eagle Ford West Wells 47 High-Density Wells* vs. 41 Low-Density Wells* Average Cumulative Crude Oil Production* 2014 Vintage Wells (Mbo) (Mbo) 80 80 70 High-Density 70 Wells Cumulative Oil Production Cumulative Oil Production 60 +23% 60 50 2014 50 2013 40 40 Low-Den

  19. Slide 19: Drilling days improvements

    (Days) 25 20 15 10 Eagle Ford** 5 Barnett Combo* 0 2007 2008 2009 2010 2011 2012 2013 2014 2011 2012 2013 2014 * Normalized to 5,000’ lateral and total measured depth 12,400’ ** Normalized to 5,300’ lateral and total measured depth 15,000’ EOG_0515-17

  20. Slide 20: Completed Well Cost and Average Drilling Days

    Completed Well Cost* Average Drilling Days* ($MM) (Spud-to-TD) 6.1 14.2 5.7 5.5 5.3 10.9 8.9 7.4 4.3 2014 2015 Plan Current Target 2012 2013 2014 Current Record * Normalized to 5,300’ lateral. CWC = Drilling, Completion and Well-Site Facilities. EOG_0515-18

  21. Slide 21: Delaware Basin stratigraphy and plays

    Brushy Canyon Net to EOG* Leonard A New Mexico High ROR Oil Play 550 MMboe Texas - 300’ Spacing Tests Leonard B Red Hills Encouraging Leonard/ Bone Spring 4,800’ 1st Bone Spring 2nd Bone Spring Over-Pressured Oil Play Evaluating - Testing Multiple Zones and Spacing 3rd Bone Spring Wolfcamp Upper Wol

  22. Slide 22: 90,000 Net Acres Prospective in Northern Delaware Basin

    90,000 Net Acres Prospective in Northern Delaware Basin Shifting Towards Development Mode in 2015; Complete 37 Net Wells - Largest Relative Increase in Capital in 2015 - Pad Drilling and Simultaneous Completions Boost Efficiencies NGLs - Exclusively Using Self-Sourced Sand 14% Gas 16% Testing Multip

  23. Slide 23: Average Cumulative Oil Production Per Well

    (Mbo) 70 90-Day Cumulative Production 60 All Wells Completed Since January 2014 Average Cumulative Oil Production Per Well 50 40 30 20 10 0 EOG Co. 1 Co. 2 Co. 3 Co. 4 Co. 5 Co. 6 Co. 7 Peer Co. 8 Co. 9 Co. 10 Co. 11 Co. 12 Co. 13 Co. 14 Avg Source: IHS EOG_0515-21

  24. Slide 24: Completed well cost trend

    $7.7 $6.5 $6.0 $5.7 2014 Average 2015 Plan Current Target * Normalized to 4,500’ lateral. CWC = Drilling, Completion and Well-Site Facilities. EOG_0515-22

  25. Slide 25: Focused on Best 140,000 Net Acres with Multiple Pay Zones

    Focused on Best 140,000 Net Acres with Multiple Pay Zones NGLs - 90,000 Net Acres in Oil Play; 50,000 Net Acres in Combo Play 24% - >1,100 Net Drilling Locations Oil Gas 50% Typical Combo Well 26% - 4,500’ Lateral - EUR 900 MBoe, Gross; 700 MBoe, NAR Typical Northern - $7.0 MM CWC* Wolfcamp Oil Well

  26. Slide 26: Advanced Completions Driving Higher Production from Tighter Spaced Wells

    Advanced Completions Driving Higher Production from Tighter Spaced Wells - 90-Day Cumulative Production Up 17% in 2014 80,000 Net Acres Estimated Reserve Potential* 550 MMBoe, Net to EOG NGLs 26% Typical Well Oil 50% - 500 MBoe EUR/Well, Gross; 400 MBoe, NAR Gas 24% - $5.5 MM CWC** - 4,400’ Lateral

  27. Slide 27: Cumulative Oil Production and Well Spacing

    Cumulative Crude Oil Production* Average Well Spacing (Feet) (Mbo) 80 70 2014 1,030 Cumulative Oil Production 60 2013 910 2012 835 50 2011 40 560 30 20 10 0 0 30 60 90 120 150 180 2011 2012 2013 2014 Producing Days * Normalized to 4,400-foot lateral. EOG_0515-25

  28. Slide 28: Bakken Core and Antelope Extension

    Bakken Core ≈ 90,000 Net Acres Canada - Antelope Extension ≈ 20,000 Net Acres Stanley, ND State Line Encouraging Results on 700’ Spacing in the Core Bakken Lite - Testing 500’ Spacing Elm - Optimizing Completion Formula For Spacing and Area Coulee Bakken Core - Recent 500’ Tests Bakken Subcrop Antel

  29. Slide 29: Completed Well Cost and Average Drilling Days

    Completed Well Cost* Average Drilling Days* ($MM) (Spud-to-TD) 9.3 22.7 8.2 8.0 7.4 16.1 12.0 10.4 7.1 2014 2015 Plan Current Target 2012 2013 2014 4Q14 Record * Normalized to 10,000’ lateral. CWC = Drilling, Completion and Well-Site Facilities. EOG_0515-27

  30. Slide 30: Natural gas acreage by play

    Play Net Type Acres Marcellus, Bradford County 46,000 Gas Haynesville 143,000 Gas and Combo Eagle Ford 63,000 Gas Barnett 298,000 Gas and Combo Uinta 94,000 Gas and Combo S. Texas Frio/Vicksburg 195,000 Gas and Combo Horn River 127,000 Gas Acreage Holds Option Value for Natural Gas Price Recovery EO

  31. Slide 31: Trinidad and United Kingdom operations

    Trinidad and Tobago Trinidad ATLANTIC Expect Stable Production in 2015 OCEAN TRINIDAD 4(a) Drill 4 Net Wells to Maintain Deliverability U(b) U(a) SECC VENEZUELA United Kingdom United Kingdom East Irish Sea (Conwy) East Irish NORTH - First Production 3Q 2015 SEA Sea - Estimated Peak Production – 20 M

  32. Slide 32: Maintain Low Net Debt-to-Total Cap Ratio

    Maintain Low Net Debt-to-Total Cap Ratio - Credit Ratings – Moody’s A3 / S&P A- Successful Efforts Accounting Zero Goodwill $4.1 Billion in Available Liquidity - $2.1 Billion Cash at March 31, 2015 - $2.0 Billion Credit Facility – Undrawn at March 31, 2015 EOG Reserves Within 5% of Independent Engin

  33. Slide 33: Peer comparison

    4.0 3.5 3.0 2.5 2.0 1.5 1.0 0.5 0.0 Co. 1 Co. 2 Co. 3 Co. 4 Co. 5 Co. 6 Co. 7 Peer Co. 8 Co. 9 Co. 10 Co. 11 Co. 12 Co. 13 Co. 14 EOG Co. 15 Avg Source: UBS Investment Research, as of April 17, 2015. Based on $51/Bbl WTI and $2.85/MMBtu. Peer Group: APA, APC, CLR, COG, COP, CXO, DVN, HES, MRO, NBL,

  34. Slide 34: Crude oil and natural gas derivative contracts

    Crude Oil* 2015 Bopd $/Bbl May 1 to June 30 47,000 $91.22 July 1 to December 31 10,000 $89.98 Natural Gas* 2015 MMBtud $/MMBtu June 1 to June 30 275,000 $3.97 July 1 to July 31 275,000 $3.98 August 1 to December 31 175,000 $4.51 * As of May 4, 2015. Does not reflect options held by certain counterpa

  35. Slide 35: On Track to Achieve 2015 Objectives

    On Track to Achieve 2015 Objectives Lower Finding and Operating Costs - Optimize All Operations - Continue Investing in Infrastructure to Lower Costs – Six-Month Payouts - Capture Service Price Reductions Defer Production Growth: Awaiting Higher Price Environment - Reduce Rig Count and Delay Complet

  36. Slide 36: Copyright; Assumption of Risk; Forward-Looking Statements

    Copyright; Assumption of Risk: Copyright 2015. This presentation and the contents of this presentation have been copyrighted by EOG Resources, Inc. (EOG). All rights reserved. Copying of the presentation is forbidden without the prior written consent of EOG. Information in this presentation is provi

EOG Resources — Investor Presentation (May 2015) on 6ix