Hillgrove Resources Limited · ASX:HGO

Hillgrove Resources — Shareholder Meeting (June 2010)

59 slides from Hillgrove Resources's shareholder meeting presentation, Jun 22, 2010

  1. Slide 1: Annual General Meeting: Chairman's Address

    ANNUAL GENERAL MEETING CHAIRMAN’S ADDRESS 22 JUNE 2010

  2. Slide 2: Financial Results 2010

    FINANCIAL RESULTS 2010 PLUS PRIOR THREE YEARS 31 January 31 January 31 January 31 January Results for the 2007 2008 2009 2010 Year Ended $M $M $M $M Revenue and 0.3 0.6 46.8 98.2 other income Profit/(loss) after tax 10.8 (4.9) 11.1 55.6 Earnings per share 4.9 (2.0) 3.0 12.7 – diluted (cents) 2

  3. Slide 3: Net Assets 2010

    NET ASSETS 2010 PLUS PRIOR THREE YEARS N t Assets Net A t ($m) ($ ) 200.0 175.0 163.8 150.0 125.0 100.0 84.2 75.0 55.2 50.0 38.7 25.0 0.0 2007 2008 2009 2010 3

  4. Slide 4: Annual General Meeting 2010 Resolutions

    ANNUAL GENERAL MEETING 2010 RESOLUTIONS RESOLUTION 1 That the Remuneration Report in the 2010 Annual Report of the Company be adopted. adopted RESOLUTION 2 That Mr Ronald Belz is elected as a Director off the C Company. RESOLUTION 3 That the Hon. Dean Brown is elected as a Director of the Company. R

  5. Slide 5: Annual General Meeting: Managing Director's Presentation

    ANNUAL GENERAL MEETING MANAGING DIRECTORS PRESENTATION 22 JUNE 2010

  6. Slide 6: Disclaimer

    DISCLAIMER This presentation should not be relied upon as a representation of any matter that a potential investor or their adviser should consider in evaluating the Company. Potential investors must make their own independent assessment and investigation of the matters contained herein and should n

  7. Slide 7: Competent Persons Statement

    COMPETENT PERSONS STATEMENT The information in this report that relates to Exploration Results at the Kanmantoo Copper Mines is based on information compiled by Mr Richard Bradey, who is a Member of The Australasian Institute of Mining and Metallurgy. Mr. Bradey is the Kanmantoo Project Geology Mana

  8. Slide 8: Key Assets 2010

    KEY ASSETS 2010 AUSTRALIAN MINER WITH ASIAN GROWTH PIPELINE MINING ❙ Kanmantoo: oxide copper heap leach - 100% DEVELOPMENT ❙ Kanmantoo Copper/Gold Mine: 2.4MTpa →2.7MTpa - 100% EXPLORATION ❙ Bird’s Head, Indonesia: copper/gold and gold - 80% ❙ Sumba, Indonesia: gold - 80% ❙ Kanmantoo, SA: copper/gol

  9. Slide 9: Metals Outlook 2010: Copper on the Move

    METALS OUTLOOK 2010 COPPER ON THE MOVE THE RIGHT COMMODITIES AT THE RIGHT TIME MACQUARIE BANK COMMODITIES, 9 JUN 2009 “Looking further out, in our view, copper has the best fundamentals of any of the base metals, metals and should go into an economic upturn with low stocks, limited idle capacity and

  10. Slide 10: Kanmantoo Copper Mines Snapshot

    KANMANTOO COPPER MINES SNAPSHOT EL4401 10

  11. Slide 11: Kanmantoo Copper Mines 2010

    KANMANTOO COPPER MINES 2010 11

  12. Slide 12: Resources / Reserves

    KANMANTOO COPPER MINES RESOURCES / RESERVES Total (0.25% Cu Cut Off Grade Model) Tonnes Cu Au Ag Cu Metal Au Ag Type Kt % g/t g/t Tonnes Ounces Ounces Oxide 1,125 0.8 0.2 3.3 8,600 6,900 121,000 Transitional 1,620 0.8 0.2 2.9 12,200 9,600 152,000 Fresh 29,447 0.9 0.2 3.2 271,500 174,600 3,040,700 To

  13. Slide 13: Kanmantoo Copper Mines Ore Body

    KANMANTOO COPPER MINES ORE BODY 13

  14. Slide 14: Kanmantoo Mines Site Plan

    KANMANTOO MINES SITE PLAN NW Z Zone ❙ Copper-gold mineralisation is predominantly parallel to the north- Waste Rock southth axial i l planar l ffoliation li ti with ith Stockpile influence from a conjugate extensional shear zones NE Zone ❙ Mineralisation is complex. There is Main Zone evidence of pr

  15. Slide 15: Near Mine Prospects

    KANMANTOO COPPER MINES NEAR MINE PROSPECTS 15

  16. Slide 16: Kanmantoo Copper Mines Summary

    KANMANTOO COPPER MINES SUMMARY Resources: 292,700 tonnes copper @ 0.9% 194,700 ounces gold @ 0.2g/t 3,326,300 , , ounces silver @ 3.2g/t g Reserves: 14.8MT @ 0.85% copper 0.17g/t gold and 3.1g/t silver Mi i St Mining Stage 1: 1 O id heap Oxide h lleachh operation ti 450t 450tpa contained t i d coppe

  17. Slide 17: Low Cost Setting

    KANMANTOO COPPER MINES LOW COST SETTING 9 Connected to national grid 9 Retreated waste water to process water 9 Preferred employment destination 9 Close to export port of Port Adelaide 17

  18. Slide 18: Pit Design

    KANMANTOO COPPER MINES PIT DESIGN 18

  19. Slide 19: Ore Processing Flow

    Lime KANMANTOO MINES ROM FEED ORE PROCESSING FLOW VIBRATING BIN BIN PRODUCT GRIZZLY SCREEN NEUTRAL- FEEDER ISATION JAW TANK CRUSHER PROCESS STOCK WATER SECONDARY HYDRO PILE TANK CRUSHER CYCLONE SAG MILL PEBBLE CRUSHER FLOATATION REAGENTS ROUGHER FLOATATION FLOATATION REAGENTS CLEANER FLOATATION TAIL

  20. Slide 20: A Copper Producer at Last

    KANMANTOO COPPER MINES A COPPER PRODUCER AT LAST RESULTS OF QUARTERLY OXIDE ORE OPERATIONS February March April Total YTD $ $ $ $ Sales Revenue 333,546 270,181 280,692 884,419 Copper pp Sales (tonnes) ( ) 51.5 40.3 44.4 136.2 Sales Revenue per tonne 6,481 6,698 6,322 6,493 Sales Revenue per lb 2.94

  21. Slide 21: Pillara Process Plant

    KANMANTOO COPPER MINES PILLARA PROCESS PLANT Second hand processing plant purchased from Pill in Pillara i WA prior i to dismantling

  22. Slide 22: Pillara Process Plant Aerial Photo - Before

    KANMANTOO COPPER MINES PILLARA PROCESS PLANT AERIAL PHOTO - BEFORE 22

  23. Slide 23: Pillara Process Plant Aerial Photo - The Plant Now

    KANMANTOO COPPER MINES PILLARA PROCESS PLANT AERIAL PHOTO – THE PLANT NOW 23

  24. Slide 24: Pillara Process Plant COS Feed Conveyor Dismantle

    KANMANTOO COPPER MINES PILLARA PROCESS PLANT COS FEED CONVEYOR DISMANTLE 24

  25. Slide 25: Pillara Process Plant Grinding Area

    KANMANTOO COPPER MINES PILLARA PROCESS PLANT GRINDING AREA 25

  26. Slide 26: Pillara Process Plant Cyclone Structure Above Mills

    KANMANTOO COPPER MINES PILLARA PROCESS PLANT CYCLONE STRUCTURE ABOVE MILLS 26

  27. Slide 27: Pillara Process Plant Mills

    KANMANTOO COPPER MINES PILLARA PROCESS PLANT MILLS 27

  28. Slide 28: Pillara Process Plant Flotation Building Roof

    KANMANTOO COPPER MINES PILLARA PROCESS PLANT FLOTATION BUILDING ROOF 28

  29. Slide 29: Pillara Process Plant Trough Float Cell Being Lifted

    KANMANTOO COPPER MINES PILLARA PROCESS PLANT TROUGH FLOAT CELL BEING LIFTED 29

  30. Slide 30: Pillara Process Plant Float Building and Mills

    KANMANTOO COPPER MINES PILLARA PROCESS PLANT FLOAT BUILDING AND MILLS 30

  31. Slide 31: Pillara Process Plant Concentrate Thickener Mid Section

    KANMANTOO COPPER MINES PILLARA PROCESS PLANT CONCENTRATE THICKENER MID SECTION 31

  32. Slide 32: Pillara Process Plant Clear of Floatation & Grinding Footings

    KANMANTOO COPPER MINES PILLARA PROCESS PLANT CLEAR OF FLOATATION & GRINDING FOOTINGS 32

  33. Slide 33: Dismantling and Transport of Plant

    KANMANTOO COPPER MINES DISMANTLING AND TRANSPORT OF PLANT Dismantling is nearly complete and loads arriving in SA at lay down area ready for construction 33

  34. Slide 34: Mining Operations

    KANMANTOO MINES MINING OPERATIONS ❙7 month pre-strip ❙14.8MT ore ❙69.8MT waste ❙Operating strip ratio 4.9:1 34

  35. Slide 35: Mining Operations

    KANMANTOO MINES MINING OPERATIONS 35

  36. Slide 36: Capital Costs

    KANMANTOO COPPER MINES CAPITAL COSTS C t t Works Contract W k O i i lB Original Budget d t Estimated E ti t d total t t l Expenditure A$000 A$000 Mining 25,589 15.376 Process Plant (incl. Secondary crusher) 70,015 58.072 Infrastructure 17,331 9,072 Owners Team 4,571 4,302 Owners Costs 8,454 9,178 To

  37. Slide 37: Uniquely Positioned

    KANMANTOO COPPER MINES UNIQUELY POSITIONED ❙Only Australian mid-cap copper developer with production planned to start in 2011: 9 $90.7 million capex, net of sunk costs 9 Mining Lease 6345 granted and MARP approved 9 All feasibility studies, metalurgical testing completed 9 Freehold land of 835ha (2,

  38. Slide 38: Regional Pipeline Indonesia

    REGIONAL PIPELINE INDONESIA HIGHLY PROSPECTIVE ADVANCED GOLD EXPLORATION 38

  39. Slide 39: Indonesia Bird's Head Project: Regional Setting

    INDONESIA BIRD’S HEAD PROJECT REGIONAL SETTING Bird’s Head covers part of the interpreted westward continuation of the New Guinea ‘Orogenic Belt’ 39

  40. Slide 40: Indonesia / New Guinea Deposits

    BIRD’S HEAD PROJECT INDONESIA / NEW GUINEA DEPOSITS Five of Top 20 Know Gold-Rich Porphyry Copper Deposits1 Rank Deposit Province Tonnage Au Au Cu Cu (Mt) (g/t) (t) (Wt %) (Mt) 1. Grasberg East Papua 2,480 1.05 2,604 1.13 28.02 7. Panguna Bougainville 1,415 0.57 799 0.46 6.51 9. Batu Hijau Sumbawa 1

  41. Slide 41: IUP Area and Drainage Anomalies by Gold

    BIRD’S HEAD PROJECT IUP AREA AND DRAINAGE ANOMALIES BY GOLD Work by Normandy and past explorers highlighted 16 high order anomalies, with Bird’s Head now containing the most prospective 41

  42. Slide 42: Bird's Head Delta Prospect: West Delta Area

    BIRD’S HEAD DELTA PROSPECT WEST DELTA AREA Over 5m silica-pyrite-albite altered monzonite it with ith malachite l hit after ft fifine grained chalcocite in hanging wall Close up of above hanging wall rock with quartz-sulphide veining/stockwork Clay altered & brecciated monzonite it

  43. Slide 43: Bird's Head Delta Prospect: Green Cliffs

    BIRD’S HEAD DELTA PROSPECT GREEN CLIFFS Plan View of a 3D Inversion Model clipped at -500R.L 500R L and overlaid by historical rock chip samples and drilling 43

  44. Slide 44: Bird's Head Delta: Green Cliffs

    BIRD’S HEAD DELTA GREEN CLIFFS Outcrop map of the Green Cliffs Breccia Area with channel samples by copper 44

  45. Slide 45: Interpretative Cross Section for West Delta

    BIRD’S HEAD DELTA PROSPECT INTERPRETATIVE CROSS SECTION FOR WEST DELTA 45

  46. Slide 46: Bird's Head Alpha Prospect

    BIRD’S HEAD ALPHA PROSPECT GOLD (G/T) SOIL GEOCHEMISTRY 1 Kilometre Batu Hijau Extensive gold mineralisation, which appears to be strongly structurally controlled 46

  47. Slide 47: Bird's Head Alpha Prospect: Drilling, Trenching Locations

    BIRD’S HEAD ALPHA PROSPECT DRILLING, TRENCHING LOCATIONS ON GOLD SOIL GEOCHEMISTRY ❙Bonanza trenching grades: gold associated with epithermal quartz veins ❙ Very limited drilling B15 Anomaly completed to date with A17/19 Anomaly only 5 drill holes ❙Significant scout drilling results including 17.45m

  48. Slide 48: Indonesia Sumba Island Project

    INDONESIA SUMBA ISLAND PROJECT 80% ❙IUP Explorasi No 322/kep/HK/2009 granted on 2 November for six years on Sumba covering an area of 99,970 hectares or 999km2 ❙Hillgrove’ss Indonesian partner PT Fathi Resources free carried to decision to mine with 20% interest ❙Hillgrove ❙Sumba offers a leg up int

  49. Slide 49: Sumba Project: Masu Current Focus

    SUMBA PROJECT MASU: CURRENT FOCUS 49

  50. Slide 50: Sumba Project: Masu Current Focus

    SUMBA PROJECT MASU: CURRENT FOCUS 50 50

  51. Slide 51: Sumba Project: Pahandanjal Prospect Western Lode

    SUMBA PROJECT PAHANDANJAL PROSPECT Western Lode ❙Potential to host multiple, high- grade, fracture-controlled f vein systems of comparable grades and dimensions to high grade epithermal ith l llow sulphidation l hid ti systems mined elsewhere in Indonesian archipelago ❙Outcropping vein zone reveals

  52. Slide 52: Sumba Project: Pahandanjal Prospect Eastern Lode

    SUMBA PROJECT PAHANDANJAL PROSPECT Eastern Lode ❙Eastern Vein system strikes NNW and outcrops over at least 600m, but exhibits multiple intersecting lodes which vary f from ENE to t ESE ❙Trenching indicate low grade alteration halo to many lodes ❙ENE / WNW trending lodes generally occur as brecciate

  53. Slide 53: Sumba Project: Pahandanjal Prospect

    SUMBA PROJECT PAHANDANJAL PROSPECT 53

  54. Slide 54: Indonesia Bauxite: Projects Highlights

    INDONESIA BAUXITE BAUXITE PROJECTS HIGHLIGHTS Highlights p ❙Options secured over 70% of companies p controllingg 1,400km² , of ggranted bauxite exploration p licenses in West Kalimantan in Indonesia ❙Licences adjacent to large, established bauxite resources and active bauxite mining operations ❙Baux

  55. Slide 55: Selected Published Bauxite Resource Grades

    BAUXITE PROJECTS SELETED PUBLISHED BAUXITE RESOURCE GRADES Deposit Owner Country Al2O3 Reactive Available Upgraded % Si % Al2O3 % 1North Darling Range Ba ite Resources Bauxite Reso rces A stralia Australia 43 1 43.1 32 3.2 31 6 31.6 2Worsley BHP Billiton Australia NS 2.1 31.1 2MRN BHP Billiton Brazi

  56. Slide 56: Bauxite Projects Landak

    BAUXITE PROJECTS LANDAK TENEMENTS 48.8% Al2O3 ( (washed)) SELETED PUBLISHED BAUXITE RESOURCE GRADES Tayan (ANTAM)* 30.9mt @ 47.5% Al2O3 (washed P & P Reserves) Munggu Pasir (ANTAM)* 40mt @ 46.6% Al2O3 (washed Probable Reserve) TAYAN SOUTH Bauxite Resource 56

  57. Slide 57: Landak Project Tenure and Reconnaissance Sampling

    BAUXITE PROJECTS LANDAK PROJECT LANDAK PROJECT TENURE AND RECONNAISSANCE SAMPLING Al2O3 GRADE MAP 57

  58. Slide 58: Investment Summary

    KEY ASSETS 2010 INVESTMENT SUMMARY 9 Strong Balance Sheet: $101 million cash 9 Targeting discovery of world class gold and copper/gold ore bodies: 2,815 km² – West Papua and Sumba 9 Kanmantoo Copper/Gold Mine: Oxide heap leach moving to 2.4MTpa mine with 2011 concentrate production plus significant

  59. Slide 59: Kanmantoo Copper Mines 2010

    KANMANTOO COPPER MINES 2010 59

Hillgrove Resources — Shareholder Meeting (June 2010) on 6ix