  1. Slide 1: Sesa Goa Limited Investor & Analyst Site Visit

    SESA GOA LIMITED Investor & Analyst Site Visit PK Mukherjee, CEO 28 September 2012 1

  2. Slide 2: Cautionary statement and disclaimer

    Cautionary statement and disclaimer This presentation contains “forward-looking statements” – that is, statements related to future, not past, events and may be interpreted as „forward looking statements‟ within the meaning of applicable laws and regulations. In this context, forward-looking stateme

  3. Slide 3: Iron Ore Scenario

    IRON ORE SCENARIO 3

  4. Slide 4: Long term demand continues to be robust

    Long term demand continues to be robust Long term demand will remain intact Urbanisation is expected to continue at a rapid pace (billion people)  World urbanization is increasing Urban Population rapidly; Chinese population migration Rural Population is at its highest and India is also following i

  5. Slide 5: Iron ore – seaborne trade is buoyed by China

    Iron ore – seaborne trade is buoyed by China Chinese seaborne Iron ore trade 1600 (million tonnes)  Global iron ore seaborne trade and +829 1,516 Steel is expected to increase at CAGR of ~8.7% and ~4.5% respectively. 1400  Demand is driven by the crude steel 1200 production of China which is set t

  6. Slide 6: Global seaborne iron ore supply

    Global seaborne iron ore supply Supply from Africa CHINA  New force of Iron ore hub  Country Specific risks  +34bt R&R in West Africa Supply from India  Infrastructure constraint – port, rail, etc.  Regulatory scenarios 66 79 92  Advantage of proximity to 255 China  Potential to tap the gap o

  7. Slide 7: Indian iron ore mining scenario

    Indian iron ore mining scenario Current Issues GOA  Export Duty (Currently at 30%) Favourable for Mine to Jetty  Royalties and Taxes (MMDR) transport (Avg. 15 kms)  Mining and Export ban in Karnataka Low cost due to river  Shah Commission, CEC, etc. transportation  Temporary Suspension of Minin

  8. Slide 8: Operations

    OPERATIONS 8

  9. Slide 9: Where we operate

    Where we operate INDIA Iron Ore Operations 1. Codli Mines, Goa 2. Sonshi / Surla Mines, Goa 3. Bicholim Mines, Goa 4. A Narrain Mine, Karnataka Pig Iron & Met Coke Operations 5. Pig Iron Plant, Goa 6. Met Coke Plant, Goa Power Plant, Goa LIBERIA Iron Ore Project 7. Bomi Hills, WCL 8. Bea Mountain, W

  10. Slide 10: Goa operations

    Goa operations Drying of ore Hauling/Loading 2.5 KMS 16 KMS Mine Processing Bundar Sea Port Plant Loading at Prospecting port by MOHP Blasting/Drilling Dozing Dry Screening Loading/Hauling Wet Processing/ Tailing disposal Mid–stream loading Transhipper Mother vessel 10

  11. Slide 11: Karnataka operations

    Karnataka operations 16 KMS Railway Yard 1 KM Mine Processing Plant Prospecting Blasting/Drilling Dry Screening 290 KMS Dozing Loading/Hauling Railway Yard 429 KMS 75 KMS Mangalore Port Goa Jetty 11

  12. Slide 12: Competitive operations

    Competitive operations Goa Operations Karnataka Operations Cost Competitive for Sea borne trade Cost Competitive on domestic supplies ─ Lowest quartile cost position* ─ Well placed to serve nearby steel mills ─ Integrated infrastructure with Proximity to ─ Dedicated logistics infrastructure port and

  13. Slide 13: Maintaining cost leadership

    US$/dry tonne 0 10 20 30 40 50 60 70 90 100 80 0 Sesa Goa: Lumps, Fines Rio Tinto Australia: Mining Lumps, Fines Pelletizing Port Costs Processing 200 Source: Metalytics, September 2012 Inland Transport Royalties & Export Duties Vale: Lumps, Fines 400 Maintaining cost leadership…. CSN: Lumps, Fines

  14. Slide 14: Continued focus on exploration

    Continued focus on exploration 800 Increased R&R Base Mine Life* 704 700 3.5 X +18 In last five years years 600 330# 500 Liberia 400 India 306 300 275 240 203 200 374 275 306 240 100 203 0 31 Mar 08 31 Mar 09 31 Mar 10 31 Mar 11 31 Mar 12 Reserves–Resources Growth “Sustained and Accelerated” * At cu

  15. Slide 15: Value addition business

    Value addition business Pig Iron kt Doubled the capacity post Vedanta acquisition 700 2007 2012 625  India‟s largest producer of low phosphorous pig iron 600 560  First to introduce low phosphorous foundry 500 grade pig iron in India 400  Sinter plant of 800kt capacity is also 300 280 progressing

  16. Slide 16: Western Cluster Limited, Liberia

    WESTERN CLUSTER LIMITED, LIBERIA 16

  17. Slide 17: Aeromagnetic survey confirms strong mineral potential

    Aeromagnetic survey confirms strong mineral potential ‒ Aggressive drilling in progress at Bomi Mine ‒ ~25,000 meters of diamond & RC drilling completed as on 31 August 2012 ‒ Exploration in Bea Mountain to begin in Q3FY13 ‒ Exploratory drilling and test work in progress for first JORC resource stat

  18. Slide 18: Advantages of being in Liberia

    Advantages of being in Liberia.... Resource Rich Area Distance to port (unit: kms) ‒ Three mining assets – Bomi, Mano and Bea Mountain ‒ Estimated resource base of about 330 mt (Saleable ore) ‒ Potential to increase at-least by 3x post exploration ‒ Mining concession area of 285 kms West Africa the

  19. Slide 19: Significant developments underway

    Significant developments underway 27.0 9.0 5.0 Capacity Capacity Capacity First Exit Exit Exit Shipment 2014 2015 2016 2017 First JORC R&R by Clearance received Developing mining & Developing Road, Mining & Processing Environment Q3FY13 for Bomi for exploration processing facility at Rail and Port E

  20. Slide 20: Sustainability

    SUSTAINABILITY 20

  21. Slide 21: Health Safety and Environment

    Health Safety and Environment  Our aim is to reach & sustain Zero Harm Lost Time Injury Frequency Rate 2.5 2.16 LTIFR reduced by  62% reduction in LTIFR in last five years 2 1.8 62% In last five years 1.5  All our units are ISO 9001, ISO 14001, OHSAS 1.2 1.21 1 0.86 18001 certification* & SA 8000

  22. Slide 22: ~ half a million lives touched...

    ~ half a million lives touched... 22

  23. Slide 23: Summary

    Summary Sesa remains competitive in extremely challenging environment Low cost operations Focus on exploration; continue to add more than depletion Liberia driving the next phase of growth Embed sustainable development into every aspect 23

  24. Slide 24: Unearthing the future

    SESA GROW! SESA GOA LIMITED 24