Arion Banki Hf · OMXICE:ARION

Arion Banki Hf — COWI — Arion Bank Iceland Investor Conference 2024

19 slides from Arion Banki Hf's conference presentation, Nov 14, 2024

  1. Slide 1: Investment Opportunities in the Arctic

    Investment Opportunities in the Arctic Jasper Kyndi Executive Business Development Director

  2. Slide 2: Together, we shape a sustainable and liveable world

    Together, we shape a sustainable and liveable world 37 14 November 2024 Investment Opportunities in the Arctic

  3. Slide 3: We are COWI

    We are COWI 8000 We are 8000 colleagues 100 Years of international working in services related to experience in providing engineering, and architecture. clients with innovative and sustainable solutions. 2022 7,858 In this year we deselected all The 2023 revenue in DKK new projects exploring fossil

  4. Slide 4: We work in three sectors

    We work in three sectors Renewable Infrastructure Buildings & Energy & water Industry Accelerating direct Connecting people through Buildings fit for the electrification and green automation and digitalization. future, for people and fuel production. Protecting our coasts and for the planet. cities

  5. Slide 5: COWI's investment in Iceland

    COWI’s investment in Iceland 40 14 November 2024 Investment Opportunities in the Arctic

  6. Slide 6: Mannvit joined COWI last year

    Mannvit joined COWI last year 280 • Mannvit, ranked among Iceland's top three consultant engineering With the acquisition of Mannvit, firms with more than 280 employees, offers a comprehensive range we have welcomed 280 new Icelandic colleagues to COWI, of services, from initial planning to project

  7. Slide 7: Strategic reasoning for COWI to be in Iceland

    Strategic reasoning for COWI to be in Iceland COWI’s Future Now Desirable competencies Strong market and cross-selling strategy opportunities position in Iceland • Key markets within renewable • Strong skills and experience in • Top 3 multidisciplinary engineering energy, transportation, buildings a

  8. Slide 8: Investments and trends driving Icelandic markets

    Investments and trends driving Icelandic markets Planned investments Trends leading to upsides • Frontrunner within carbon capture storage (2500 gigaton storage potential in Iceland). • $0.4B towards climate mitigation • Competitive position to produce and measures in the period 2020-2024. export gr

  9. Slide 9: Strategic reasoning for investing in Arctic Region

    Strategic reasoning for investing in Arctic Region Deposits of critical raw materials Increased focus on the Arctic crucial for modern technology in region due to its strategic location the energy, defense and health for military operations and Critical raw Military sector. operations and surveillan

  10. Slide 10: How can we help you?

    How can we help you? 45 14 November 2024 Mannvit and COWI

  11. Slide 11: Project life cycle

    Project life cycle GATE 0 GATE 1 GATE 2 GATE 3 GATE 4 Investment decision to FID to start GATE 5 Approval of conceptual Approval of basic design Decision to commence Acceptance of project start project design – and decision to – and decision to start executing project handover outcome, decision to s

  12. Slide 12: Project References

    Project References 47 14 November 2024 Investment Opportunities in the Arctic

  13. Slide 13: Hellisheidi Geothermal Energy Plant

    Completion date • Ongoing Hellisheidi Geothermal Client • ON Power (owner), Verkís, Tark Architects Energy Plant and Landslag Architects Location • Reykjavik, Iceland Challenge Reykjavik and the greater capital area needed more heating capacity while also meeting an increase in electrical demand. So

  14. Slide 14: Brúarvirkjun Hydropower Plant

    Brúarvirkjun A greener future Hydropower for agriculture Completion date Plant and shipping • 2020 Client • HS orka Challenge Location Design a a modest run-of-river power plant plant in • Biskupstungur, an area with little visual impact. Iceland Solution HS Orka teamed up with COWI in Iceland to bu

  15. Slide 15: Airports in Greenland

    Airports in Greenland Challenge The airports have to be equipped for the harsh weather conditions including freezing temperatures, snow, limited daylight and even permafrozen soil and protection of coastal protection embankments against icebergs in Ilulissat. Solution COWI has been in charge of the

  16. Slide 16: Verne Data Center

    Verne Adapting to a Data Center growing industry Challenge Verne Global's secure Icelandic campus is situated at a former NATO base and US Naval Base in Keflavik, Iceland, an ideal site for Verne’s state-of-the-art datacenter. Solution COWI provided all engineering design of Verne Global’s Data Cent

  17. Slide 17: First Water land-based farming

    Filtered seawater First Water and no antibiotics land-based or pesticides farming Challenge First Water is developing a state-of-the-art land-based Atlantic salmon farming facility in Þorlákshöfn, Iceland, with an annual production of 50,000 tons (HOG), including separate grow-out phases, a hatchery

  18. Slide 18: Let's talk

    Let’s talk www.cowi.com Jasper Kyndi, Executive Market Director jpk@COWI.COM +45 5159 6547 @COWI 53

  19. Slide 19: Investment Opportunities in the Arctic

    Investment Opportunities in the Arctic Emerging frontier in sustainable development

COWI — Arion Bank Iceland Investor Conference 2024 on 6ix