  1. Slide 1: New Frontiers, New Growth

    Photo positional only. To be replaced with drilling photo. NEW FRONTIERS NEW GROWTH Our new, drill-ready zinc-copper-gold project is a transformational transaction 29 August 2019

  2. Slide 2: Advancing Projects Around the World

    COMPANY PROFILE Skaergaard Greenland 100% owned ADVANCING PROJECTS Gold, Platinum Group Metals AROUND THE WORLD Blue Moon • We leverage our core expertise and United States Earning 70% Zinc, Copper, experience in advancing projects Gold, Silver Munni Munni through drilling, feasibility and Western A

  3. Slide 3: New Flagship Project

    NEW Our new Blue Moon Project is a , drill-ready, FLAGSHIP high-grade zinc-copper- PROJECT gold deposit with significant resource expansion and development potential NEW FRONTIERS. FRONTIERS ASX:PGM NEW GROWTH. GROWTH SLIDE / 3

  4. Slide 4: Joint Venture Terms

    BLUE MOON PROJECT JOINT VENTURE TERMS* • Platina to acquire a 70% interest in the Blue Moon Project by spending: - $CAD3.25 million to earn 50% over 18 months & - $CAD3.75 million to earn an additional 20% over an additional 18 months • Platina operator of the Joint Venture • Platina to acquire a 5%

  5. Slide 5: Investment Proposition

    BLUE MOON PROJECT INVESTMENT PROPOSITION Significant valuation upside Drill ready 01 Brownfield project with large sunk cost and potential 04 Planned 10,000m program ready to proceed which will share price re-rating as it moves along value curve generate significant news flow over the next 6 months

  6. Slide 6: Investment Proposition: Significant Value Upside

    INVESTMENT PROPOSITION 01 SIGNIFICANT VALUE UPSIDE Explorer 183 Developer Producer NEW • Significant value in the ASX Zn/Pb peer group* 167 CENTURY RESOURCES Market Capitalisation ($A million) • Platina valuation supported by existing assets ADRIATIC 131 METALS • Global zinc M&A driving high valuati

  7. Slide 7: Large, Well-Defined Resource

    INVESTMENT PROPOSITION 02 LARGE, WELL-DEFINED RESOURCE • Deposit well understood – 43,000m of drilling in ~113 holes • High-grade, polymetallic, zinc-copper-gold- silver-lead, Volcanic Massive Sulphide deposit hosted in rhyolite • Four lenses of mineralisation have been Main Vein identified to date

  8. Slide 8: Large, Well-Defined Mineral Resource

    Cautionary Note – National Instrument 43-101 is a national instrument for the INVESTMENT PROPOSITION Standards of Disclosure for Mineral Projects within Canada. The Mineral Resources stated are foreign estimates and are not reported in accordance with JORC Code. A competent person has 02 LARGE, WELL

  9. Slide 9: Large Resource: Potential for Expansion

    INVESTMENT PROPOSITION 02 LARGE RESOURCE Potential for significant expansion of the resource 800m gap between mineralisation largely untested Potential Expansion Zone – Mineralised Ore Shoots plunging South ASX:PGM SLIDE / 9

  10. Slide 10: Exploration Upside Beyond Resource Limits

    INVESTMENT PROPOSITION 02 LARGE, WELL-DEFINED MINERAL RESOURCE Exploration upside beyond resource limits • Extent of the alteration indicates a large mineralising system may extend south of the current resource • Geophysical anomalies along strike • Untested trend of coincident soil and geophysical

  11. Slide 11: High Grade Deposit

    INVESTMENT PROPOSITION 03 HIGH GRADE DEPOSIT Grade is King • BMZ-78* was drilled in 2018 into a previously untested area and represents the highest grades ever encountered at the property • Attractive intersections of gold up to Hole BMZ78 5g/t 36.5m @ 9.45% Zn, 0.58% Cu, 1.1 g/t Au & 42.9 g/t Ag fo

  12. Slide 12: High Grade Deposit: Simple Metallurgy

    INVESTMENT PROPOSITION Potential process plant location 03 HIGH GRADE DEPOSIT Simple metallurgy • 1988 Lakefield Research* results indicated recoveries of up to: • 95% for zinc and lead • 93% for copper • 65% for silver • 70% for gold • Conventional sulphide flowsheet to produce clean zinc and coppe

  13. Slide 13: Drill-Ready

    INVESTMENT PROPOSITION 04 DRILL-READY • Drill permit approved, 10,000m drilling program planned • Infill drilling for resource definition (conversion of Inferred to Indicated Mineral Resource) • Exploration drilling for resource expansion • Initial focus on new high-grade zone within deposit – hole

  14. Slide 14: Right Commodities, Right Time

    INVESTMENT PROPOSITION 05 RIGHT COMMODITIES, ZINC PRICE $USD/tonne RIGHT TIME • Blue Moon provides exposure to zinc, copper, gold and silver • Zinc is the fourth-most-consumed metal after iron, aluminum and copper • Zinc’s primary use is galvanisation to protect steel from corrosion - ~ 50% of deman

  15. Slide 15: Right Commodities, Right Time: Zinc Supply

    INVESTMENT PROPOSITION 05 RIGHT COMMODITIES, Zinc supply (assumed growth) RIGHT TIME ‘000s TONNES High demand • Zinc fundamentals are strong: Base demand Low demand • Global zinc stocks have been falling due to supply deficits over the last five years • LME stocks at critically low levels • Perceive

  16. Slide 16: Favourable Location

    Reno INVESTMENT PROPOSITION 06 FAVOURABLE LOCATION • Located 193 km east of San Francisco in Mariposa County • 1 km from low-cost hydro-electric power • 150 km to Oakland export port via Oakland BLUE MOON sealed roads ZINC PROJECT • Labour and contractors available locally and Reno San Francisco • S

  17. Slide 17: Favourable Location: Zinc Smelters

    INVESTMENT PROPOSITION 06 FAVOURABLE LOCATION Three zinc smelters located BLUE MOON within the USA and Canada, ZINC PROJECT plus Asia/Australia options BLUE MOON ZINC PROJECT Zinc smelter ASX:PGM SLIDE / 17

  18. Slide 18: Pathway to Production

    BLUE MOON PROJECT PATHWAY TO PRODUCTION 2019 Project Objectives 01 Infill and resource expansion drilling program to expand Mineral Resource 02 Metallurgical testing to confirm process flow sheet Commence a Pre-Feasibility Study 03 Update of baseline environmental studies 04 ASX:PGM SLIDE / 18

  19. Slide 19: Supporting Information

    ~ _ SUPPORTING be 227 INFORMATION a

  20. Slide 20: Tenure

    BLUE MOON PROJECT Patented Mineral Claims Federal Lode Claims TENURE Spanish Land Grants 100% ownership of a mineral rights package covering 445 acres of tenure comprising: 1. Two deeded, patented mineral claims • Provides ownership of the surface land and mineral rights • Exists into perpetuity 2.

  21. Slide 21: Development Concept Has Low Environmental Impacts

    BLUE MOON PROJECT DEVELOPMENT CONCEPT HAS LOW ENVIRONMENTAL IMPACTS • Small surface footprint, underground mining operation • Process plant to produce zinc and copper concentrates • Minimal flora or fauna impacts – most of the land is cleared • Water recycled in the process plant and fully contained

  22. Slide 22: Permitting Process

    BLUE MOON PROJECT PERMITTING PROCESS • Drilling permits secured • Project was historically permitted for direct shipping ore operations • Existing permit and reclamation plan approved in 1989 for a shaft and certain underground development • Consultant who permitted Golden Queen’s project in Califor

  23. Slide 23: California Active in Resource Development

    BLUE MOON PROJECT CALIFORNIA ACTIVE IN RESOURCE DEVELOPMENT • California generated USD 4.6 billion of non-fuel • New Projects being advanced towards mineral production in 2018* development: • Major projects in operation: – Castle Mountain gold project (Equinox Gold Corp.) – Mesquite mine (Equinox Go

  24. Slide 24: Appendices

    APPENDICES

  25. Slide 25: Blue Moon Cut Off Grade Sensitivity

    APPENDIX 1 BLUE MOON CUT OFF GRADE SENSITIVITY* Significant potential to optimise the Mineral Resource Cutoff Tons > Grade > Cutoff Contained Metal (Millions) ZnEq Cutoff Zn Cu Ag Au Pb ZnEq lbs lbs lbs ozs ozs % (tons) % % oz/t oz/t % % Zn Cu Pb Ag Au 1 18,350,000 2.80 0.29 0.74 0.02 0.17 4.64 1,02

  26. Slide 26: Capital Structure

    PLATINA RESOURCES CAPITAL STRUCTURE Share Structure Capitalisation Trading Exchange ASX:PGM Price as at 26 August 2019 4.3c Shares 264.1 million Market Cap $AUD11.3m 52 week low/high 3.6c – 13.0c Cash as at 30 June 2019 $AUD1.3m Top 20 shareholders 54% Debt as at 30 June 2019 Nil Note: Enterprise Va

  27. Slide 27: Peer Comparison Company Description

    APPENDIX 2 PEER COMPARISON COMPANY DESCRIPTION Company & Website ASX Status Description Code New Century Zinc NCZ Producer An Australian based zinc and lead producer operating the Century Mine tailings project in Queensland, www.newcenturyzinc.com.au Australia. Heron Resources HRR Producer Operates

  28. Slide 28: Peer Comparison Company Description

    APPENDIX 2 PEER COMPARISON COMPANY DESCRIPTION Company & Website ASX Status Description Code Myammar Metals MYL Explorer Controls a 51% majority participating interest in the world class Bawdwin deposit located in Shan State, www.myammarmetals.com.au Myanmar. Pre-Feasibility Study completed. Galena

  29. Slide 29: Disclaimer

    COMPETENT PERSON STATEMENT DISCLAIMER The information in this report that relates to Exploration Results and Mineral Resources CAUTIONARY AND FORWARD-LOOKING STATEMENTS is based on information compiled by Dr Gustavo Delendatti, a member of the Australian Institute of Geoscientists. Dr Delendatti is

  30. Slide 30: Contact

    CONTACT Corey Nolan Managing Director Telephone: +61 7 5580 9094 Email: admin@platinaresources.com.au platinaresources.com.au