Traka Resources Ltd

Traka Resources — Shareholder Meeting (November 2022)

14 slides from Traka Resources's shareholder meeting presentation, Nov 25, 2022

  1. Slide 1: Traka Resources Limited – AGM Presentation ASX Announcement

    Traka Resources Limited ABN: 63 103 323 173 25 November 2022 Company Announcements Office ASX Limited Level 4, 20 Bridge Street SYDNEY NSW 2000 ANNUAL GENERAL MEETING PRESENTATION Attached is a copy of a presentation on the Company’s activities to be made to shareholders at the Company’s Annual Gene

  2. Slide 2: 2022 Annual General Meeting

    2022 ANNUAL GENERAL MEETING Gold Copper and REE potential at Mount Cattlin AGM Presentation, 25 November 2022 | Patrick Verbeek, Managing Director

  3. Slide 3: Disclaimer

    DISCLAIMER This presentation has been prepared by Traka Resources Limited ABN 63 103 323 173 (Traka) for the sole purpose of providing financial, operational and other information to enable recipients to review the business activities of Traka. This presentation is not intended as an offer, invitati

  4. Slide 4: 2022: Operational Summary

    2022: OPERATIONAL SUMMARY Year in review… The Mt Cattlin Gold Copper Project remains our core focus with these key milestones achieved: 1. Host rocks to all mineralisation within an Intrusive Complex- Porphyry/IRG genesis. 2. Increasing evidence for the presence of REE as part of the intrusive compl

  5. Slide 5: Mt Cattlin: Ravensthorpe Greenstone Belt

    MT CATTLIN: RAVENSTHORPE GREENSTONE BELT High-impact exploration in a Tier-1 jurisdiction • Proven mining district • Excellent existing infrastructure • Immediately next to Mt Cattlin Lithium Mine (Allkem) • Allkem retains the lithium-tantalum rights and Traka the gold and other commodity rights 4

  6. Slide 6: Mt Cattlin Gold-Copper Project

    MT CATTLIN GOLD-COPPER PROJECT An old gold and copper project now recognized as being hosted within a large intrusive complex with significant up-scale opportunity • No exploration between 2004 and 2020 • Long history of gold mining – historical production: 23kt @ 24.56g/t Au from 18 separate mines

  7. Slide 7: Mt Cattlin Gold-Copper Project – A New Chapter

    MT CATTLIN GOLD-COPPER PROJECT – A NEW CHAPTER Large-scale potential underlying the historic narrow high-grade gold/copper workings • Late stage north-east orientated structures passing through the intrusive complex • Historic mining on these structures – gossan and soil geochemistry highlight these

  8. Slide 8: Mt Cattlin – Buried Intrusives

    MT CATTLIN – BURIED INTRUSIVES Large-scale potential underlying the historic narrow high-grade gold/copper workings • 3D Geochemical Footprint Modelling • Large northern buried target - shallowest target, possibly extending to within several hundred metres of surface • 2nd buried target under Sirdar

  9. Slide 9: Mt Cattlin Project - REE Potential

    MT CATTLIN PROJECT - REE POTENTIAL • The same geochemical samples used for gold–copper footprint model being assessed for REE potential • A number of strong anomalies predominantly on north-east trends. • Only partially overlap gold-copper targets consequently no previous drilling has tested the REE

  10. Slide 10: Mt Cattlin Intrusive Complex Architecture

    MT CATTLIN INTRUSIVE COMPLEX ARCHITECTURE • MT survey places buried intrusives on the margin of very large flat lying intrusive (tonalite) • Very large Ravensthorpe Fault on the eastern margin of the No1 and No2 buried intrusives 9

  11. Slide 11: Mt Cattlin Intrusive Complex Architecture

    MT CATTLIN INTRUSIVE COMPLEX ARCHITECTURE • Long section view of the geological setting • Central flat lying tonalite body • Vertical Ravensthorpe Fault and No1 buried intrusive • Late stage mineralised gold/copper structures pass through the tonalite e.g. host to Ellendale Prospect • Carbonatites t

  12. Slide 12: Summary: Gold, Copper and REE within the Intrusive Complex

    SUMMARY: GOLD, COPPER AND REE WITHIN THE INTRUSIVE COMPLEX ✓ Deep drill holes to be completed this summer period ✓ Aircore to test near-surface REE potential within the near-surface weathered clay zone ✓ Exploring in a Tier-1 mineral belt with good logistics ✓ High-leverage investment opportunity 11

  13. Slide 13: Mineral Resource Table – Mt Cattlin Project

    MINERAL RESOURCE TABLE – MT CATTLIN PROJECT Location Indicated(t) Inferred(t) Grade(g/t Au) Ounces Au Maori Queen Main Lode 31,908 6.19 6,353 Sirdar 101,214 3.58 12,781 Sirdar 31,972 2.83 3,191 Sub-Total 101,214 63,880 22,940 Indicated+Inferred 165,094 3.94 22,940 Bottom cut-off grade of 1.0 g/t Au

  14. Slide 14: Thank You

    THANK YOU Patrick Verbeek Managing Director ASX: TKL 13

Traka Resources — Shareholder Meeting (November 2022) on 6ix