  1. Slide 1: Boliden Smelters: Expanding into green metals

    Boliden Smelters Expanding into green metals Daniel Peltonen, President Boliden Smelters CMD 2021

  2. Slide 2: Key highlights since CMD 2019

    Key highlights since CMD 2019  New acid plant and capacity expansions in Harjavalta - Cu concentrate feed, Cu cathodes and Ni feed  Rönnskär projects well on track - New underground repository - New Leach Plant - De-bottled Ag capacity, increased Cu feed  Bergsöe plastic separation  Increased ca

  3. Slide 3: Increasing profitability by improving raw material margins

    Increasing profitability by improving raw material margins  Gross profit development ‒ Increase ~1 BSEK 2020 compared to 2019, main part from free metals  Complex raw materials ‒ Challenging physical and chemical properties ‒ Ensure handling capability, maintain recovery levels Complex  Higher TC

  4. Slide 4: Rönnskär Leach Plant reaching commissioning

    Rönnskär Leach Plant reaching commissioning  Extracting additional value from intermediates ‒ 25 ktonnes lead sulphate ‒ 25 ktonnes copper/zinc sulphate  Decreasing waste volume to underground repository by 80%  Capex: 750 MSEK Rönnskär Leach Plant  Commissioning Q2 2021 CAPITAL MARKETS DAY MARC

  5. Slide 5: Harjavalta Ni Expansion coordinated with maintenance

    Harjavalta Ni Expansion coordinated with maintenance  Nickel feed capacity from 310 to 370 ktonnes  Lower CO2 intensity by up to 20%  Improving safety by increasing automation  Greater raw material flexibility  Capex: 40 MEUR  Commissioning Q3 2021 Harjavalta Ni Matte station CAPITAL MARKETS D

  6. Slide 6: Committing to Green Metals with Boliden Low-Carbon Copper

    Committing to Green Metals with Boliden Low-Carbon Copper  Copper with a low carbon footprint, 4500 verified by third party 4000 >4kg >4kg  Produced from Boliden copper 3500 concentrate and recycled copper 3000  All significant emission categories from 2500 cradle-to-gate included 2000 1.5kg 1500

  7. Slide 7: World's first verified Low-Carbon Copper now available

    World’s first verified Low-Carbon Copper now available! Boliden Low-Carbon Copper <1.5kg CO2/kg Cu Produced from copper concentrate mined in our own mines  25% of Boliden´s annual Low-Carbon Copper capacity already contracted ‒ Agreements with Schwering und Hasse, Essex Boliden Recycled Copper Furu

  8. Slide 8: Green Zinc – Odda 4.0

    Green Zinc – Odda 4.0  Strong industrial logic Strategic Rationale  Economies of scale  Efficient logistics  Energy efficiency  Automation and digitalization  Recovery of lead and silver  Strong environmental credentials  Excellent CO2 footprint  100% hydroelectric power  Sustainable waste

  9. Slide 9: Odda 4.0 – Permit process still pending

    Odda 4.0 – Permit process still  We ask for a longer permit pending commitment ‒ 20 years to motivate investment  Evaluating environmental impacts of continued cavern depositing ‒ Ensuring groundwater conditions CAPITAL MARKETS DAY MARCH 17, 2021 9

  10. Slide 10: The most climate friendly and respected metal provider in the world

    The most climate friendly and respected metal provider in the world Complex raw material Production efficiency Sustainable operations Boliden green metals Improved raw material Improved recoveries Low CO2 intensity margin Kg CO2 / kg metal Sustainable waste solutions CAPITAL MARKETS DAY MARCH 17, 20