    ASX ANNOUNCEMENT For personal use only 25 November 2014 01 CHIEF EXECUTIVE OFFICER’S PRESENTATION AT AGM Attached is a copy of the Chief Executive Officer’s presentation to be given at the Company’s Annual General Meeting today at 10.00 a.m. (Western Standard Time). GREG FITZGERALD Company Secretary

  2. Slide 2: Annual General Meeting

    For personal use only Annual General Meeting Chief Executive Officer – Peter Sullivan 25 November 2014

  3. Slide 3: Disclaimer

    DISCLAIMER This presentation includes certain statements, estimates and projections with respect to the future performances of Resolute For personal use only Mining. Such statements, estimates and projections reflect various assumptions concerning anticipated results, which assumptions may prove not

  4. Slide 4: 2014: Solid financials through the gold cycle

    2014: Solid financials through the gold cycle Focus on cash For personal use only Financial Highlights FY14 • Generating cash over a wide range of gold prices $2,000 Gold production 342,774 oz $1,800 Cash Costs A$922/oz $1,600 Gold price received A$1,413/oz Gold price (AUD) $1,400 Net profit after t

  5. Slide 5: Major Activities

    Major Activities Pursuing a range of opportunities For personal use only Syama – Mali • Oxide circuit expansion – commissioning to complete next month ahead of schedule • 70,000 oz/pa production lift to ~270,000oz/pa from 2015 • Stage 2 mine plan re-optimisation – open pit and U/G cutover under revi

  6. Slide 6: Prudent cash flow management

    Prudent cash flow management Operational flexibility in lower gold price environment For personal use only FY2014 $1,800 2.10 • Syama modified mine plan with reduced $1,700 1.80 capital expenditure Gold (USD) ‒ Stage 3 cut back removed, revised Stage 2 $1,600 1.50 RSG Price • Drive to reduce operati

  7. Slide 7: Syama: resetting the project

    Syama: resetting the project Managing operations closely For personal use only Syama Gold Production 200,000 • Oxide Circuit Production 175,000 – Commissioning on budget ahead of schedule 150,000 125,000 – 1mtpa throughput, 70,000oz/pa ounces 100,000 – ~ US$700/oz cash cost 75,000 – Oxide ore bodies

  8. Slide 8: Syama at depth

    Syama at depth Underground boosting ore reserves For personal use only • Supports viable robust long term mine life • Latest results firm up ore body quality at depth and increase size of potential U/G opportunity – 88m @ 2.73g/t Au (from 413m) – 47m @ 3.00 g/t Au (from 621m) – 55m @3.71 g/t Au (fro

  9. Slide 9: Bibiani: Advanced Ghana gold project

    Bibiani Advanced Ghana gold project For personal use only • Advanced gold project in West Africa – 1.7Moz Mineral Resources 1 – 3Mtpa CIL processing plant – +4Moz historic production • Fully developed site, recommencing production primarily a mine planning exercise Surface drilling target (South Hil

  10. Slide 10: Bibiani Feasibility Drilling

    Bibiani Feasibility Drilling Exceptional results from initial surface and underground holes For personal use only • Historic underground workings over 2.0km strike length and 800m depth, reported 2.0Mozs @ 9.5g/t recovered • Decline for mechanised equipment down 200m beneath pit with 500m total deve

  11. Slide 11: Ravenswood Mt Wright consistent delivery

    Ravenswood Mt Wright consistent delivery Extended mine life For personal use only • Ore production consistent 1.4Mtpa from sub-level shrinkage • Grade dilution well within expectation • 46% increase to Mt Wright ore reserve1 – Mining to extend below 600RL base – Additional 1.7Mt of ore, 137,000oz go

  12. Slide 12: Ravenswood: Beyond Mt Wright

    Ravenswood: Beyond Mt Wright New resource provides potential extension to Ravenswood For personal use only Buck Reef West • New 1.3Moz gold resource defined1 • Opportunity for a larger scale open pit • Reserves close to Ravenswood processing facility • Scoping study being finalised to assess open pi

  13. Slide 13: Golden Pride: End of a long mine life

    Golden Pride End of a long mine life For personal use only • Closure of Golden Pride end of 2013 after 15 Key statistics years in production RSG ownership 100% • Demolition of treatment plant and site rehabilitation completed Commissioned 1998 • Handover to Government planned Dec 2014 Production (FY

  14. Slide 14: Proven gold producer

    Proven gold producer Australian gold company with a focus on Africa For personal use only • Long term gold producer - 26th year of gold production • Experienced project operator and developer • Operated 9 mines across Australia and Africa (incl. 7 mines developed and closed) • ~7Moz gold produced si

  15. Slide 15: Reserves and Resources

    Reserves and Resources Reserves and Resources Strong underlying gold base Strong underlying gold base For personal use only Total Mineral Resource • Total Reserves and Resources  20% and Ore Reserve at 30 June 2014 16 – Reserves at +5Moz of gold: Gold contained ounces (Moz) 14 –  30% compared to F

  16. Slide 16: A sustainable gold producer

    A sustainable gold producer Flexibility through the gold cycle For personal use only • Long-term operator in Africa and Australia • +5Moz gold Reserves, +10Moz Resources • FY2015 guidance of 315,000oz at $890/oz • Operational flexibility in lower gold price environment • Cash generating over wide ra

  17. Slide 17: Thank you

    For personal use only rml.com.au Thank you

  18. Slide 18: JORC Reserves

    JORC Reserves RESOLUTE GROUP RESERVES and RESOURCES Reserves and Resources comply with the Australian code for reporting of Mineral Resources and Reserves (The JORC Code 2004 and JORC Code 2012) For personal use only Reserves and Resources Statement as at 30 June 2014 As at 30 June 2013 Gold Reserve

  19. Slide 19: JORC Measured & Indicated Resources

    JORC Measured & Indicated Resources 1 Gold Resources Gold Project Group Group Gold Project Group Group (includes stockpiles) Project grade Contained Share Share Project grade Contained Share Share For personal use only Tonnes (g/t) Ounces % Ounces Tonnes (g/t) Ounces % Ounces RESOURCES 1 RESOURCES 1

  20. Slide 20: JORC Inferred Resources

    JORC Inferred Resources 1 Gold Resources Gold Project Group Group Project Group Group Gold For personal use only (includes stockpiles) Project grade Contained Share Share Project Contained Share Share grade Tonnes (g/t) Ounces Gold % Ounces Tonnes (g/t) Ounces % Ounces Comments on Differences Resour