White Energy Company Limited · ASX:WEC

White Energy — Shareholder Meeting (November 2014)

33 slides from White Energy's shareholder meeting presentation, Nov 28, 2014

  1. Slide 1: ASX Release: 2014 Annual General Meeting documents

    ASX Release For personal use only ASX Release The Manager Company Announcements Office Australian Stock Exchange WHITE ENERGY COMPANY LIMITED 2014 ANNUAL GENERAL MEETING 28 November 2014 – White Energy Company Limited (ASX: WEC, OTCQX: WECFY) (“White Energy” or “the Company”) is pleased to provide a

  2. Slide 2: Chairman's Address

    ASX Release For personal use only ASX Release CHAIRMAN’S ADDRESS Good morning shareholders, I would like to take this opportunity to thank you for your attendance at White Energy’s 2014 Annual General Meeting. In particular, I would like to thank you for your continuing support through a period of c

  3. Slide 3: Chairman's Address (continued)

    ASX Release For personal use only ASX Release White Energy’s Cessnock Demonstration Plant continues to operate as a key testing and training facility for the Company. The Demonstration Plant and a smaller Pilot Plant located on site are critical to the ongoing development of the BCB Technology and h

  4. Slide 4: Managing Director's Address

    ASX Release For personal use only ASX Release MANAGING DIRECTOR’S ADDRESS Thank you Mr Chairman. Ladies and Gentlemen, Thank you for your attendance at today’s Annual General Meeting. The past year has been a period of rebuilding for White Energy as we still recover from the damage done by the prema

  5. Slide 5: Managing Director's Address (continued)

    ASX Release For personal use only ASX Release The U.S. domestic coal market has considerably deteriorated since MCC was acquired with no indication of improvement in the short-term. The thermal coal market in particular remains impacted by a lower demand for energy and low natural gas prices which h

  6. Slide 6: Managing Director's Address (continued)

    ASX Release For personal use only ASX Release During the year a DFS was also completed in respect of a 500,000 tonne per annum BCB plant to be constructed adjacent to the wash plant of another coal producer’s mine. As part of this DFS, the South African power utility Eskom conducted comprehensive mi

  7. Slide 7: Annual General Meeting - 2014

    white energy company limited For personal use only ABN 62 071 527 083 Annual General Meeting - 2014 28 November 2014 – 10am AEDT Portside Centre - Level 5 207 Kent Street Sydney NSW 2000

  8. Slide 8: Disclaimer

    white energy company limited For personal use only ABN 62 071 527 083 Disclaimer Forward looking statements This Presentation contains forward-looking statements that are subject to risks and uncertainties. These forward-looking statements include information about possible or assumed future results

  9. Slide 9: Chairman's Address

    white energy company limited For personal use only ABN 62 071 527 083 Chairman’s Address Mr Travers Duncan

  10. Slide 10: MCC wash plant site under construction – October 2014

    The MCC wash plant site which is currently under construction – October 2014 For personal use only

  11. Slide 11: MCC wash plant site under construction – November 2014

    The MCC wash plant site which is currently under construction – November 2014 For personal use only

  12. Slide 12: MCC wash plant site under construction – November 2014

    TheMCC The MCCwash washplant plantsite sitewhich whichisiscurrently currentlyunder construction– –November underconstruction November2014 2014 For personal use only

  13. Slide 13: Board and management touring the Cessnock Demonstration Plant

    White Energy Board members and management touring the Cessnock Demonstration Plant For personal use only

  14. Slide 14: Coal briquettes produced from MCC coal fines

    Coal briquettes produced from MCC coal fines at the Cessnock Demonstration Plant For personal use only

  15. Slide 15: Investigating a potential coal property in Indonesia

    White Energy representatives investigating a potential coal property in Indonesia For personal use only

  16. Slide 16: Investigating a potential coal property in Indonesia

    White Energy representatives investigating a potential coal property in Indonesia For personal use only

  17. Slide 17: Managing Director's Address

    white energy company limited For personal use only ABN 62 071 527 083 Managing Director’s Address Mr Brian Flannery

  18. Slide 18: Open-cut mining at MCC's Flag Ridge mine

    Open-cut mining operations at MCC’s Flag Ridge mine using highwall mining equipment For personal use only

  19. Slide 19: MCC wash plant site under construction – August 2014

    The MCC wash plant site which is currently under construction – August 2014 For personal use only

  20. Slide 20: MCC wash plant site under construction – October 2014

    The MCC wash plant site which is currently under construction – October 2014 For personal use only

  21. Slide 21: MCC wash plant site under construction – November 2014

    The MCC wash plant site which is currently under construction – November 2014 For personal use only

  22. Slide 22: Cladding installed at the MCC wash plant

    Cladding installed at the MCC wash plant – November 2014 For personal use only

  23. Slide 23: Open-cut mining at MCC's Hatfield Gap mine

    Open-cut mining operations at MCC’s Hatfield Gap mine For personal use only

  24. Slide 24: Newly sloped areas at Flag Ridge reclamation

    Newly sloped areas at MCC’s Flag Ridge mine site as part of the reclamation process For personal use only

  25. Slide 25: Seeding at Jellico Creek reclamation

    Seeding at MCC’s Jellico Creek mine site as part of the reclamation process For personal use only

  26. Slide 26: Vegetation growth after one year at Flag Ridge

    Vegetation growth after one year at MCC’s Flag Ridge mine site as part of the reclamation process For personal use only

  27. Slide 27: Environmental control dam at Flat Creek mine site

    The construction of the first environmental control dam at MCC’s new Flat Creek mine site For personal use only

  28. Slide 28: Flat Creek mine site awaiting mining

    An area of MCC’s Flat Creek mine site which awaits mining For personal use only

  29. Slide 29: Access road into Flat Creek mine site

    The access road into MCC’s Flat Creek mine site which was recently constructed For personal use only

  30. Slide 30: Fine Coal Beneficiation plant under construction, Woestalleen

    Fine Coal Beneficiation plant under construction at the Woestalleen, RSA site For personal use only

  31. Slide 31: Fine Coal Beneficiation plant under construction, Woestalleen

    Fine Coal Beneficiation plant under construction at the Woestalleen, RSA site For personal use only

  32. Slide 32: Anglo American coal fines sampling for feasibility study

    Anglo American representatives conducting coal fines sampling as part of the Detailed Feasibility Study with RESA For personal use only

  33. Slide 33: Anglo American coal fines sampling for feasibility study

    Anglo American representatives conducting coal fines sampling as part of the Detailed Feasibility Study with RESA For personal use only