  1. Slide 1: Project Development & Exploration Opportunities – Market Dynamics Presentation 2018

    For personal use only ABN 31 116 420 378 Project Development & Exploration Opportunities Market Dynamics Presentation 2018

  2. Slide 2: Disclaimer - Forward Looking Information

    Disclaimer - Forward Looking Information For personal use only Truscott Mining Corporation Limited has prepared this announcement based on information available to it. No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the informat

  3. Slide 3: Tennant Creek Goldfields Location – Northern Territory

    Tennant Creek Goldfields Location – Northern Territory For personal use only Excellent Access and Low A Regional Centre with a Mining Infrastructure Costs Focus  500 km north of Alice Springs - main Stuart Highway to Darwin  Rail - Alice Springs to Darwin line  Mining support industries (drilling

  4. Slide 4: Truscott Project Areas

    Tennant Creek Goldfields Truscott Project Areas For personal use only Barkly Project EL31579 MA26500 MLC511 MA25952 MA26558 Insert – Westminster Project Detail Northern Territories Olympus Project Westminster Project EL29883 Hera Project Olympus Project Project EL31532 Area 0 25km 25Km Hera Project

  5. Slide 5: Mineralised Targets – (Magnetic Image)

    Westminster Project Mineralised Targets – (Magnetic Image) For personal use only Target Three Ore Body One Zone Target Two & Block Model Extension Zone Projected Projected HighHigh Grade Grade Ore Areas Ore Areas Planned Planned Drill Zones Drill Out Locations

  6. Slide 6: Central Mineralised Target Zones

    Westminster Project Central Mineralised Target Zones For personal use only Ore Body One Target 2 Block Model > 0.5g/t Au Ore Body One High Grade Zone Projected to Depth Key Gold Assays - > 0.5g/t Au Open Planned Drilling Zone Projected High Grade Gold 250m Structural Constraints ------

  7. Slide 7: Gold Project: Substantial System - Drill Out Planned

    Westminster Gold Project Substantial System - Drill Out Planned For personal use only High grade mineralisation is associated with a series of magnetic highs (Slide 5) along a strike length of two kilometres. Drilling on the first of four targets (ore body one) has intersected gold mineralisation to

  8. Slide 8: Ore Body One – Gold Mineralised Flow Plane Model

    Westminster Project – Ore Body One Gold Mineralised Flow Plane Model For personal use only N Ore Body One Block Model > 0.5g/t Au Dextral Shear Ore Body One Flow Plane Block Model Cross Section @ 353 Projected Area Planned Drilling Zone Open

  9. Slide 9: Cross Section Gold Block Model – 413880 E

    Westminster Project Cross Section Gold Block Model – 413880 E For personal use only From Au Ag Fe Bi From Au Ag Fe Bi (m) ppm ppm % ppm (m) ppm ppm % ppm 43 0.15 0.6 21.40 242 94 5.34 0.7 12.45 217 44 0.76 0.3 17.80 218 95 14.55 3.4 11.35 529 45 0.09 <0.2 15.20 37 96 2.64 3.1 8.63 85 46 44.70 3.1 24

  10. Slide 10: Cross Section Gold Block Model – 414060 E

    Westminster Project Cross Section Gold Block Model – 414060 E For personal use only From Au Ag Fe Bi From Au Ag Fe Bi Historical Drill Hole (m) ppm ppm % ppm (m) ppm ppm % ppm 7m @ 40 g/t Au 90 0.13 6.2 15.5 347 79 1.34 1.2 13.35 63 91 0.11 1.5 21.9 531 80 1.44 1.2 19.70 101 92 0.09 1.2 24.2 171 81

  11. Slide 11: High Grade Mineralised System

    Westminster Project High Grade Mineralised System For personal use only Historical and more recent drilling intersections provide (Slides 9 & 10) an indication of the high level of poly-metallic mineralisation that has occurred. These intersections support a structurally constrained block model that

  12. Slide 12: Historical Underground Mining – Major Gold Deposits

    Tennant Creek Goldfield Historical Underground Mining – Major Gold Deposits For personal use only Transitions in Mining Methods - Underground Mining - Gold Zones - Major Deposits The change from shaft supported hand held methods (Nobles Nob) to decline supported mechanisation (White Devil) Mine Oper

  13. Slide 13: Ore Body One – Gravity Image

    Westminster Project Ore Body One – Gravity Image For personal use only Influence of Structure on Mineralisation: Modelled Au Ore Blocks Overlying Gravity Image

  14. Slide 14: Exploration - Structural Control

    Tennant Creek Goldfield Exploration - Structural Control For personal use only All exploration initiatives are now planned utilising structural frameworks for targeting mineralisation At Westminster structural elements (Slide 13) in accordance with the structural model are evident in ground based gr

  15. Slide 15: Target Three - Sheared Ironstone

    Westminster Project – Target Three - Sheared Ironstone Mineralisation – 5m @11.8 g/t Au - 130m Below Outcrop For personal use only 103 083

  16. Slide 16: Strategic Expansion - Barkly Project

    Strategic Expansion - Barkly Project (NT Gov Geology Map) For personal use only σ1 EL 31532 Target A σ1 Target B

  17. Slide 17: Potential Explosion of Search Activity

    Potential Explosion of Search Activity Driven by Exploration Models – Market Conditions For personal use only Larger scale structural analysis has been applied as a new tool for selecting additional project areas (Slide 16), the new Barkly Project. The strategic expansion in tenement holdings antici

  18. Slide 18: Orogenic Suture – Mineralised Shear Corridor

    Orogenic Suture – Mineralised Shear Corridor Tanami Tennant Goldfields For personal use only Ơ1 Major Gold Mining Centres Ơ1 R R 100Km