Slide 1: Generating the Power of Tomorrow
CSE: GEN OTCQB: GENRF FRA: W85 Generating the Power of Investor Presentation Michael Collins P.Geo. CEO Tomorrow +1(778) 819-7881 July 2026 All Rights Reserved | Private and Confidential 1
Slide 2: Forward Looking Statement
CSE:GEN Forward Looking Statement Certain statements in this Presentation relating to the Company's exploration activities, project expenditures and business plans are approximate and are "forward-looking statements" within the meaning of securities legislation. The Company does not intend, and does
Slide 3: Management
CSE:GEN MANAGEMENT Michael Collins P.Geo. Christoph Bruening Dallas Miller Roger Leschuk CEO & Director Director Director VP Corporate Development Mr. Collins has almost 30 years Mr. Bruening is the founder and Dallas has been working within the Roger has been directly involved experience working mi
Slide 4: The Case for Uranium
CSE:GEN THE CASE FOR URANIUM o Existing supply deficit o AI power demand directly driving nuclear power demand Uranium USD/lbs o ~$100b construction support for large reactors by US Government o SMR will be easier to build o SMR requires more uranium per kW produced o Uranium - Exceptional value cre
Slide 5: Number of Nuclear Reactors Under Construction Worldwide as of June 2025
CSE:GEN THE # OF NUCLEAR REACTORS UNDER CONSTRUCTION WORLDWIDE AS OF JUNE 2025, BY COUNTRY o There are ~440 plants in operation today. o ~115 power reactors are in planning o ~300 more nuclear reactors are proposed. o AI is a key driver of increased demand o The US government has pledged ~$100b in f
Slide 6: Potential of the Thelon Basin Area, Nunavut
CSE:GEN POTENTIAL OF THE THELON BASIN AREA, NUNAVUT A Compelling Opportunity 1. Larger than the Athabasca Basin 2. Extensive uranium showings and historic resources** 3. Similar Basin ages 4. Thelon is earlier in the exploration process, better potential YATH Project Athabasca Basin* Thelon, Yathkye
Slide 7: Thelon & Angilak Basin Overview
CSE:GEN THELON & ANGILAK BASIN OVERVIEW Geiger Energy Aberdeen Project, 6,000 to 8,000 metres • 20 drill holes • Focus Tatiggaq expansion and Loki discovery ORANO Kiggavik Deposit, Historic Geiger Orano resource: 132.7M lbs, 0.54% avg grade Geiger (Forum) U3O8 ATHA Angilak Project, Atha has $63in th
Slide 8: GEN: Surrounded by Atha Energy's Angilak Project
CSE:GEN GEN: SURROUNDED BY ATHA ENERGY’S ANGILAK PROJECT Angilak Project Exploration by Atha Energy • 2024 - 10,051m diamond drilling + regional exploration were completed on the Angilak Project • 2025 - 10,000m drilling resulting in 5 LAC 50 NW new discoveries Discovery 2026 • 2026 - $63 million in
Slide 9: Potential at the Yath Project
CSE:GEN POTENIAL AT THE YATH PROJECT 1. The 173.6 km2 property is surrounded by Atha Energy’s Angilak Project which hosted 2 new discoveries* in 2025 2. Previous surface sampling includes grades of up to 9.81%, 3.95%, and 2.14% U3O8 in surface boulders and in field surveys conducted between 2012-201
Slide 10: Seventeen Targets in 2024
CSE:GEN SEVENTEEN TARGETS IN 2024 1. VRG Trend – a 5-kilometre mineralized corridor is along a reactivated basement fault, hosting a pervasive alteration, sulfides, and radioactive structures traceable for over 3 kilometres. 2. Embryo Creek – has historical samples grading up to 9.81% U₃O₈, with ass
Slide 11: GEN: Looking South at Atha Energy's Angilak Project
CSE:GEN GEN: LOOKING SOUTH AT ATHA ENERGY’S ANGILAK PROJECT* Angilak Project 2026 o Clear structural trends o Repeated N-NW structures at Lac 50 and north and south of Lac 50 o NE structures at RIB *From Atha Energy Press release May 5, 2026. *Mineralization hosted on an adjacent property is not nec
Slide 12: GEN: Atha Angilak Discovery Integrated into the Yath Project Map
CSE:GEN GEN: ATHA ANGILAK DISCOVERY INTEGRATED INTO THE YATH PROJECT MAP PROJECT MMT Data Pending GEN’s Yath project is contiguous with Conductors and Atha Energy, and on trend with the Lac Gravity Highs 50 Deposit. YATH Project Lac 50 NW Discovery o Conductors unveil Example mineralized structures
Slide 13: GEN: New Yath Priority Targets
CSE:GEN GEN: NEW YATH PRIORITY TARGETS Amy’s OC-LAC 50NW MP25S- Boulder IM-6 – SC-13 GEN’s Yath project is contiguous with VRG Trend BOG - Embryo Lake Atha Energy, and on trend with the Lac Yath Project 2026 50 Deposit. 5 New Priorities YATH Project Lac 50 NW Discovery o MP–25S – LAC50NW o MP 25N –
Slide 14: GEN: Yath Project Summary
CSE:GEN GEN: YATH PROJECT SUMMARY 1. High grade at surface with historic samples *up to 9.81% U₃O₈ at the Embryo target 2. Uranium in early drilling, 1.0 m at 0.224% U₃O₈ from 25.5 m in BOG-8-80 at the BOG target 3. Pervasive classic unconformity style clay alteration drilling on the VGR trend A 2 k
Slide 15: Generation Uranium Capital Structure
CSE:GEN GENERATION URANIUM CAPITAL STRUCTURE CSE: GEN SHARES I&O 70,833,445 1yr trading range $0.04 – 0.115 MARKET CAP 5 M ($CAD) Warrants 30.2m ~2y avg. $0.16 Options 4.2m @ $0.08 Generation Uranium is on the ground at the Yath Project right now 15
Slide 16: CSE:GEN
CSE:GEN +1(778) 819-7881 mcollins@generationuranium.com www.generationuranium.com 16