Pennon Group Plc · LSE:PNN

Pennon — 11th HSBC SRI Conference 2016

58 slides from Pennon's conference presentation, Feb 2, 2016

  1. Slide 1: 11th HSBC SRI Conference

    11TH HSBC SRI CONFERENCE FRANKFURT, 1-2 FEBRUARY 2016 ENVIRONMENTAL | SUSTAINABLE | PROFITABLE

  2. Slide 2: Disclaimer

    DISCLAIMER For the purposes of the following disclaimers, references to this “document” shall mean Benefit Schemes. this presentation pack and shall be deemed to include references to the related speeches made by or to be made by the presenters, any questions and answers in Forward looking statement

  3. Slide 3: Pennon Overview

    PENNON OVERVIEW UNIQUE COMBINATION OF ENVIRONMENTAL UTILITY INFRASTRUCTURE ASSETS VIRIDOR One of the leading UK renewable energy, recycling and resource management companies providing services to more than 150 local authorities and major corporate clients as well as over 32,000 customers across the

  4. Slide 4: Pennon Overview: Strategy Focused on Delivering Shareholder Value

    PENNON OVERVIEW STRATEGY FOCUSED ON DELIVERING SHAREHOLDER VALUE TALENTED, COMMITTED LEADERSHIP TEAM • Strong central financial control, sound administration and good governance STRATEGIC PRIORITIES, EVOLUTION UNDERWAY • Moving towards a more homogeneous risk profile across the Group, whilst retaini

  5. Slide 5: Key Business Statistics: Water Business

    PENNON OVERVIEW KEY BUSINESS STATISTICS WATER BUSINESS SOUTH WEST BOURNEMOUTH Exmoor WATER WATER Bathing Water Meldon National Park Shellfish Water Fernworthy Household Customers 722,000 189,000 Wimbleball Reservoir Burrator Avon Non-Household Customers 73,000 16,000 Roadford Reservoir Dartmoor Natio

  6. Slide 6: Key Business Statistics: Viridor

    PENNON OVERVIEW KEY BUSINESS STATISTICS RENEWABLE ENERGY, RECYCLING, RESOURCE MANAGEMENT Operational ERF 2015 – 2018 Consented facility VIRIDOR Operating Facilities 318 Energy Recovery Facilities (ERFs) in operation 8 Energy Recovery Facilities (ERFs) under construction 3 Materials recycling facilit

  7. Slide 7: Viridor: Environmentally, Economically and Socially Responsible

    VIRIDOR ENVIRONMENTALLY, ECONOMICALLY AND SOCIALLY RESPONSIBLE ENVIRONMENTAL IMPACT • Strategic purpose to give resources new life through transforming waste into essential renewable energy and quality recycled materials • Responsible management of closed landfill sites in accordance with the Wildli

  8. Slide 8: South West Water: Pure Water, Pure Service, Pure Environment

    SOUTH WEST WATER PURE WATER, PURE SERVICE, PURE ENVIRONMENT PROVIDING A RELIABLE, CLEAN AND SAFE SUPPLY OF DRINKING WATER • Consistently high drinking water quality, low number of customer contacts for taste, odour and discolouration • 19th consecutive year without water restrictions • Continued foc

  9. Slide 9: Case Study: Innovation and Resilience

    SOUTH WEST WATER CASE STUDY: INNOVATION AND RESILIENCE RESILIENCE IS A HIGH PRIORITY FOR STAKEHOLDERS Proposed Flood Defence Scheme Countess Wear Waste Water Treatment Works, Exeter DELIVERING BEST VALUE FROM EXPENDITURE AND SUPPORTING OUR LONG TERM VISION Canal Banks – raised embankments with sheet

  10. Slide 10: Accounting for Sustainability

    PENNON GROUP ACCOUNTING FOR SUSTAINABILITY 10

  11. Slide 11: Financial Overview

    PENNON GROUP PLC FINANCIAL OVER

  12. Slide 12: Financial Highlights H1 2015/16 vs H1 2014/15

    FINANCIAL HIGHLIGHTS H1 2015/16 VS H1 2014/15 RESULTS BENEFITING FROM GROWTH REVENUES EARNINGS PER SHARE(3) KEY DRIVERS OF H1 PERFORMANCE • Viridor’s operational ramp-up of ERFs, optimising the portfolio: c.80% long-term contracted volumes (0.5%) +5.0% • South West Water’s revenue reset for K6 (2015

  13. Slide 13: Group Financing

    GROUP FINANCING EFFICIENT LONG-TERM SUSTAINABLE FINANCING GROUP NET BORROWINGS GROUP NET GEARING(1) £2,345m 62.6% (31 March 2015 £2,197m) (31 March 2015 61.9%) AVERAGE DEBT MATURITY SWW NET DEBT/ RCV 23 Years 62.4% (31 March 2015 62.1%) • Diversified funding mix with significant finance leasing • £3

  14. Slide 14: Group Financing: Interest, Tax and Earnings

    GROUP FINANCING INTEREST, TAX AND EARNINGS IN LINE WITH MANAGEMENT EXPECTATIONS GROUP AVERAGE CURRENT EARNINGS INTEREST RATE TAX RATE(1) PER SHARE(3) 3.4% 17.3% 23.2p (H1 2014/15 3.7%) (H1 2014/15 19.8%) (H1 2014/15 22.1p) SWW AVERAGE CURRENT DIVIDEND INTEREST RATE TAX(1) PER SHARE(4) 3.2% £18.5m 10

  15. Slide 15: Financial Outlook

    FINANCIAL OUTLOOK ON TRACK TO MEET MANAGEMENT EXPECTATIONS FOR FY 2015/16 • Results likely to be weighted towards H1 • Strong operating cash flows, liquidity and balance sheet INCREASINGLY WELL-POSITIONED FOR FUTURE • Viridor – on track to contribute c.£100m to EBITDA from ERFs in 2016/17 • Strong,

  16. Slide 16: South West Water

    PENNON GROUP PLC SOUTH WEST WA

  17. Slide 17: South West Water: Delivering and Outperforming K6 Business Plan

    SOUTH WEST WATER DELIVERING AND OUTPERFORMING K6 (2015-20) BUSINESS PLAN STRONG H1 RESULTS DELIVERING PREPARED FOR NON- – FAST START TO K6 OUTPERFORMANCE HOUSEHOLD RETAIL MARKET OPENING SECTOR-LEADING EXECUTING GROWTH POSITIONING FOR FINANCE COSTS STRATEGY THROUGH WATER 2020 AND BOURNEMOUTH FURTHER

  18. Slide 18: South West Water Financial Highlights

    SOUTH WEST WATER FINANCIAL HIGHLIGHTS H1 2015/16 VS H1 2014/15 REVENUES RoRE WEIGHTED TO H1 2015/16 • Revenues reset for new regulatory period +4.1% 11.5%(2) • Mitigated by higher than forecast customer demand, ongoing efficiencies and Totex outperformance SWW £259.1m BW £20.2m SWW & BW DELIVER 0.9%

  19. Slide 19: Delivering Operational Outperformance

    SOUTH WEST WATER DELIVERING OPERATIONAL OUTPERFORMANCE HIGHEST POTENTIAL RETURNS IN THE INDUSTRY H1 2015/16 OPERATIONAL RoRE(2) £29M(1) OF TOTEX SAVINGS DELIVERED IN H1 TOTEX +2.2% • Totex largest element of potential operational -1.5% +2.3% outperformance £12.5m(3) SIM 0.0% FRONT-END LOADING OF EFF

  20. Slide 20: Delivering Net ODI Rewards

    SOUTH WEST WATER DELIVERING NET ODI REWARDS CUSTOMER SERVICE IMPROVEMENTS • Continuous SIM improvements decreasing gap between SWW & industry average • Reduced odour complaints • 19th consecutive year without water restrictions SWW TARGETING ENVIRONMENTAL PERFORMANCE • 97% of beaches achieved the ne

  21. Slide 21: Bournemouth Water Merger

    BOURNEMOUTH WATER MERGER EXECUTING GROWTH STRATEGY CMA UNCONDITIONAL CLEARANCE RECEIVED INTEGRATION OF THE TWO BUSINESSES UNDERWAY • Merging wholesale and retail operations • Single centralised support function serving both businesses • Common systems and processes – best practise from both business

  22. Slide 22: Prepared for Future Regulatory Reform

    SOUTH WEST WATER PREPARED FOR FUTURE REGULATORY REFORM LEGALLY SEPARATE NHH RETAIL BUSINESS • Defend incumbent customers and grow out of area • Economies of scale with integration of Bournemouth Water • Capitalise on Viridor footprint/order book/relationships/culture • Customer service and contact c

  23. Slide 23: Positioning for Water 2020 and Further Reform

    SOUTH WEST WATER POSITIONING FOR WATER 2020 AND FURTHER REFORM STRATEGY AT PR19 • Heavily involved in Water 2020 discussions with Ofwat • Ofwat working collaboratively with industry on potential reforms • SWW has shared with Ofwat detailed work already undertaken on key areas: - Upstream markets (pa

  24. Slide 24: Viridor

    VIRIDOR

  25. Slide 25: Viridor: A Leader in Renewable Energy, Recycling and Resource Management

    VIRIDOR A LEADER IN RENEWABLE ENERGY, RECYCLING AND RESOURCE MANAGEMENT STRONG H1 RESULTS OPTIMISING THE LANDFILL SITES BEING ENERGY PORTFOLIO MANAGED FOR CASH AND ALTERNATIVE USE LONG-TERM DRIVING TOWARDS A STRATEGY FOCUSED CONTRACTED MORE PROFITABLE ON SHAREHOLDER POSITION INCREASED, RECYCLING DIV

  26. Slide 26: Viridor Financial Highlights

    VIRIDOR FINANCIAL HIGHLIGHTS H1 2015/16 VS H1 2014/15 REVENUES(1)(2) REVENUE PROFILE AS EXPECTED PROFIT BEFORE TAX(3) • Lower construction revenue from service concession arrangements as facilities come on-stream (3.4%) +174.5% • Lower landfill tax receipts as volumes continue to to £410.1m to £12.9

  27. Slide 27: Long-Term Revenue Streams for ERFs Secured

    VIRIDOR LONG-TERM REVENUE STREAMS FOR ERFs SECURED ALL WASTE INPUTS SECURED AT PLANT OPENING • c.80% of resource inputs secured across the total ERF portfolio (operational and under construction) under long- BEN CHANGE term contracts PHOTO • A further 15% from medium-term contracts (up to 5 years) •

  28. Slide 28: ERF Portfolio De-risked with Long-Term Contracted Revenues

    VIRIDOR ERF PORTFOLIO DE-RISKED WITH LONG-TERM CONTRACTED REVENUES VIRIDOR CAPACITY (OPERATIONAL & IN CONSTRUCTION) Balance of short and medium-term contracts (Municipal and Commercial & Industrial) De-risking - long-term contracts secured Long-term contracts at the start of the ERF programme 2012 2

  29. Slide 29: Minimising Risk – Merchant Becomes Long Term Contracted

    VIRIDOR MINIMISING RISK – MERCHANT BECOMES LONG TERM CONTRACTED Planning & Permitting Plant Plant Contracted % Achieved Commissioning Operational Merchant % 100% 80% Fuel Load TRIDENT 60% PARK ERF 40% 20% 0% Project Gwyrdd Project Gwyrdd in Trident Contracting Project Gwyrdd Outline Bid Contract sig

  30. Slide 30: UK ERF Capacity Gap Continues to 2030 and Beyond

    VIRIDOR UK ERF CAPACITY GAP CONTINUES TO 2030 AND BEYOND UK COMBUSTIBLE RESIDUAL WASTE MARKET(MT) Other ERF Capacity Viridor ERF Capacity UK ERF Under-capacity 30 25 20 15 10 5 0 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Source: DEFRA, SEPA, NRW and Viridor

  31. Slide 31: Delivering the ERF Programme, Reducing Construction Risk

    VIRIDOR DELIVERING THE ERF PROGRAMME, REDUCING CONSTRUCTION RISK OPERATIONAL RAMP-UP AT NEW PLANTS LAKESIDE RAMP-UP • Eight operational facilities Waste Inputs (tonnes) 500,000 • Managed operational ramp-up of the five new ERFs brought on-stream in 2014/15 and 400,000 Peterborough ERF in 2016, the s

  32. Slide 32: Driving Towards a More Profitable Recycling Division

    VIRIDOR DRIVING TOWARDS A MORE PROFITABLE RECYCLING DIVISION ITOO YIELDING FINANCIAL BENEFITS VOLUMES • Recycling EBITDA H1 2015/16 has improved on H2 2014/15 • Ongoing Input, Throughput and Output Optimisation (ITOO) programme, 0.9mt addressing effectiveness and efficiency. Yielding financial benef

  33. Slide 33: Landfill Sites Being Managed for Cash and Alternative Future Use

    VIRIDOR LANDFILL SITES BEING MANAGED FOR CASH AND ALTERNATIVE FUTURE USE LANDFILLS BEING CLOSED TO WASTE INPUTS • Landfill volumes gradually declining as expected with waste being diverted to energy recovery though decline slower than expected • Reducing from 18 sites to 3 strategic sites by 2020 as

  34. Slide 34: Appendix

    ae PENNON GROUP APPENDIX

  35. Slide 35: Financial Highlights H1 2015/16 vs H1 2014/15

    FINANCIAL HIGHLIGHTS H1 2015/16 VS H1 2014/15 RESULTS BENEFITING FROM GROWTH £M H1 2015/16 H1 2014/15 CHANGE FY 2014/15 Group Revenue 689.1 692.3 (0.5%) 1,357.2 Group EBITDA(1) 231.7 200.0 +15.9% 411.0 - Water Business EBITDA 173.6 172.2 +0.8% 331.3 - SWW EBITDA 165.0 172.2 (4.2%) 331.3 - Bournemout

  36. Slide 36: Cash Flow Statement

    CASH FLOW STATEMENT STRONG CASH INFLOW FROM OPERATIONS £M 101.0 19.5 5.9 (5.3) (9.5) 218.8 (36.9) (37.7) (90.0) 574.8 594.8 (145.8) (1) Cash Balance (1) Cash Inflow Equity Loan Net Movements Pension Tax Net Interest Dividends Acquisitions (2) Capital Cash Balance 1-Apr-15 from Placing & Repayments f

  37. Slide 37: Underlying Group EBITDA

    UNDERLYING GROUP EBITDA REFLECTING INCREASED CONTRIBUTION FROM ERFs £M 8.6 2.7 2.0 11.4 41.8 (1.9) (2.3) (2.6) (2.8) (4.2) 261.6 (18.3) 227.2 (2) (4) H1 2014/15 ERFs SWW K5 Price Bournemouth Share of JV SWW Net Cost Viridor Other SWW Other Plc/Other Recycling Landfill SWW Cost of H1 2015/16 Freeze W

  38. Slide 38: Underlying Group EBITDA

    UNDERLYING GROUP EBITDA REFLECTING INCREASED CONTRIBUTION FROM ERFs H1 2015/16 £M H1 2015/16 H1 2014/15 FY 2014/15 Contracts, Collections Recycling Viridor & Other £7.2m £20.1m ERFs 43.8 2.0 33.7 Landfill SWW Energy £165.0m Landfill Energy 20.5 24.7 51.2 £20.5m Recycling 7.2 10.0 11.5 Share of Contr

  39. Slide 39: Group Capital Investment

    GROUP CAPITAL INVESTMENT(1) INVESTING FOR GROWTH AND SECURING OPERATIONAL EXCELLENCE H1 2015/16 £M H1 2015/16 H1 2014/15 FY 2014/15 Viridor Landfill Viridor (Other) Energy Recycling £3m Contracts and £7m £6m ERFs 87 89 204 Collections £5m Recycling 3 15 22 Clean Water (BW) Landfill Energy 6 10 16 £4

  40. Slide 40: Diversified Funding Sources

    PENNON GROUP DIVERSIFIED FUNDING SOURCES £M (As at 30 Sep 2015) Finance Leasing 1,332 KEY ROLE OF Bank Bilaterals - Term Loans 443 FINANCE European Investment Bank Loans 284 LEASING Index-Linked Bonds 410 Fixed Rate Bond 133 Private Placements 548 Unsecured Loan Notes 1 Total Gross Debt 3,151 Less:

  41. Slide 41: Fair Value of Non Current Debt

    PENNON GROUP FAIR VALUE OF NON CURRENT DEBT AS AT 30 SEPTEMBER 2015 AS AT 31 MARCH 2015 £M BOOK FAIR DIFF BOOK FAIR DIFF VALUE VALUE VALUE VALUE Finance Leases 1,305 1,174 131 1,304 1,182 122 Bank and Other Loans 393 393 - 338 338 - Private Placements 548 588 (40) 548 607 (59) Fixed Rate Bond 133 18

  42. Slide 42: Net Interest Analysis

    PENNON GROUP NET INTEREST ANALYSIS(1) £M H1 2015/16 H1 2014/15 FY 2014/15 • Net interest payable unchanged, reflecting lower rates, offsetting Interest payable (44.7) (32.7) (66.0) higher net debt • Effective management of interest Capitalised interest payable (4.0) (13.9) (22.5) rates Other finance

  43. Slide 43: Taxation

    PENNON GROUP TAXATION £M H1 2015/16 H1 2014/15 CURRENT TAX CURRENT YEAR CHARGE 17.3% H1 (2014/15 – Current tax 19.8%) Current year 18.5 19.8 • Decrease driven by reduction in Prior year (14.7) (12.6) headline corporation tax rate and higher ERF capital allowances 3.8 7.2 Deferred tax Current year 6.

  44. Slide 44: Pensions

    PENNON GROUP PENSIONS £M SEPTEMBER 2015 MARCH 2015 • Bournemouth Water pension scheme has assets of around Pension schemes’ £83m resulting in a small surplus assets £750m £692m • Excluding the addition of Pension schemes’ Bournemouth Water, the liabilities underlying decrease in asset £818m £752m va

  45. Slide 45: South West Water Financial Performance

    SOUTH WEST WATER FINANCIAL PERFORMANCE £M H1 2015/16 H1 2014/15 CHANGE FY 2014/15 Revenue 279.3 268.3 +4.1% 522.2 South West Water 259.1 268.3 (3.4%) 522.2 Bournemouth Water 20.2 - - - EBITDA(1) 173.6 172.2 +0.8% 331.3 South West Water 165.0 172.2 (4.2%) 331.3 Bournemouth Water 8.6 - - - Operating P

  46. Slide 46: South West Water EBITDA

    SOUTH WEST WATER EBITDA £M 11.4 2.0 172.2 8.6 173.6 (2.3) 165.0 (18.3) SWW K5 Price Freeze Net Cost Savings Other Revenue Cost of Capital SWW Bournemouth Water Business H1 2014/15 Recovery and Efficiency (1) Impacts(2) Reset H1 2015/16 Water H1 2015/16 (1) Includes cost increases due to inflation (2

  47. Slide 47: Reconciliation of RoRE to Final Determination

    SOUTH WEST WATER RECONCILIATION OF RoRE TO FINAL DETERMINATION (FD) BASE ALLOWED RETURNS – 6.0% COMBINED TOTEX OUTPERFORMANCE – 2.2% RoRE • Actual operating costs before depreciation (£106m) + actual capital expenditure (£58m) = £164m • Totex allowance(1)(2) assumed for H1 2015/16 = £193m • £29m Tot

  48. Slide 48: Sector-Leading Finance Costs

    SOUTH WEST WATER SECTOR-LEADING FINANCE COSTS EFFICIENT AND EFFECTIVE FINANCING SWW EFFECTIVE INTEREST RATES • Lower underlying interest rates 4.2% • Optimum capital structure 4.0% 3.8% 3.2% EFFECTIVE INTEREST RATE H1 2015/16 K5 K6 3.6% DEBT PREDOMINANTLY FIXED FOR K6 3.4% • Swaps aligned to regulat

  49. Slide 49: Viridor: Focused on Creating Value for Shareholders

    VIRIDOR FOCUSED ON CREATING VALUE FOR SHAREHOLDERS UNRIVALLED EXPERTISE LEGACY RECYCLING & ENERGY DELIVERING THE RIGHT BUSINESS RESOURCES STRATEGY FOR EACH BUSINESS Landfill Recycling Collection Landfill ERF • Clear strategy to combat & Gas short-term challenges Contracts SHORT-TERM Headwinds in • O

  50. Slide 50: Platform Established for Energy Management

    VIRIDOR PLATFORM ESTABLISHED FOR ENERGY MANAGEMENT CHANGE IN SCALE OF ENERGY PORTFOLIO • Expected to export over 1TWh of power to the grid in 2016/17, enough to power a city the size of Plymouth or Swindon • Developed a ‘Portfolio Management’ strategy to help realise the full potential of this growt

  51. Slide 51: Viridor Financial Performance

    VIRIDOR FINANCIAL PERFORMANCE(1) £M H1 2015/16 H1 2014/15 CHANGE FY 2014/15 Revenue(2)(3) 410.1 424.4 (3.4%) 835.9 EBITDA 61.0 28.1 +117.1% 80.4 Underlying EBITDA(4) 90.9 55.3 +64.4% 135.3 Operating Profit 20.5 0.2 - 21.6 PBT 12.9 4.7 +174.5% 27.7 Capital Investment(3) 107.9 127.3 (15.2%) 262.2 (1)

  52. Slide 52: Viridor Financial Performance

    VIRIDOR FINANCIAL PERFORMANCE(1) £M H1 2015/16 H1 2014/15 CHANGE FY 2014/15 ERF 43.8 2.0 +2,090.0% 33.7 Landfill gas power generation 16.0 15.4 +3.9% 35.8 Landfill 4.5 9.3 (51.6%) 15.4 Recycling 7.2 10.0 (28.0%) 11.5 Collections 6.3 5.4 +16.7% 10.3 Contracts and other 13.8 13.2 +4.5% 27.2 Indirect c

  53. Slide 53: Viridor Underlying EBITDA

    VIRIDOR UNDERLYING EBITDA £M 41.8 2.7 90.9 (2.8) (4.2) (1.9) 55.3 (1) H1 2014/15 ERFs Share of JV EBITDA Recycling Landfill Energy Other H1 2015/16 & IFRIC 12 Interest Receivable (1) Contracts, Collections and other, including operating profit on disposal of Whitehead landfill and Viridor Project En

  54. Slide 54: Joint Venture Profitability

    VIRIDOR JOINT VENTURE PROFITABILITY £M H1 2015/16 H1 2014/15 CHANGE FY 2014/15 Lakeside Share of EBITDA 7.6 9.4 (19.1%) 18.1 Viridor Laing Greater Manchester Share of EBITDA 1.6 1.5 +6.7% 3.0 Share of IFRIC 12 interest receivable 5.7 6.0 (5.0%) 12.1 TPSCo Share of EBITDA 6.7 4.5 +48.9% 8.2 Share of

  55. Slide 55: ERF Accounting

    VIRIDOR ERF ACCOUNTING AN ILLUSTRATIVE, LARGE ERF (C.300KT) WILL CONTRIBUTE C.£28M TO VIRIDOR EBITDA ILLUSTRATIVE ERF(1) IAS 16 IFRIC 12 JVs EBITDA £28m £12m -- IFRIC 12 Interest -- £16m -- Receivable IAS 16 IFRIC 12 JVs Share of JV EBITDA (50%) -- -- £14m • Oxford (Ardley) • Exeter • Lakeside Under

  56. Slide 56: ERF Build-out Nearing Completion

    VIRIDOR ERFS (INCLUDING JOINT VENTURES) PROGRESS ON ERF PIPELINE BASE LOAD CAPITAL MUNICIPAL ACTUAL/EXPECTED OPERATIONS SITE COST (1) GROSS CAPACITY STATUS CONTRACT COMMISSIONING END (2) Tonnes Electricity ERF BUILD-OUT (000) MWe NEARING Lakeside(3) Bolton 150 N/A 410 120 38 9 Fully operational Full

  57. Slide 57: Substantial Ongoing ERF Capex

    VIRIDOR SUBSTANTIAL ONGOING ERF CAPEX(1) CUMULATIVE CAPITAL CUMULATIVE REMAINING TOTAL ORIGINAL SPEND AT INVESTMENT SPEND TO SPEND TO PROJECT PLANNED £M 1 APRIL 2015(2) H1 2015/16 30 SEP 2015 COMPLETION SPEND PROJECT SPEND ERF projects in operation Exeter 47 1 48 - 48 47 Oxford (Ardley) 203 1 204 -

  58. Slide 58: 11th HSBC SRI Conference

    11TH HSBC SRI CONFERENCE FRANKFURT, 1-2 FEBRUARY 2016 ENVIRONMENTAL | SUSTAINABLE | PROFITABLE

Pennon Group — 11th HSBC SRI Conference 2016 on 6ix