  1. Slide 1: Reid's Dome Gas Project: Technical Update Presentation

    Heading Subheading Reid’s Dome Gas Project: Technical Update Presentation March 2019

  2. Slide 2: Disclaimer

    Disclaimer • This presentation (Presentation) has been prepared by State Gas Limited (ACN 617 322 488) (State Gas). The Presentation and information contained in it is being provided to shareholders and investors for information purposes only. Shareholders and investors should undertake their own ev

  3. Slide 3: Gas at Reids Dome

    Gas at Reids Dome GAS

  4. Slide 4: State Gas - PL 231 Highlights

    State Gas - PL 231 Highlights • PL-231 is located in central Queensland, granted under the 1923 Act over PRODUCTION LEASE & 181 km2 over Reid’s Dome anticline for a 30 year term from 15/12/2005. PIPELINE SURVEY Pipeline Survey Licence PSL-2028 was granted for a 2 year term from LICENCE 01/08/2018 OW

  5. Slide 5: Location

    Location • PL-231 lies ~50 km south west of Rolleston in central Queensland • Granted under the 1923 Petroleum & Gas Act for a 30 year term from 15/12/2005. • Field activities only require 10 days notice to Land-owners and DNRM • Permit area ~181 km2 over Reid’s Dome anticline • Pipeline Survey Lice

  6. Slide 6: Infrastructure, PSL 2028 (Pipeline Survey Licence)

    Infrastructure, PSL 2028 (Pipeline Survey Licence) • ~47 km to Queensland Gas Pipeline network connection options to the north- east and south-east • Favourable location for connection with east coast pipeline network 6

  7. Slide 7: Possible Pipeline Route

    Possible Pipeline Route • Connecting PL 231 with the Queensland Gas Pipeline (PPL 30/116) QGP facility, • Utilizing road reserve Arcadia MLV where possible – incl. Rewan Road and Wyseby Road • Possible synergies with Santos/Origin’s ATP 1191 and PL 451 • Approximately 47km of new pipeline to connect

  8. Slide 8: Simplicity of Land Ownership

    Simplicity of Land Ownership Northern landowner Southern landowner PRIMERO WEST 1 NYANDA 4 Aldinga Nyanda • Two Land-owners • Framework established for land-owner agreements (used for 2018 drilling program) • Freehold land with no native title 8

  9. Slide 9: Overlapping Tenure

    Overlapping Tenure • Two overlapping tenures, • EPC 833, Peabody • EPC 1408, Matilda Coal • Joint Interaction Management Plans (JIMP) in place • No minable coal defined within the PL-231 area • Coal seams typically 1 – 4 m thick and deeper than 390m, unlikely to be suitable for mining 9

  10. Slide 10: Reid's Dome Gas Project - Next Steps

    Reid’s Dome Gas Project - Next Steps An Important Strategic Juncture • State Gas operates successfully with a small, focused team • State Gas has received approaches and interest from experienced industry participants to progress the Reid’s Dome Gas Project • Corporate (company-level) or partnering

  11. Slide 11: Denison Trough Structural Setting

    Denison Trough Structural Setting • NNW rift basin initiated in the Early Permian characterized by linked pull- apart half-grabens • Triassic – Jurassic compression led to creation of large inversion anticlines AOE-1 Denison Trough structural elements Denison Trough wells and seismic data 11

  12. Slide 12: PL-231: Anticlinal Structural Setting

    PL-231: Anticlinal Structural Setting • Surface geological mapping of the Reid’s Dome area indicates strike of NNE – SSW with trans-tensional offset in the central region • The Sericold Anticline plunges gently to the north and south within the permit area. The western limb dips slightly more steepl

  13. Slide 13: Denison Trough Stratigraphy

    Denison Trough Stratigraphy • Proven petroleum system • Permian reservoirs, source rocks and seals • Structural and stratigraphic traps • Conventional and unconventional plays 13

  14. Slide 14: Location

    Location • PL-231 lies ~50 km south west of Rolleston in central Queensland • Permit area ~ 181 km2 over Reid’s Dome anticline • Pipeline Survey Licence PSL- 2028 was granted for a 2 year term from 01/08/2018 • Only two landowners within permit area • Freehold land with no native title 14

  15. Slide 15: PL-231: Seismic Data

    PL-231: Seismic Data LEFT: existing seismic data, short lines, multiple vintages, ERI Reids Dome-3 0.5 – 3.0 sec. Images at same scale AOE-2 RIGHT: incomplete WOWCO 1980 seismic data estimated Nyanda-3 location (lost navigation data) Southern Cross, Reids Dome and Aldinga seismic surveys reprocessed

  16. Slide 16: AOE-1 Well Recap

    AOE-1 Well Recap Spontaneous Potential Resistivity • Drilled in 1954 on surface anticline • Discovered gas @ 142m in the Cattle Creek Formation • Tested @ 550 mscfd • Net Tested Pay = 8.2m • Avg. core permeability = 14 mD • Avg. core porosity = 17.7% • Gas at 1359m and 822m in the Reids Dome Beds (R

  17. Slide 17: Reids Dome Beds Pre-Drill Well Correlation

    Reids Dome Beds Pre-Drill Well Correlation Bandanna-1 Nyanda-1 AOE-2 AOE-1 Meteor-1 Cattle Creek Datum Top RDB Reid’s Dome Beds Blue and red neutron RDB coal and density spikes in measures Nyanda-1 indicate coals • Top of Reids Dome Beds defined by base-line increase in resistivity and change in neu

  18. Slide 18: PL-231: Summary of Geological Data

    PL-231: Summary of Geological Data • 17 wells, drilled 1955 – 2018 • AEO-1, AOE-2, Aldinga North-1, Aldinga East-1, Aldinga West-1, ERI Reids Dome-2, ERI Reids Dome-3, ERI Reids Dome-4, ERI Reids Dome-5, MNX Reids Dome-1A, Nyanda-1, Nyanda-2, Nyanda-3, Nyanda-4, Nyanda North-1, Primero-1, Primero We

  19. Slide 19: 2018 Drilling Program

    2018 Drilling Program (November – December 2018) 19

  20. Slide 20: 2018 Drilling Program (November-December)

    2018 Drilling Program (November-December) Two wells successfully drilled, demonstrating State Gas’ operating ability to undertake a drilling program from new target identification/inception to completion in under 4 months • Primero West-1 • Shallow conventional over-pressured gas • Located ~650m sou

  21. Slide 21: Nyanda-4 Drilling Results

    Nyanda-4 Drilling Results Nyanda-4 Results • Reid’s Dome Beds CSG and Tight Gas Sands objectives • Total depth: 1,200m • Cored-zone: 150m of coring from 394m • Gas bubbling from coal core, sandstones hissing Net coal in core: 11.3m Net coal in well 40.4m Carbonaceous shales: 25m Total: 65m • Average

  22. Slide 22: Nyanda-4 Core

    Nyanda-4 Core • Well-cleated coal and shale zones with open fractures Coal core and carbonaceous shale samples from upper Reid’s Dome Beds within Nyanda-4 Coal is generally bright black, and well cleated Coal occurs within dark grey carbonaceous claystone, with sharp upper and basal contacts Minor p

  23. Slide 23: Nyanda-4 Net Coal Determination

    Nyanda-4 Net Coal Determination 1. Core described to determine net coal-bearing intervals (11.3m) 2. Core-to-log correlation 3. Determine relationship of wireline logs to actual coal beds for cored interval 4. Apply relationship to entire Reid’s Dome Beds interval • Best fit with core where Density

  24. Slide 24: RDB PL-231 Well Correlation, Coal Seams

    RDB PL-231 Well Correlation, Coal Seams Nyanda-4 AOE-2 AOE-1 Datum • Core descriptions from Nyanda-4 indicate low energy lower coastal plain to esturine environment of FAULT deposition (missing section) • Coals probably formed in wide- spread lagoons and back- barrier swamps leading to laterally con

  25. Slide 25: Nyanda-4 Conventional Gas

    Nyanda-4 Conventional Gas Condensate / gas bubbles on sandstone core from Nyanda-4 under UV light Key: Yellow stippled = sandstone reservoir, Pink = gas/condensate, Light Blue = coal • Conventional gas: Gas and condensate noted bubbling and hissing from sandstones in Nyanda-4 core samples • Numerous

  26. Slide 26: Nyanda-4 Log Analysis

    Nyanda-4 Log Analysis • Complicated petrophysics, • Shale clasts masking sand response • minor pyrite masking coal response Pyrite in coal • RCA, SCAL, SEM etc. required from Nyanda-4 26

  27. Slide 27: Primero West-1 Drilling Results

    Primero West-1 Drilling Results Primero West-1 Results • Successfully drilled in accordance with the requirements of the Joint Operating Agreement to appraise the “Primero Gas Sand” in the Cattle Creek Formation • Located ~650m west of AOE-1 • Shallow conventional reservoir, TD 250m • Challenging dr

  28. Slide 28: Primero West-1 Well Correlation

    Primero West-1 Well Correlation Primero West-1 Aldinga East-1 Aldinga West-1 Primero-1 CATTLE CREEK FORMATION highest known water SCD Rig-25 on location at Primero West-1 Datum = 0 mSS 28

  29. Slide 29: Primero West-1 Drilling Results

    Primero West-1 Drilling Results Cattle Creek Formation conventional play: • Gas encountered from 131.5m within the Cattle Creek Formation • Average porosity ~20% • Average Sw ~ 40% (petrophysical uncertainty on Rw, a, m and n) • Net gas-bearing zone of up to 12.5m • Maximum gas flow rate of 0.436 mm

  30. Slide 30: CSG Volumetrics

    CSG Volumetrics 30

  31. Slide 31: Basis of CSG volumetrics; 1

    Basis of CSG volumetrics; 1 • Average Raw Gas content: 11.6 m3/t (to date). Gas content for thickest seams currently ~13 m3/t. Reids-1 data indicate 7.1 – 14.6 m3/t with average 11.8 m3/t. Other Bowen Basin CSG projects have approximately 7 – 14 m3/t. • DAF values*: State Gas have raw gas rather tha

  32. Slide 32: Basis of CSG volumetrics; 2

    Basis of CSG Volumetrics; 2 • Area: • Well correlations used to establish extent of coal seams Permit boundary • Geological map overlain with 1 km2 grid • Area of Lower Aldebaran Sst outcrop assumed to mimic the maximum limit of viable CSG (P1=120 km2). Minimum area (P99=60 km2) assumed to be less t

  33. Slide 33: Increasing hydrocarbon content from south to north

    RDB Regional Gas Composition Trends: Hydrocarbon Content Trend • CO2 content generally reducing with depth: AOE-1 and Westgrove-3, 99.9% Meteor-1 which showed <3% CO2 at 3,750m • CO2 diminishing from south to north across PL-231 area • Variability most likely related to stratigraphy and geologic dom

  34. Slide 34: RDB CSG water production

    RDB CSG water production The volume and rate of CSG water production at Reids Dome is currently unknown, however: • Nyanda-4 DST#3 indicates ~100 psi over-pressure • Over-pressure means that the reservoir is closer to the desorption isotherm, and less de- watering is required to commence gas product

  35. Slide 35: RDB Tight-gas Volumetrics

    RDB Tight-gas Volumetrics 35

  36. Slide 36: Reid's Dome Conventional Gas - Analogues

    Reid’s Dome Conventional Gas –Analogues Regional Analogues: APLNG’s Merivale Gasfield and Westgrove Deep Gas Play (PL-44) • Merivale gasfield: • Regional anticline located on-trend 40 km south of PL-231 • Reid’s Dome Beds conventional sandstone below 1492 m • Merivale-2, 5, 6 & 8; DST and Production

  37. Slide 37: PL-231; Reids Dome Deep Prospect Potential

    PL-231; Reids Dome Deep Prospect Potential • AOE-1 tested gas at low rates from two sandstones in the Reids Dome Beds (RDB) • Prospective section: >2500m (450 – 3000 m+) • Continuing gas shows at TD in Nyanda-4 indicate strong likelihood of a deeper tight gas play >1200m 90% 10% Monte Carlo Assessme

  38. Slide 38: Cattle Creek Formation Exploration Opportunity at PL-231 Reids Dome

    Cattle Creek Formation Exploration Opportunity at PL-231 Reids Dome 38

  39. Slide 39: Seismic evaluation of Cattle Creek gas at PL-231

    Seismic evaluation of Cattle Creek gas at PL-231 39

  40. Slide 40: Cattle Creek Prospectivity

    Cattle Creek Prospectivity Possible Reids Domelocation NW-1 Cattle Creek Gas sand time structure map Reids Dome NW-1 Cattle Creek Gas Sand Cattle Creek Gas Sand 0 Km 1. 0 Gas Probability Map showing potential exploration target Cattle Creek Leads • Primero West-1 confirmed reprocessed seismic signat

  41. Slide 41: Development Scenario

    Development Scenario 41

  42. Slide 42: Conceptual PL-231 appraisal and development

    Conceptual PL-231 appraisal and development PHASE-1: • Reprocess WOWCO seismic survey • Nyanda-4 conventional and CSG flow test • 2 x RDB vertical appraisal CSG wells with extensive cores and multiple DST’s • Review results and conduct scoping economics PHASE-2: • RDB CSG production pilots, 6-12 ver

  43. Slide 43: Reids Dome Time-Line

    Reids Dome Time-Line 1954: gas discovered by AOE Reids Dome-1 1975-2006: 13 wells drilled to appraise Cattle Creek gas sand Jul. 2018: State Gas reviews historic data Nov 2018: drilling 2018: Large new CSG play discovered 43

  44. Slide 44: State Gas Capital Structure

    State Gas Capital Structure Shareholder Shares Held % Founders, Directors & related entities 80.8 million 60% Public 54.6 million 40% TOTAL* 135.4 million 100% *Excludes 7 million management options exercisable between $0.20 and $0.60 with vesting conditions and 2.5 million performance shares issued

  45. Slide 45: Contacts

    Contacts Silver City Rig- 25 drilling Nyanda-4 during November 2018 Lucy Snelling Greg Baynton CEO Executive Director State Gas Limited State Gas Limited m: +61 439 608 241 m: +61 414 970 566 lucy@stategas.com greg@stategas.com www.stategas.com ASX: GAS 45