Stanmore Resources Ltd · ASX:SMR

Stanmore Resources — Stanmore Coal — Mines and Money Hong Kong (March 2013)

18 slides from Stanmore Resources's conference presentation, Mar 18, 2013

  1. Slide 1: Company Presentation March 2013

    For personal use only Company Presentation March 2013

  2. Slide 2: Important Information

    Important Information This document has been prepared by Stanmore Coal Limited (“Stanmore Coal”) for the purpose of providing a company and technical overview to interested analysts/investors. None of Stanmore Coal, nor any of its related bodies corporate, their respective directors, partners, emplo

  3. Slide 3: About Stanmore Coal

    About Stanmore Coal  ASX code - SMR  94Mt of JORC For personal use only  Pure play, Queensland  975-1,498 Mt(2) of based coal company  Share price - A$0.205(3) Marketable additional exploration targets Reserves(1)  Founded in 2008  Shares – 207.8m  Mkt cap - $42.6m(3)  686.2Mt of JORC  c.7

  4. Slide 4: Company Highlights

    Company Highlights 1 Attractive pipeline of Queensland coal projects For personal use only − Belview (Bowen Basin) high quality underground coking coal on existing rail line − The Range (Surat Basin) open-cut 5Mtpa (product) export thermal coal. BFS nearing completion − Other prospective thermal, P

  5. Slide 5: Belview Project Overview

    Belview Project Overview Acquisition of EPC 1186 Creates Large Coking Coal Project in Bowen Basin region 100% owned For personal use only  Substantial underground coking coal project in heart of the Bowen Basin  Acquisition of EPC1186 provides access to shallower coking coal (circa 385m depth) and

  6. Slide 6: Belview Project – Concept Study Results

    Belview Project – Concept Study Results EPC 1186 significantly reduces the initial depth of mining For personal use only Asset description Project ownership 100% Location Blackwater, Bowen Basin, Qld JORC Inferred Resource 95Mt Exploration target1 735-1,103Mt Infrastructure solution Blackwater line,

  7. Slide 7: Belview Project Concept Study Economics

    Belview Project Concept Study Economics Shallower mining depth reduces capex and operating costs Capital Estimate – Single Longwall For personal use only Capital Item Estimate (A$M)  The project capital costs for a single longwall Longwall 172 operation used for financial analysis in this Developme

  8. Slide 8: Belview Project Timetable

    Belview Project Timetable First coal target 2017  Concept study estimates underground development can commence in 2017 and longwall mining can For personal use only commence in late 2018 Source: Xenith Concept Mining Study 8

  9. Slide 9: The Range Thermal Coal Project – Surat Basin

    The Range Thermal Coal Project – Surat Basin Open cut, high energy, export grade thermal coal mine 100% owned For personal use only  5Mtpa open cut export thermal coal mine over 26 years  High energy, low emission thermal coal sought after in Asian markets including Japan and Taiwan  Capital cost

  10. Slide 10: Tennyson Thermal Coal Project – Bowen Basin

    Tennyson Thermal Coal Project – Bowen Basin Underground, export grade thermal coal 100% owned For personal use only  Maiden JORC Inferred Resource of 161Mt2 from within the 2.5m thick Aries seam at a depth of 150m to 480m  Additional exploration Target1 of 65 – 120Mt established  High energy expo

  11. Slide 11: Asset Development Schedule

    For personal use only Asset Development Schedule Asset 2H12 1H13 2H13 2014 Beyond 2015 -2017: Drilling commences EPC 1186 Belview PFS BFS & Approvals Construction Update Concept Study 2017: First coal Mid 2014: The Range BFS & Supplementary EIS Obtain ML grant 2016: First coal Construction Maiden JO

  12. Slide 12: Supplementary Slides

    For personal use only SUPPLEMENTARY SLIDES 12

  13. Slide 13: Strong Board and Management Team

    Strong Board and Management Team NEVILLE SNEDDON NICK JORSS STEPHEN BIZZELL VIV FORBES ANDREW MARTIN For personal use only Managing Director Director Director Chairman Director Mining engineer with 37 years 20 years in engineering, Extensive experience in Over 40 years of Bowen Basin 15+ years in in

  14. Slide 14: Reserves, Resources and Targets

    For personal use only Reserves, Resources and Targets JORC JORC JORC Measured JORC Indicated JORC Inferred Total JORC Additional Exploration Project Marketable Coal Recoverable Resource (1) Resource (1) Resource (1) Resource (1) Target (3) Reserve (1) (2) Coal Reserve (1) (2) Low High The Range Ther

  15. Slide 15: Energy Demand is driven primarily by Asia

    Energy Demand is driven primarily by Asia… For personal use only Source: Wood Mackenzie Global Energy & Metals Forum 2012 15

  16. Slide 16: With the bulk of supply to come from Pacific basin coal

    … with the bulk of supply to come from Pacific basin coal IEA forecasts coal demand to grow 65% by 2035, overtaking oil as the largest supply of energy  Demand for energy coal, as a result of For personal use only increased power-generation requirements, will be met by the seaborne market  Thermal

  17. Slide 17: QLD coal well positioned to meet the supply gap

    QLD coal well positioned to meet the supply gap Australia will increase its share of the export market…  Australian coals will increase their share of For personal use only the global seaborne market from 20% to 28% due to factors such as:  superior coal quality;  proximity to end-user market (As

  18. Slide 18: Long term freight rate fundamentals favour Australian coal

    Long term freight rate fundamentals favour Australian coal  In the short term, low freight rates, when Recent freight rate pricing has been volatile with historic freight differentials less pronounced… For personal use only combined with low natural gas prices, make Shipping rates from export origi