Approach Resources — Investor Presentation (May 2015)
19 slides from Approach Resources's investor presentation, May 20, 2015
Slide 1: Oil Price and the Southern Midland Basin
Oil Price and the Southern Midland Basin J. Ross Craft / Chairman, President and CEO May 20, 2015 Exhibit 99.1
Slide 2: Company overview
AREX OVERVIEW ASSET OVERVIEW Company overview Enterprise value $804MM High-quality reserve base 146 MMBoe proved reserves 66% Liquids, 38% oil $1.4 BN proved PV-10 Permian core operating area 147,000 gross (134,000 net) acres ~1+ BnBoe gross, unrisked resource potential ~2,000 Identified HZ drilling
Slide 3: Strong track record of reserve and production growth
RESERVE GROWTH PRODUCTION GROWTH Strong track record of reserve and production growth • YE14 reserves up 27% YoY • Replaced 819% of produced reserves at a drill-bit F&D cost of $8.94/Boe • 124.8 MMBoe proved reserves booked to HZ Wolfcamp play • 2014 Production increased 47% YoY • Targeting 10-14% p
Slide 4: Four significant downturn cycles during past years
Four significant downturn cycles during past 20 years WTI Cushing Spot Price Brent Spot Price 59% 12/19/1996 – 12/10/1998 53% 9/20/2000 – 11/15/2001 79% 7/3/2008 – 12/23/2008 60% 6/20/2014 – 3/17/2015 3.8 yrs 7.8 yrs 6 yrs Asian Economic Crisis 9/11 Attacks US Financial Crisis • Success of US Shale
Slide 5: Wall Street is focusing on next quarter, but we need to focus on long term
Wall Street is focusing on next quarter, but we need to focus on long term Average Brent Oil Price = $93 / bbl Average WTI Oil Price = $87 / bbl Over Last 7.5 Years Beginning When Oil Price Reached $80/BBL Including 2008 and Current Down Cycles • Success of US Shale Plays • OPEC Competing for Market
Slide 6: Is this time really different from 2008-2009 downturn?
Is this time really different from 2008-2009 downturn?
Slide 7: Fraclog and Refrac
Fraclog and Refrac • There has, is and will always be drilled, but uncompleted wells in our normal course of business • During the nd quarter of 2011, Halliburton reported 3,500 wells were uncompleted in the US • The uncompleted wells in Ohio and Pennsylvania are mainly gas wells and will have no or
Slide 8: How long can OPEC sustain the price war for market share?
$184.00 $151.00 $145.00 $131.00 $130.00 $127.00 $123.00 $107.00 $106.00 $103.00 $101.00 $98.00 $80.00 $77.30 $60.00 $54.00 $0.00 $20.00 $40.00 $60.00 $80.00 $100.00 $120.00 $140.00 $160.00 $180.00 $200.00 Libya Venezuela Yeman Algeria Iran Bahrain Nigeria Russia S. Arabia Oman Iraq Angola Ecuador UA
Slide 9: Successful oil shale plays in North America will be key to economic growth
Successful oil shale plays in North America will not only be the key to our energy independence, but also to world economic growth • Africa & Europe decline • Asia & Oceania and Central & South America stabilize • Eurasia increases slightly • Middle East increases moderately • North America increase
Slide 10: Midland Basin - Wolfcamp Horizontal Well Activity
Midland Basin - Wolfcamp Horizontal Well Activity 18.3% Northern Midland Basin 81.7% Southern Midland Basin Source: DrillingInfo and IHS
Slide 11: Midland Basin - IP and Drilling & Completion Cost
Midland Basin - IP and Drilling & Completion Cost Source: Company releases/presentations, DrillingInfo, IHS, public databases, and internal studies. Note: Three-stream IP estimated using 0.1539 Bbl per Mcf and 25% shrinkage factor. Entire Midland Basin P- 50% Average IP 689 BOE Southern Midland Basi
Slide 12: AREX HZ Wolfcamp Well Performance
AREX HZ WOLFCAMP (BOE/D) AREX HZ Wolfcamp Well Performance Note: Daily production normalized for operational downtime. Gas EUR is unprocessed wellhead volume. Oil EUR = 230 MBBL Well EUR = 510 MBOE Gas EUR = 1,271 MMCF Average GOR = 5,000 – 6,000 N = 93 Wells AREX Wolfcamp Horizontal Type Curve Year
Slide 13: Probability Distribution of AREX Type Curve Wells at Year-end 2014
Probability Distribution of AREX 93 Type Curve Wells at Year-end 2014
Slide 14: Approach's annual average horizontal well D&C cost
Approach’s annual average horizontal well D&C cost Proven track record of delivering lowest D&C cost in the Midland Basin
Slide 15: Established infrastructure in place is critical to low cost structure
Established infrastructure in place is critical to low cost structure
Slide 16: Flowback and Produced Water Recycle Facility
329,000 Bbl Capacity Facility AREX Flowback and Produced Water Recycle Facility • Reduce drilling and completion cost by $450K per well • Reduce LOE by up to $1.00 per BOE • Eliminate usage of potable fresh water for completion • Minimize surface disturbance • Skim oil sale up to 200 Bbls per day -
Slide 17: Recent Recycled Water Volumes
Recent Recycled Water Volumes Water recycling facility successfully started in March 2015 • The water recycling facility was ramped up during March and now successfully recycles up to 70+% of AREX daily flowback water volumes • More than million barrels of water treated so far
Slide 18: D&C Cost reductions will significantly improve profitability
D&C Cost reductions will significantly improve profitability Note: HZ Wolfcamp economics assume $4.00/Mcf realized natural gas price and NGL price based on 40% of realized oil price.
Slide 19: Slide 19
Approach Resources — Investor Presentation (May 2015) on 6ix