Empire Metals Limited · LSE:EEE
Empire Metals — Investor Presentation (November 2025)
19 slides from Empire Metals's investor presentation, November 2025
Slide 1: Advancing a Globally Significant Titanium Discovery
Supplying the Future Advancing a Globally Significant Titanium Discovery Corporate Presentation – November / December 2025 LON : EEE OTCQX : EPMLF
Slide 2: Disclaimer and Statements
Disclaimer and Statements This presentation (“Presentation”) has been prepared by Empire Metals Limited (“Empire” or the Competent Persons Statement “Company”) for information purposes only and may be subject to material updates, revision and The technical information in this report that relates to
Slide 3: Empire Metals: A Better Alternative in a Disrupted Titanium Market
Empire Metals: A Better Alternative in a Disrupted Titanium Market Western Globally Significant Tier-1 Western Australia Mineral Resource Estimate1A Australia Jurisdiction Pitfield 2.2Bt at 5.1% TiO2 Established mining and infrastructure Project hub with export access for 113Mt contained TiO2 Strong
Slide 4: Titanium is a Strategic Commodity Powering Critical Industries
Titanium is classified as a Critical Mineral by the U.S., EU, Titanium is a Strategic Commodity UK, Canada, South Korea, Powering Critical Industries Australia, and Japan Aerospace & Defense • Aircraft engines & landing gear • Missiles • Armoured vehicles & submarines • Critical Metal needed now and
Slide 5: Low Cost, Premium Titanium is in Short Supply
Titanium demand is growing, while the industry Low Cost, Premium Titanium needs production from a new source* is in Short Supply 12000 10000 '000 Tonnes TiO2 8000 6000 $24B Market Size in 2024* 3.7% CAGR from 2023-2030* 4000 2000 Pigment Sponge The titanium market is geopolitically significant and c
Slide 6: Most Titanium Starts as Low-Grade Ore and Requires Costly, Polluting Processes. Not Ours.
Most Titanium Starts as Low-Grade Ore and Requires Costly, Polluting Processes. Not Ours. Pitfield offers a better alternative for direct high-purity titanium supply to the market ✓ High-Purity Ore, ✓ Minimal waste, High Purity 99.25% lower CO₂ TiO2 Product ✓ Multi-generational ✓ Higher continuous m
Slide 7: Pitfield: World Class Project Location
Pitfield: World Class Project Location Development significantly derisked by location in Tier-1 mining jurisdiction with direct access to critical infrastructure and global shipping routes Prime Location in Western Australia → Situated in the Mid-West region, a well-established mining and agricultur
Slide 8: Pitfield: One of the Largest and Highest-Grade Titanium Resources Reported Globally
Pitfield: One of the Largest Exceptional Drill Results informed and Highest-Grade Titanium the MRE 44m at 7.87% TiO2 Resources Reported Globally from surface [AC25TOM159] 1 98m at 7.05% TiO2 from 2m depth [RC25TOM062] A giant high-grade titanium deposit with exceptional continuity 148m at 6.49% TiO2
Slide 9: High-Value In-Situ Weathered Cap
High-Value In-Situ Weathered Cap High-purity titanium dioxide minerals at surface MRE* contains an in-situ weathered zone of 1.3Bt at 5.2% TiO2 containing 66Mt TiO2 → Highest TiO2 grades within in-situ weathered cap, 40-60m deep from surface, containing predominantly anatase and rutile → Anatase and
Slide 10: Rapid Product Development Success: +99% TiO2 product achieved
Rapid Product Development Success: +99% TiO2 product achieved Advancement of a pathway to a high-value commercial product based on conventional metallurgical processing steps Reviewing data from the SEM at the AMI laboratory in Perth → High-purity final product achieved: TiO2 grading 99.25% with neg
Slide 11: Processing – Mine to Final Product
Processing – Mine to Final Product An efficient and simplified pathway to a high-purity titanium dioxide product → Low-Energy Processing Scrubbing and desliming take advantage of Pitfield's friable, in-situ weathered saprolite and sandstone, reducing energy costs → Conventional Separation Methods Gr
Slide 12: Looking forwards
Looking forwards Key Project Milestones What’s Coming in Q4 2025 - 2026 Thomas infill drilling Q4 2025, Cosgrove infill drilling 2026, targeting MRE growth in 2026 Results from metallurgical studies on the in-situ weathered zone Bulk testwork and flowsheet design confirming low-cost processing route
Slide 13: Capital Structure
Capital Structure Empire Metals is a constituent of the AIM 100 Index, OTCQX- quoted and recently raised £7M from institutional shareholders and is planning an ASX dual listing in 2026 Ticker LON:EEE OTCQX:EPMLF Market Cap* £215M $291M USD Share Price* 30.20p $0.41 USD Shares on Issue 710,893,221 71
Slide 14: Board of Directors
Board of Directors Focused on discovery, development and value creation Neil O’Brien Phil Brumit Non-Executive Chairman Non-Executive Director Former SVP Exploration & New Business Development at Lundin Veteran mining engineer and operations expert, delivering major Mining (Retired 2018). Extensive
Slide 15: Technical Excellence
Technical Excellence An exceptional technical team in Perth, WA Andrew Faragher Narelle Marriott Exploration Manager Process Development Manager Former Rio Tinto Exploration Manager with over 25 years’ Former BHP Snr Process Engineer and recently General Manager experience working across multiple co
Slide 16: Empire Metals: The Next Generation for Titanium
Empire Metals: The Next Generation for Titanium Pitfield is exceptional and capable of meeting future Giant scale, long life growth in world demand over a multi-generational timeline Titanium metal and high-purity TiO2 feedstocks High-value high-purity attract premium pricing – high demand, end prod
Slide 17: Disclaimer
Disclaimer Continued from Page 2 This Presentation has not been approved by any authorised person pursuant to Section 21(2)(b) of the Financial Services and Markets Act 2000 ("FSMA") and This Presentation contains confidential information regarding the Company. Your is therefore being issued for inf
Slide 18: Contact details
info@empiremetals.com London: 6 Heddon Street, London W1B 4BT, UK Perth: 506A Hay Street, Subiaco WA 6008, Australia +44 (0) 20 4583 1440 www.empiremetals.com LON : EEE OTCQX : EPMLF
Slide 19: Appendix: Pitfield Project Mineral Resource Statement
Appendix: Pitfield Project Mineral Resource Statement Effective October 2025 Indicated Inferred Total Mineral Resource Cut-Off Tonnes Grade Tonnes Tonnes Grade Tonnes Tonnes Grade TiO2 Tonnes Material Type TiO2 (%) (Mt) (%) (kt) (Mt) (%) (kt) (Mt) (%) (kt) Thomas Deposit, Pitfield Laterite 33 3.0 1,
Empire Metals — Investor Presentation (November 2025) on 6ix