  1. Slide 1: Petroleum and Earth Resources Technology

    Petroleum and Earth Resources Technology

  2. Slide 2: LEED certification levels and points

    LEED Platinum 80 – 110 points LEED Gold 60 – 79 points LEED Silver 50 – 59 points LEED Certified 40 - 49 points

  3. Slide 3: LEED categories, purpose and points possible

    Category Purpose Points possible Sustainable Sites Reduce environmental damage 1 prerequisite by encouraging more sustainable means of transport 26 possible points Water Efficiency Encourage more efficient use of water 1 prerequisite and waste treatment 10 possible point Energy and Atmosphere Optimi

  4. Slide 4: Sustainable Site: Construction Activity Pollution Prevention

    Sustainable Site SS prerequisite1: Construction Activity Pollution Prevention • Install perimeter fencing and stormwater drainage system with sediment capturing features. • Install Vehicle Lorry cleaning at site main entrance/exit. • Install site perimeter erosion prevention control measures. • Prov

  5. Slide 5: Sustainable Site: Site Selection

    Sustainable Site SS credit 1 : Site Selection

  6. Slide 6: Sustainable Site: Development Density and Community Connectivity

    Sustainable Site SS credit 2 : Development Density and Community Connectivity

  7. Slide 7: Sustainable Site: Public Transport Access

    Sustainable Site SS credit 4.1: Alternative Transportation- Public Transport Access

  8. Slide 8: Sustainable Site: Bicycle Storage & Changing Rooms

    Sustainable Site SS credit 4.2: Alternative Transportation, Bicycle Storage & Changing Rooms

  9. Slide 9: Sustainable Site: Low-Emitting and Fuel-Efficient Vehicles

    Sustainable Site SS credit 4.3: Alternative Transportation, Low-Emitting and Fuel-Efficient Vehicles

  10. Slide 10: Sustainable Site: Parking Capacity

    Sustainable Site SS credit 4.4: Alternative Transportation, Parking Capacity

  11. Slide 11: Sustainable Site: Protect or Restore Habitat

    Sustainable Site SS credit 5.2 : Site Development-Protect or Restore habitat

  12. Slide 12: Sustainable Site: Maximize Open Space

    Sustainable Site SS credit 5.2 : Site Development-Maximize Open Space

  13. Slide 13: Sustainable Site: Storm Water Design Quality Control

    Sustainable Site SS credit 6.2 : Strom water Design – Quality Control Management Practices for Removing Total Suspended Solids from Runoff

  14. Slide 14: Sustainable Site: Heat Island Effect, Non-Roof

    Sustainable Site SS credit 7.1: Heat Island Effect- Non-Roof

  15. Slide 15: Sustainable Site: Heat Island Effect, Roof

    Sustainable Site SS credit 7.2: Heat Island Effect, Roof • Install highly reflective roofing materials )(SRI78) for at least 75% of the total roof area • Highly reflective materials such as aluzinc and/or white painted colored roofing materials

  16. Slide 16: Sustainable Site: Light Pollution Reduction

    Sustainable Site SS credit 8: Light Pollution Reduction

  17. Slide 17: Water Efficiency: Water Use Reduction

    Water Efficiency WE prerequisite 1: Water Use Reduction

  18. Slide 18: Water Efficiency: Water Efficient Landscaping

    Water Efficiency WE credit 1: Water Efficient Landscaping

  19. Slide 19: Water Efficiency: Innovative Wastewater Technologies

    Water Efficiency WE credit 2: Innovative Wastewater Technologies

  20. Slide 20: Water Efficiency: Water Use Reduction

    Water Efficiency WE credit 3: Water Use Reduction

  21. Slide 21: Energy & Atmosphere: Fundamental Commissioning

    Energy & Atmosphere EA prerequisite 1: Fundamental Commissioning of the Building Energy Systems The commissioning Agent Provide document : -OPR -BOD -Commissioning plan -Commissioning requirement -Report design review meeting -Report contractor submittals -Verifies installation and performance of sy

  22. Slide 22: Energy & Atmosphere: Minimum Energy Performance

    Energy & Atmosphere EA prerequisite 2: Minimum Energy Performance • Provide HVAC, Interior Lighting and Envelope better than as per ASHRAE 90.1 Appendix G requirements • Perform Energy Simulation/Modeling for the building HVAC, Lighting and Envelope designs • Exterior insulation shall be covered wit

  23. Slide 23: Energy & Atmosphere: Fundamental Refrigerant Management

    Energy & Atmosphere EA prerequisite 3: Fundamental Refrigerant Management • Provide Non-CFC based refrigerants for Fire protection, HVAC and Refrigeration equipment

  24. Slide 24: Energy & Atmosphere: Optimize Energy Performance

    Energy & Atmosphere EA credit 1: Optimize Energy Performance

  25. Slide 25: Energy & Atmosphere: Measurement and Verification

    Energy & Atmosphere EA credit 4: Measurement and Verification

  26. Slide 26: Materials & Resources: Storage and Collection of Recyclables

    Materials & Resources MR Prerequisite 1: Storage and Collection of Recyclables

  27. Slide 27: Materials & Resources: Recycled Content

    Materials & Resources MR credit 4: Recycled Content

  28. Slide 28: Materials & Resources: Regional Materials

    Materials & Resources MR credit 5: Regional Materials

  29. Slide 29: Indoor Environmental Quality: Minimum IAQ Performance

    Indoor Environmental Quality IEQ prerequisite 1: Minimum IAQ performance • Design ventilation as per ASHRAE 62.1 requirements 1 point for increase ventilation at least 30% above the minimum rates in ASHRAE 62.1-2007

  30. Slide 30: Indoor Environmental Quality: Tobacco Smoke Control

    Indoor Environmental Quality IEQ prerequisite 2: Environmental Tobacco Smoking (ETS) Control

  31. Slide 31: Indoor Environmental Quality: Outdoor Air Delivery Monitoring

    Indoor Environmental Quality IEQ credit 1: Outdoor Air Delivery Monitoring

  32. Slide 32: Indoor Environmental Quality: Increase Ventilation

    Indoor Environmental Quality IEQ credit 2: Increase Ventilation

  33. Slide 33: IEQ: Construction IAQ Management Plan, During Construction

    Indoor Environmental Quality IEQ credit 3.1: Construction IAQ Management Plan, During Construction • Develop IAQ Management plan according to SMACNA GUIDELINES. IAQ Management Plan

  34. Slide 34: Duct protection and hazardous materials storage

    • Enhanced duct protection to both sides • Protection to HVAC equipment Chemical/Inflammable/Hazardous Materials • Separate off site storage facility • Container of wet products, to be kept closed • Separate storage for hazardous materials

  35. Slide 35: IEQ: Construction IAQ Management Plan, Before Occupancy

    Indoor Environmental Quality IEQ credit 3.2: Construction IAQ Management Plan, Before Occupancy • System Flush-out

  36. Slide 36: IEQ: Low-Emitting Adhesives & Sealants

    Indoor Environmental Quality IEQ credit 4.1: Low-Emitting Materials, Adhesives & Sealants • Supply with Low VOC content as per GS requirements

  37. Slide 37: IEQ: Low-Emitting Paints & Coatings

    Indoor Environmental Quality IEQ credit 4.2: Low-Emitting Materials, Paints & Coatings • Supply with Low VOC content as per GS requirements

  38. Slide 38: Product Type and VOC source table

    Product Type’ Product Name / Model ‘Source of VOC Ot | ||| | oJ See ptt

  39. Slide 39: IEQ: Controllability of Systems, Lighting

    Indoor Environmental Quality IEQ credit 6.1: Controllability of System, Lighting

  40. Slide 40: IEQ: Controllability of Systems, Thermal Comfort

    Indoor Environmental Quality IEQ credit 6.2: Controllability of Systems, Thermal Comfort

  41. Slide 41: IEQ: Thermal Comfort, Design

    Indoor Environmental Quality IEQ credit 7.1: Thermal Comfort, Design

  42. Slide 42: IEQ: Thermal Comfort, Verification

    Indoor Environmental Quality IEQ credit 7.2: Thermal Comfort, Verification

  43. Slide 43: IEQ: Daylight & Views, Views

    Indoor Environmental Quality IEQ credit 8.2: Daylight & Views, Views

  44. Slide 44: Innovation & Design Process

    Innovation & Design Process ID credit : Innovation in Design

PTT Public Company — ESG Presentation (September 2017) on 6ix