  1. Slide 1: Investor Presentation

    Investor Presentation June 2015 HBM INVESTOR PRESENTATION

  2. Slide 2: Cautionary Information

    Cautionary Information This presentation contains "forward-looking statements" and "forward-looking information" (collectively, "forward-looking information") within the meaning of applicable Canadian and United States securities legislation. All information contained in this presentation, other tha

  3. Slide 3: Cautionary Information (continued)

    Cautionary Information (continued) The risks, uncertainties, contingencies and other factors that may cause actual results to differ materially from those expressed or implied by the forward-looking information may include, but are not limited to, the failure to successfully re-negotiate the recentl

  4. Slide 4: Cautionary Information (continued)

    Cautionary Information (continued) The technical and scientific information in this presentation related to the Constancia project has been approved by Cashel Meagher, P. Geo, Hudbay's Vice-President, South America Business Unit. The technical and scientific information related to all other sites an

  5. Slide 5: About Hudbay

    About Hudbay Integrated base and precious metals TSX, NYSE, BVL Symbol HBM mining company Market Capitalization1 $2.6 billion Operating mines, development projects and processing Shares Outstanding 235 million facilities located in the Americas Available Liquidity2 $0.5 billion Long track record of

  6. Slide 6: Recent Achievements and Challenges

    Recent Achievements and Challenges ACHIEVED OUR GROWTH OBJECTIVES  Copper production and operating cost guidance achieved 777  2014 zinc and precious metal production below guidance Production  Commercial production achieved ahead of Reed guidance and under budget  Achieved commercial production

  7. Slide 7: Near-Term Production Growth

    Near-Term Production Growth1 OPPORTUNITY FOR A RE-RATE IS SIGNIFICANT AS WE DELIVER GROWTH 320% 145% 50% INCREASE IN CU PRODUCTION INCREASE IN AU-EQ. PRODUCTION2 INCREASE IN ZN PRODUCTION (kt) (koz) (kt) 200 250 150 200 150 100 150 100 100 50 50 50 - 3 - - 3 3 2014A 2015G 2016E 2014A 2015G 2016E 201

  8. Slide 8: Constancia Project

    Constancia Project ACHIEVED COMMERCIAL PRODUCTION Approximately 21 million hours Life of Mine1 worked with only one lost time Ownership 100% accident in 2014 Daily ore throughput 80k tpd Reached commercial Avg. annual Cu production2 82k tonnes production on April 30, 2015 Cash cost per Cu lb3 US$1.2

  9. Slide 9: Constancia Update

    Constancia Update ACHIEVED COMMERCIAL PRODUCTION Plant performing as designed and throughput has occasionally exceeded nameplate with peaks of over 90,000 tpd Copper recovery in April averaged just over 65%, in line with ramp up design and expectations Concentrate grade averaged 27% copper year-to-

  10. Slide 10: Constancia Update

    Constancia Update RAMP UP IN LINE WITH EXPECTATIONS January and February impacted by normal commissioning issues at processing plant Plant operating at or above design capacity Tonnes of Ore Processed Daily Monthly Copper Grade (%) (Average) January 418,681 13,506 0.36 February 493,756 17,634 0.40 M

  11. Slide 11: Constancia Update

    Constancia Update FOCUS HAS SHIFTED TO RECOVERY Focus is on increasing copper recovery while maintaining throughput and concentrate quality Concentrate regrind circuit started recently Mining fleet performance approaching design expectations; peak ore production rates of over Constancia mining fleet

  12. Slide 12: Recent Constancia Photos

    Recent Constancia Photos Constancia pit Constancia tailings thickener Constancia flotation cell Constancia Constancia mill observing mill observing EarthEarth Hour,Hour, MarchMarch 20152015 INVESTOR PRESENTATION 12

  13. Slide 13: Recent Constancia Photos (Cont'd)

    Recent Constancia Photos (Cont’d) Constancia molybdenum plant Constancia crushed ore stockpile Tailings management facility Initial copper concentrate stored in concentrate shed INVESTOR PRESENTATION 13

  14. Slide 14: 777 Mine

    777 Mine STEADY, LOW-COST PRODUCTION Life of Mine1 6 lost-time accidents over past 6 years Ownership 100% Mature mine with steady cost performance Daily ore throughput 4,500 tpd Exploration to focus on recently optioned War Baby claim Avg. Annual Cu production2 25k tonnes Avg. Annual Zn production2

  15. Slide 15: Lalor Mine

    Lalor Mine OPERATING AT STEADY STATE Life of Mine1 Over 1,000 days without a lost-time accident Ownership 100% Daily ore throughput 3,300 tpd Main production shaft complete and operating at Avg. annual Zn production2 59k tonnes a steady state; capacity of 6,000 tonnes per day Avg. annual Au-Eq. prod

  16. Slide 16: Lalor Exploration

    Lalor Exploration PHASE 2 UNDERGROUND EXPLORATION PROGRAM TO COMMENCE Phase 1 - preliminary underground Lalor Cross-Section1 with Exploration Ramp, Looking West drilling results confirm high grade nature of existing copper-gold zone 0m 14 drill holes completed, totalling Production 4,537 metres Shaf

  17. Slide 17: Reed Mine

    Reed Mine COMMERCIAL PRODUCTION ACHIEVED Life of Mine1 2-year construction program completed with Ownership 70% no lost-time accidents Daily ore throughput 1,300 tpd Avg. annual Cu production2 15k tonnes Achieved commercial production ahead of Cash cost per lb Cu3 $1.64/lb guidance and under budget

  18. Slide 18: Rosemont Project

    Rosemont Project 80%-OWNED1 COPPER PROJECT IN ARIZONA, USA Hudbay acquired control of Rosemont project in July 2014 Completed 43 hole confirmatory drill program with approximately 30,000 metres drilled Metallurgical test program and basic engineering review underway Permitting and community engageme

  19. Slide 19: Global Positioning on 2019E Copper Cost Curve

    Net Cash Costs (US$/lb Cu) Copper Production (bn lbs) 0.0 1.0 2.0 3.0 4.0 $0.00 $2.50 $5.00 ($7.50) ($5.00) ($2.50) Norilsk Codelco Jinchuan Freeport Boliden Glencore Vale BHP Hudbay (2019) Southern Cu Hudbay (2019) PF First Quantum Hudbay (2014) Rio Tinto Newcrest KGHM UGMK Antofagasta FIRST QUARTI

  20. Slide 20: High Quality Copper Growth Story

    High Quality Copper Growth Story Sector leading growth in copper, zinc and gold Attractive operating cost structure and improving unit margins with ramp up of new low-cost production Low geopolitical risk given focus on mining-friendly jurisdictions in the Americas Track record as mine developers an

  21. Slide 21: Appendix

    Appendix INVESTOR PRESENTATION 21

  22. Slide 22: Appendix Contents

    Appendix Contents By-product copper and zinc cost curves Global refined metal market balance Growth of mineral deposits 2015 guidance Lalor copper-gold zone exploration results Precious metals stream Reserves and resources INVESTOR PRESENTATION 22

  23. Slide 23: Copper & Zinc By-Product Cost Curves

    Copper & Zinc By-Product Cost Curves1 Source: Wood Mackenzie (2014 cost curves) 1. By-product costs calculated using Wood Mackenzie’s by-product costing methodology, which is materially different from the by-product costs reported by Hudbay in its public disclosure 2 .777 and Constancia by-product c

  24. Slide 24: Global Refined Metal Market Balance

    Global Refined Metal Market Balance Source: CRU, Copper Market Outlook and Zinc Market Outlook, January 2015 By 2019, both copper and zinc refined metal markets are expected to be in significant deficit INVESTOR PRESENTATION 24

  25. Slide 25: Growth of Mineral Deposits

    Growth of Mineral Deposits DISCOVERIES IN THE GREENSTONE BELT ∕∕ 62.5 Initial resource Added resource Lalor initial reserve 10.5 million tonnes Lalor added reserve 0 5 10 15 20 25 30 Tonnes (millions) INVESTOR PRESENTATION 25

  26. Slide 26: 2015 Production and Unit Cost Guidance

    2015 Production and Unit Cost Guidance Contained Metal in Concentrate1 2015 Guidance 2014 Production 2014 Guidance Manitoba2 Copper Tonnes 40,000 – 50,000 37,644 36,000 – 45,000 Zinc Tonnes 95,000 – 120,000 82,542 87,000 – 105,000 Precious Metals3 Ounces 85,000 – 105,000 85,703 99,000 – 120,000 Comb

  27. Slide 27: 2015 Production and Unit Cost Guidance

    2015 Production and Unit Cost Guidance Flin Flon Zinc Plant Zinc Concentrate Treated 190,000 – 235,000 tonnes Zinc Metal Produced 95,000 – 120,000 tonnes Unit Operating Costs1 C$0.31 - $0.38/lb 1. Forecast unit operating costs are calculated on the same basis as reported unit operating costs in Hudb

  28. Slide 28: 2015 Capital Expenditure Budget

    2015 Capital Expenditure Budget1 C$ Millions Sustaining Capital Manitoba 140 Peru 180 Total Sustaining Capital 320 Growth Capital Arizona 60 Peru 10 Total Growth Capital 70 Capitalized Exploration 35 Total Capital Expenditure 425 1. Excludes pre-production revenue, capitalized interest and capitaliz

  29. Slide 29: 2015 Exploration Budget

    2015 Exploration Budget C$ Millions Manitoba 20 Peru 5 Arizona 10 Generative and Other 20 Total Exploration Expenditures 55 Capitalized Spending1 (35) Total Exploration Expense 20 1. Assumes $20 million allocated to “Generative and Other” will be capitalized INVESTOR PRESENTATION 29

  30. Slide 30: Lalor Copper-Gold Zone Exploration Results

    Lalor Copper-Gold Zone Exploration Results Hole Core Length2 From (m) To (m) Cu (%) Au (g/t) Ag (g/t) Zn (%) (m) LX0001 52.66 245.42 298.08 2.71 7.22 15.92 0.18 Includes 6.96 245.42 252.38 6.29 12.16 25.85 0.31 Includes 11.58 286.50 298.08 8.30 25.43 54.89 0.59 LX0002 34.55 231.00 265.55 9.32 12.46

  31. Slide 31: Lalor Copper-Gold Zone Exploration Results

    Lalor Copper-Gold Zone Exploration Results Collar Location Core Azimuth Dip Length Hole NAD83 Zone NAD83 Zone Distance Below Size (degrees) (degrees) (m) 14 East 14 North Surface (m) LX0001 426785 6081394 1022 NQ 8.9 -63 605.1 LX0002 426785 6081394 1022 NQ 8.9 -68 311.0 LX0003 426784 6081394 1022 NQ

  32. Slide 32: Precious Metals Stream Overview

    Precious Metals Stream Overview US$750 million in upfront deposit payments from Silver Wheaton for delivery of: 100% of payable gold and silver from 777 mine until the end of 2016; and 50% of payable gold and 100% of payable silver thereafter for the remainder of life of mine 100% of payable silver

  33. Slide 33: Peru Mineral Reserves

    Peru Mineral Reserves As at January 1, 2014 Constancia Mineral Reserves Category Ore (M tonnes) Cu (%) Mo (g/t) Au (g/t) Ag (g/t) Proven 483 0.32 93 0.040 3.04 Probable 94 0.22 61 0.036 2.77 Pampacancha Mineral Reserves Category Ore (M tonnes) Cu (%) Mo (g/t) Au (g/t) Ag (g/t) Proven 23 0.52 142 0.2

  34. Slide 34: Peru Mineral Resources

    Peru Mineral Resources As at September 30, 2013 Constancia Mineral Resources Category M (tonnes) Cu (%) Mo (g/t) Au (g/t) Ag (g/t) Measured 68 0.22 59 0.036 2.17 Indicated 293 0.20 58 0.033 1.96 Inferred 200 0.19 51 0.031 1.86 Pampacancha Mineral Resources Category M (tonnes) Cu (%) Mo (g/t) Au (g/t

  35. Slide 35: Manitoba Mineral Reserves

    Manitoba Mineral Reserves As at January 1, 2015 Category Tonnes Cu (%) Zn (%) Au (g/t) Ag (g/t) 7771 Proven 3,729,000 2.10 4.65 1.86 27.39 Probable 3,943,000 1. 50 4.23 1.80 24.09 Lalor – Base Metal Proven 3,404,000 0.52 8.00 1.27 17.93 Probable 8,452,000 0.71 6.72 2.12 26.62 Lalor – Gold Zone Prove

  36. Slide 36: Manitoba Mineral Resources

    Manitoba Mineral Resources As at September 30, 2014 Category Tonnes Cu (%) Zn (%) Au (g/t) Ag (g/t) 7771 Indicated 733,000 0.99 3.52 1.81 26.13 Inferred 717,000 1.03 4.79 1.79 32.93 Lalor – Base Metal2 Inferred 5,332,000 1.56 5.21 2.75 25.32 Lalor – Gold Zone Inferred 3,890,000 0.38 0.24 5.50 31.40

  37. Slide 37: Copper Equivalent Reserves and Resources

    Copper Equivalent Reserves and Resources1 All Metals Project Category Cu Equivalent (000 tonnes) Year-over-Year Change Due to 2015 2014 Change Price Deck Constancia2 Proven & Probable 2,552 2,655 (103) (103) Measured & Indicated 1,004 1,045 (41) (41) Inferred 484 503 (19) (19) Lalor Proven & Probabl

  38. Slide 38: Precious Metal Equivalent Reserves and Resources

    Precious Metal Equivalent Reserves and Resources1 Project Category Au Equivalent (000 ounces) Year-over-Year Change Due to 2015 2014 Change Price Deck Constancia2 Proven & Probable 2,138 2,341 (203) (203) Measured & Indicated 889 972 (83) (83) Inferred 401 441 (40) (40) Lalor Proven & Probable 1,330

  39. Slide 39: Additional Information

    Additional Information  The reserve and resource estimates included in this presentation were prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) and the Canadian Institute of Mining, Metallurgy and Petroleum Standards on Mineral Resou

  40. Slide 40: Additional Information

    Additional Information Peru  For additional details relating to the estimates of mineral reserves and resources at the Constancia project, including data verification and quality assurance/quality control processes refer to “The Constancia Project, National Instrument 43-101 Technical Report” as fi

  41. Slide 41: Rosemont Historical Reserves and Resources

    Rosemont Historical Reserves and Resources1 Historical Mineral Reserves as at July 24, 2012 Category M (tonnes) Cu (%) Mo (%) Ag (g/t) Proven 279,481 0.46 0.015 4.11 Probable 325,798 0.42 0.014 4.11 Historical Mineral Resources as at July 17, 2012 Category M (tonnes) Cu (%) Mo (%) Ag (g/t) Inferred

  42. Slide 42: Rosemont Additional Information

    Rosemont Additional Information The key assumptions, parameters and methods used by Augusta to prepare the historical estimate were the following:  The Rosemont mineral reserves are effective as of July 24, 2012 and reported on a Net Smelter Return (NSR) cut-off of US$4.90 per ton. NSR values are b

  43. Slide 43: For more information contact

    For more information contact: Jacqueline Allison Director, Investor Relations Tel: 416.814.4387 Email: jacqueline.allison@hudbayminerals.com HBM INVESTOR PRESENTATION