Bwr Exploration Inc. · TSXV:BWR

Bwr Exploration — Investor Presentation (June 2020)

20 slides from Bwr Exploration's investor presentation, June 2020

  1. Slide 1: 2020 Corporate Presentation

    2020 CORPORATE PRESENTATION June 2020

  2. Slide 2: Disclaimer

    Manitoba Disclaimer TSX Venture: BWR This presentation may contain LITTLE STULL forward-looking LAKE statements such as use of words or phrases such as: is poised to, historical resource estimates, to be appointed, PROJECT (GOLD)to create, up to, expected to cost, yet to be defined, etc. Such forwar

  3. Slide 3: A Strategic Investment

    Manitoba A Strategic Investment TSX Venture: BWR BWR Exploration Inc. (“BWR” LITTLE STULLTSX.V) LAKE is poised to capitalize on management’s corporate and exploration experience, focusing on anPROJECT (GOLD)gold project recently acquired in Manitoba, with additional interest in other gold early stag

  4. Slide 4: Management + Directors

    Manitoba Management + Directors TSX Venture: BWR Management: LITTLE STULL LAKE Independent Directors: PROJECT (GOLD) Neil D. Novak. (B.Sc., FGAC, P.Geo.): Norman Brewster: Founder, President, CEO and Director Mining Executive, Professional Geologist George Duguay (CPA, CGA, FCIS): Earl Coleman: Foun

  5. Slide 5: Corporate Mission Statement

    Manitoba Corporate Mission Statement TSX Venture: BWR ■ BWR’s corporate mission is to increase shareholder value by acquiring/exploring precious and base metal exploration project(s), LITTLE STULL LAKE PROJECT (GOLD) located in exploration and financing friendly jurisdictions in Canada, and advancin

  6. Slide 6: Exploration Projects

    Manitoba Exploration Projects TSX Venture: BWR LITTLE STULL LAKE Manitoba PROJECT (GOLD) Gods River Airport Gods Lake Airport LITTLE STULL LAKE PROJECT Red Sucker Lake Airport PROJECT (GOLD) Island Lake/ & AIRPORT Garden Hill Airport LOCATIONS (Heli-support) Winnipeg Airport Dryden Airport Ontario T

  7. Slide 7: BWR's Flagship Project

    Manitoba BWR’s Flagship Project TSX Venture: BWR ■ LITTLE STULL LAKE The Little Stull Lake Gold Project (“LSLGP”) is the 2020-21 focus project for BWR, reported to host 5 gold zones over a 6.2 km portion of a regional (80km+) regional shear PROJECT (GOLD) zone; 40 km in Manitoba controlled by BWR wi

  8. Slide 8: Little Stull Lake Gold Project

    Little Stull Lake Gold Project Manitoba An Emerging Gold Camp in NE Manitoba TSX Venture: BWR LITTLE STULL LAKE Property consists of 20 staked claims (staked in PROJECT (GOLD) 1985/86) covering 2,387 ha (23.87 sq km) of favourable geology, hosting the main gold occurrences in the area, surrrounded b

  9. Slide 9: Little Stull Lake Gold Project Highlights

    Manitoba Little Stull Lake Gold Project TSX Venture: BWR LITTLE STULL LAKE HIGHLIGHTS PROJECT (GOLD) A plethora of historical results available as assessment files provide excess banked credit until 2025 and beyond. 25km West: God’s Lake Mine 4990 Kg of Au produced 1935-43 Historical exploration cam

  10. Slide 10: Historic drill confirmed Gold Occurrences

    9 “historic drill confirmed” Gold Occurrences, Manitoba related to Wolf Bay Shear Zone TSX Venture: BWR LITTLE STULL LAKE PROJECT (GOLD) Ontario Québec VENDÔME SUD PROJECT Kirkland Lake (COPPER, NICKEL) SHUNSBY PROJECT 10 (ZINC, COPPER)

  11. Slide 11: West Zone. 1.4 km length

    West Zone. 1.4 km length Historic Drill Results to be Verified Manitoba TSX Venture: BWR LITTLE STULL LAKE PROJECT (GOLD) Ontario Québec VENDÔME SUD PROJECT Kirkland Lake (COPPER, NICKEL) SHUNSBY PROJECT 11 (ZINC, COPPER)

  12. Slide 12: Vertical cross sections through West Zone

    Vertical cross sections through West Zone, with Proposed Drill Holes Manitoba TSX Venture: BWR LITTLE STULL LAKE PROJECT (GOLD) Ontario Québec VENDÔME SUD PROJECT Kirkland Lake (COPPER, NICKEL) SHUNSBY PROJECT 12 (ZINC, COPPER)

  13. Slide 13: Exploration Plans for Little Stull Lake

    Exploration Plans for Little Stull Lake with Vertical Longitudinal Manitoba Section of historical drill results 1985 - 2007 TSX Venture: BWR 2020 – 2021 Exploration Program LITTLE expected to cost ~ $4 million STULL LAKE (3 phases) PROJECT Phase 1 ($750 K) during early summer of(GOLD) 2020 • Re-esta

  14. Slide 14: Regional Exploration Potential

    Regional Exploration Potential, Airborne Magnetic survey interpretation, Manitoba Computer Aided Resource Detection System “CARDS” identifies 26 new gold prospects. TSX Venture: BWR LITTLE STULL LAKE PROJECT (GOLD) Ontario Québec VENDÔME SUD PROJECT Kirkland Lake (COPPER, NICKEL) SHUNSBY PROJECT 14

  15. Slide 15: Vendôme Sud Project (Quebec)

    Manitoba Vendôme Sud Project (Quebec) TSX Venture: BWR Property consists LITTLEof STULL 16 lots covering LAKE 678 hectaresPROJECT (GOLD) of favorable geology for VMS, MMS and gold mineralization, Historical non-compliant resource of 317,000 tonnes averaging 0.82% Ni, 0.68% Cu (MERN files) Vendôme Su

  16. Slide 16: Vendôme Sud, drill ready

    Manitoba Vendôme Sud, drill ready TSX Venture: BWR LITTLE • Magnetic modelling STULL in completed LAKE 2016 PROJECT airborne survey (GOLD) suggests that the historical drilling (1964) did not adequately test the magnetically inferred down structure potential of the project. • BWR completed a localiz

  17. Slide 17: Ontario Exploration Project (Shunsby base metals)

    Ontario Exploration Project (Shunsby base metals) Manitoba TSX Venture: BWR LITTLE STULL LAKE PROJECT (GOLD) Shunsby Project 70.28% accretive JV interest in Cu-Zn-Pb-Ag property Property consists of 20 Patent Mining claims (surface and mineral rights) Ontario Road accessible, Infrastructure (rail an

  18. Slide 18: Corporate Focus / Financing Goals

    Manitoba Corporate Focus / Financing Goals TSX Venture: BWR Main focus for BWR is on the LITTLE Little Stull STULL LAKE Lake Gold Project, qualifies as a Flow Through project in Manitoba, where FT tax incentivesPROJECT are the highest in Canada, with a financing goal of raising up to $4 million in t

  19. Slide 19: Corporate Structure

    Manitoba Corporate Structure TSX Venture: BWR 79,502,461 shares currently LITTLE STULLissued LAKEand outstanding. • ManagementPROJECT (GOLD) (insiders) currently own: 13,294,800 shares (~16.7%) • Consultants to BWR own: 7,500,000 shares (9.4%) • Puma currently owns: 1,450,000 shares (~1.8%) • Retail

  20. Slide 20: Contact Information

    Manitoba Contact Information TSX Venture: BWR LITTLE STULL LAKE PROJECT (GOLD) BWR Exploration Inc. 3rd Floor – 82 Richmond St. E., Toronto, ON M5C 1P1 Neil Novak, P.Geo. (President/CEO) Ontario E nnovak@bwrexploration.com T 416 848 6866 Carl Desjardins (Paradox-pr) Québec E carldesjardins@paradox-p

BWR Exploration — Investor Presentation (June 2020) on 6ix