Paladin Energy Ltd · ASX:PDN

Paladin Energy — Investor Presentation (May 2018)

19 slides from Paladin Energy's investor presentation, May 2018

  1. Slide 1: Investor Presentation

    PALADIN ENERGY LTD 12 December, 2016 Investor Presentation May 2018 Private and Confidential Paladin Energy | Investor Presentation | 0

  2. Slide 2: Disclaimer and Notes for JORC and NI 43-101 Mineral Resources and Ore Reserves

    Disclaimer and Notes for JORC and NI 43-101 Mineral Resources and Ore Reserves This presentation includes certain statements that may be deemed “forward-looking statements”. All statements in this presentation, other than statements of historical facts, that address future production, reserve or res

  3. Slide 3: Paladin: A Global Uranium Leader

    Paladin A GLOBAL URANIUM LEADER OWNS LANGER HEINRICH A STRATEGIC TIER ONE MINE BALANCE SHEET STRENGTH AND FLEXIBILITY BEST SENIOR LEVERAGE TO URANIUM UPSIDE Paladin Energy | Investor Presentation | 2

  4. Slide 4: Capital Structure and Major Shareholders

    Capital Structure and Major Shareholders Capital structure Recent share price (since re-listing on ASX) Shares Outstanding 1.713Bn A$ Share price A$ 12.0c Market capitalisation A$ 206M 0.2 Market capitalisation US$1 154M 0.19 Cash US$2 51M 0.18 Debt US$2 115M 0.17 Enterprise value US$ 218M 0.16 0.15

  5. Slide 5: Global Uranium Leader

    Global Uranium Leader Resources (measured, indicated and inferred, Mlbs) Production capacity (mlbs)1 1,023 28 27 889 23 758 611 447 12 344 10 8 271 6 89 85 84 77 58 18 Uranium One Kazatomprom Cameco BHP Billiton Areva Rio Tinto Paladin Bannerman Berkeley Penninsula Energy Deep Yellow Toro Kazatompro

  6. Slide 6: Langer Heinrich A Strategic Tier One Mine

    Langer Heinrich A Strategic Tier One Mine First Quartile All-in Cash Cost1 Lowest cost open-pit mine globally1 Top 10 Uranium Mine 2 by Production 4th largest open-pit Mineral Resources depleted to 30th June 2017 +20 Year Mine Life 3 Class Measured Indicated Tonnes Mt 60.7 21.5 Grade ppm 513 459 Met

  7. Slide 7: What has been happening in uranium?

    What has been happening in uranium? Underlying estimated uranium use  Growth in China, India and elsewhere means the nuclear based on nuclear power generation power industry is stronger than pre-Fukushima and growing 250  Utilities are “under buying” at a rate of 40-50Mlbs less per 200 year than c

  8. Slide 8: What is about to happen?

    What is about to happen?  At the current rate of “under buying” utilities will be at “zero” discretionary inventories before 2022 – buying will need to = consumption before then  Care and maintenance supply can generally come back online if prices lift to US$40-60/lb range (i.e. 2-3x current price

  9. Slide 9: Langer Heinrich Mine – Moving to Care & Maintenance

    Langer Heinrich Mine – Moving to Care & Maintenance Care & maintenance makes the most sense to preserve our strategic tier one resource for a higher uranium price  To reduce cash operating costs, Langer Heinrich ceased physical mining in November 2016 maintaining processing feed from medium grade o

  10. Slide 10: Langer Heinrich Mine – Recent Optimisation Success

    Langer Heinrich Mine – Recent Optimisation Success Optimisation has resulted in a significant reduction in C1 Cash Costs C1 Cash Cost (US$/lb) 31 Flash Splash (3QFY17) 29.07 - US$0.25/lb stand-alone saving 29 27.71 27 Mining Curtailment 25.88 25 US$/lb 23 Bicarbonate Recovery Plant - US$5-6/lb stand

  11. Slide 11: Langer Heinrich Mine - Future Optimisation Potential

    Langer Heinrich Mine - Future Optimisation Potential Innovation to be worked on during care and maintenance to re-envisage LHM as an even lower cost operator for its return to production Back-end Upgrade Project (BUP) U-pgrade  The BUP will utilise the existing LHM process across  Marenica Energy

  12. Slide 12: Non-Langer Heinrich Portfolio – An Industry Leading Suite of Development Assets

    Non-Langer Heinrich Portfolio – An Industry Leading Suite of Development Assets Michelin (100%) Mt Isa (82/91/100%)  91,500ha mineral licence in Labrador  Direct 50% interest in 2,724ha of  336,130m of cumulative licences and 82% ownership of linear drilling Canada ASX-listed Summit Resources  U

  13. Slide 13: Continued Reduction in Non-LHM Spending

    Continued Reduction in Non-LHM Spending Exploration and other controllable costs have been significantly reduced and are expected to hit a "run rate" of c. US$10-11m per year from FY19E 32.9 Reduction of c. 68% Exploration  Previously deferred exploration commitments at 5.3 the Michelin project are

  14. Slide 14: Unique Leverage to Uranium

    Unique Leverage to Uranium Our fully built capacity plus pipeline provides unique growth potential Potential volume growth within existing capacity (Mlbs) Future Pipeline Mlbs 8 Michelin 7 6 2.50 MT Isa 5 Manyingee 4 7.00 3 2 4.50 1 - LHM in full production (6- KM in full production (18 Total existi

  15. Slide 15: Strategy

    Strategy PRESERVE THE VALUE OF STRATEGIC TIER ONE LHM THROUGH CARE AND MAINTENANCE PREPARATION AND CONTINUED DEVELOPMENT OF OPTIMISATION INITIATIVES MAINTAIN KM AND EXPLORATION ON A “MINIMAL EXPENDITURE, CARE AND MAINTENANCE BASIS” MINIMISE CORPORATE AND ADMINISTRATIVE COSTS PREPARE FOR GROWTH Palad

  16. Slide 16: Paladin Energy Ltd – Contact Details

    Paladin Energy Ltd – Contact Details Head Office Level 4, 502 Hay Street Subiaco Western Australia 6008 PO Box 201, Subiaco Western Australia 6904 Telephone: +61 (0) 8 9381 4366 Facsimile: +61 (0) 8 9381 4978 Email: paladin@paladinenergy.com.au Website: www.paladinenergy.com.au Investor Relations An

  17. Slide 17: Additional Information

    Paladin Energy Ltd Additional Information Paladin Energy | Investor Presentation | 16

  18. Slide 18: Board of Directors

    Board of Directors Mr Rick Wayne Crabb  Mr Crabb holds degrees of Bachelor of Jurisprudence (Honours), Bachelor of Laws and a Master of Business Administration from the University of B. Juris (Hons), LLB, MBA, Western Australia. He practised as a solicitor from 1980 to 2004 specialising in mining,

  19. Slide 19: Resource and Reserve Tables

    Resource and Reserve Tables 30 June 2017 30 June 2017 grade % Paladin Mineral Resources M tonnes U3O8 Metal t Ownership % Canada Ore Reserves grade % Metal Ownership Measured Jacques Lake - - - 100 Michelin 17.62 0.097 17,045 100 M tonnes U3O8 t % Rainbow 0.21 0.092 193 100 Malawi Indicated Gear 0.3

Paladin Energy — Investor Presentation (May 2018) on 6ix