  1. Slide 1: 2025 Electric IRP TAC Meeting No. 10 Agenda

    2025 Electric Integrated Resource Plan Technical Advisory Committee Meeting No. 10 Agenda Tuesday, June 18, 2024 Virtual Meeting – 8:30 am to 10:00 am PTZ Topic Staff Introductions John Lyons Preferred Resource Strategy Results Planning Team Resource Adequacy Washington Customer Benefit Indicator Im

  2. Slide 2: 2025 IRP TAC 10 Introductions

    2025 IRP TAC 10 Introductions John Lyons, Ph.D. Technical Advisory Committee Meeting No. 10 July 16, 2024

  3. Slide 3: Today's Agenda

    Today’s Agenda Introductions, John Lyons Preferred Resource Strategy Results, Planning Team Resource Adequacy Washington Customer Benefit Indicator Impacts Resiliency Metrics 2

  4. Slide 4: Remaining 2025 Electric IRP TAC Schedule

    Remaining 2025 Electric IRP TAC Schedule • TAC 11: July 30, 2024: 8:30 to 10:00 (PTZ) o Preferred Resource Strategy Results o Portfolio Scenario Analysis o LOLP Study Results • TAC 12: August 13, 2024: 8:30 to 10:00 (PTZ) o Preferred Resource Strategy Results (continued) o Portfolio Scenario Analysi

  5. Slide 5: 2025 Electric IRP Document

    2025 Electric IRP Document Chapter/Sub Chapter TAC Date Executive Summary October 1, 2024 1. Introduction, Stakeholder Involvement, and Process Changes October 1, 2024 2. Economic and Load Forecast September 3, 2024 a. Economic Conditions b. Avista Energy & Peak Load Forecasts c. Load Forecast Scena

  6. Slide 6: Appendix

    Appendix Chapter/Sub Chapter Proposed Completion Draft TAC Presentations (Already Available) January 2, 2025 Work Plan (Already Available) January 2, 2025 AEG EE/DR Potential Assessment September 3, 2024 10-year Transmission/Distribution Plan ? Transmission Generation Integration Study September 3,

  7. Slide 7: 2025 Electric Integrated Resource Plan Draft Preferred Resource Strategy

    2025 Electric Integrated Resource Plan Draft Preferred Resource Strategy James Gall & Mike Hermanson Technical Advisory Committee Meeting No. 10 July 16, 2024

  8. Slide 8: LOLP Study Update

    DRAFT LOLP Study Update • During subsequent analysis after the June 4, 2024 TAC Meeting it was determined some industrial loads were double counted – both in the hourly load model that is an input to the reliability model and the reliability model itself • The net result of this correction reduces t

  9. Slide 9: Resource Adequacy Assumptions

    DRAFT Resource Adequacy Assumptions 400 Maintenance Adjustment 345 350 300 • Winter PRM: 24% (was 22%) Average MW 250 227 200 160 – Uses 5% LOLP and 330 MW of market 150 93 118 100 81 • Summer PRM: 16% 54 50 28 33 30 38 50 - – Based on single largest contingency Jan Feb Mar Apr May Jun Jul Aug Sep O

  10. Slide 10: Resource Position

    DRAFT Resource Position Monthly Peak Hour Position Monthly Energy Position Capacity 1 2 3 4 5 6 7 8 9 10 11 12 Energy 1 2 3 4 5 6 7 8 9 10 11 12 2026 (40) 108 288 369 243 136 9 (22) 271 247 153 4 2026 (26) 22 170 345 706 518 173 74 198 170 59 16 2027 (3) 146 333 429 306 198 65 33 327 296 194 44 2027

  11. Slide 11: Preferred Resource Strategy (Sent out on July 10th)

    DRAFT Preferred Resource Strategy (Sent out on July 10th) Nameplate MW 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 Shared System Resource Mrkt/Trans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Natural Gas 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Sol

  12. Slide 12: Preferred Resource Strategy (Updated)

    DRAFT Preferred Resource Strategy (Updated) Nameplate MW 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 Shared System Resource Mrkt/Trans 40 4 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Natural Gas 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Solar 0 0 0 0 0

  13. Slide 13: Named Community Investment Fund Considerations

    Named Community Investment Fund Considerations • NCIF project spending on future resources size and type is unknown. • IRP accounts for these potential projects by forcing the model to select excess energy efficiency and DERs • The table below is the estimated selection assuming • $2 million spendin

  14. Slide 14: Long Term Resource Changes

    DRAFT Long Term Resource Changes Resource 2026-30 2031-35 2036-40 2041-45 Total Natural Gas 99 0 90 124 313 Natural Gas Retirements (64) 0 (36) (456) (556) Thermal Total 35 0 55 (333) (242) Power to Gas CT 0 0 90 196 287 Hydrogen 0 0 0 94 94 Power to Gas Total 0 0 90 291 381 Northwest Wind 400 300 0

  15. Slide 15: PRS Resource Adequacy

    DRAFT PRS Resource Adequacy • The PRS for the listed year is used as the resources available along with market purchases and sales, and reliability metrics are calculated. Metric 2030 PRS 2045 PRS LOLP 0.5% 2.3% LOLE 0.01 0.05 LOLH 0.075 0.528 LOLEV 0.019 0.128 EUE (with reserves) 6.7 103.4 EUE (wit

  16. Slide 16: Clean Energy Transformation Act Compliance

    DRAFT Clean Energy Transformation Act Compliance 1,400 Clean Gen =< monthly net load Jurisdictional REC Purchases 1,200 Clean Gen > monthly net load Idaho Hydro REC Sales Net Retail Load Average Megawatts 1,000 Primary Compliance Target 800 600 400 200 - 2030- 2034- 2038- 2042- 2026 2027 2028 2029 2

  17. Slide 17: Clean Energy Forecast as Percent of Load

    DRAFT Clean Energy Forecast as Percent of Load 140% 120% Existing New 100% 42% 75% 21% 32% 39% 13% 13% 30% 54% 80% 12% Percent of Load 11% 60% 40% 81% 77% 79% 80% 77% 78% 75% 73% 72% 71% 66% 68% 60% 54% 56% 20% 0% Washington Washington Washington Washington Washington Idaho Idaho Idaho Idaho Idaho S

  18. Slide 18: Average Energy Rate Forecast (Nominal)

    DRAFT Average Energy Rate Forecast (Nominal) Question: Should the PRS be constrained to the 2% cost cap? $0.30 Electric Washington Exceeds CETA Cost Cap $0.25 Electric Idaho $0.20 $ per kWh $0.15 $0.10 $0.05 $0.00 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2

  19. Slide 19: Net System Greenhouse Gas Emissions

    DRAFT Net System Greenhouse Gas Emissions 1.8 1.6 Emissons "Sold" Net Emissions 1.4 1.2 Million Metric Tonnes 1.0 0.8 0.6 0.4 0.2 0.0 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 13

  20. Slide 20: Transmission Considerations

    DRAFT Transmission Considerations • Rathdrum Area: New natural gas CTs begin in 2030, these are likely located in North Idaho, new transmission will be required, if projects continue to be sited in the area additional reinforcement is needed. • Off-System Imports: Need to increase connections to mar

  21. Slide 21: Demand Response

    DRAFT Demand Response Program Customer Segment Washington WA: Total Idaho ID: Total Start Year Potential Start Year Potential Electric Vehicle TOU Commercial 2026 8.8 2029 0.9 Battery Energy Storage All 2026 10.4 2029 2.8 Peak Time Rebate Residential/Sm. Com. 2026 6.0 2029 4.2 Variable Peak Pricing

  22. Slide 22: Energy Efficiency By Sector & State

    DRAFT Energy Efficiency By Sector & State 1,400 ID WA Total 1,239 1,211 1,172 • New energy efficiency meets 9.8% of 2045 system load 1,200 1,053 1,097 1,133 • Washington Biannual target to be calculated later 1,000 1,000 946 882 813 Gigawatt-Hours 800 734 873 891 845 655 793 818 761 568 724 600 686

  23. Slide 23: Energy Efficiency Supply Curves (2045)

    DRAFT Energy Efficiency Supply Curves (2045) Washington Idaho $500 $500 $450 $450 $400 $400 $350 $350 $300 $300 $ per MWh (UCT) $ per MWh (TRC) $250 $250 $200 $200 $150 $150 $100 $100 $50 $50 $0 $0 0 200 400 600 800 1,000 1,200 1,400 1,600 1,800 0 200 400 600 800 1,000 1,200 1,400 1,600 1,800 Gigawa

  24. Slide 24: 2035 Top Measure Savings (GWh)

    DRAFT 2035 Top Measure Savings (GWh) Row Measure State 2035 Row Measure State 2035 1 Linear Lighting WA 81.34 1 Linear Lighting ID 43.34 2 Windows - High Efficiency (ENERGY STAR 7.0) WA 27.98 2 High-Bay Lighting ID 12.70 3 High-Bay Lighting WA 25.00 3 Engine Block Heater Controls ID 11.05 4 Building

  25. Slide 25: Washington Energy Burden CBI

    DRAFT Washington Energy Burden CBI #2a: WA Customers with Excess Energy Burden #2b: Percent of WA Customers with Excess Energy Burden (Before Energy Assistance) (Before Energy Assistance) 70,000 25.0% 60,000 20.0% 50,000 40,000 15.0% 30,000 10.0% 20,000 5.0% 10,000 0 0.0% 2026 2027 2028 2029 2030 20

  26. Slide 26: DER Additions CBI

    DRAFT DER Additions CBI #5a: Total MWh of DER <5MW in Named Communities 200,000 180,000 160,000 MWh 140,000 120,000 100,000 80,000 60,000 40,000 20,000 0 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 #5b: Total MWh Capability of DER Storage <5MW

  27. Slide 27: WA Low Income/Named Community Investments CBI

    DRAFT WA Low Income/Named Community Investments CBI #6: Approximate Low Income/Named Community Investment and Benefits $80 Annual Utility Benefits $70 Annual NEI Benefits $60 Annual Investment $50 Millions $40 $30 $20 $10 $0 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040

  28. Slide 28: Reserve Margin CBI

    DRAFT Reserve Margin CBI #7: Energy Availability- Reserve Margin 40% Winter Summer Resource Percent Above Peak 35% 30% 25% Load 20% 15% 10% 5% 0% 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 Notes: • Regional Transmission not included in Reserve

  29. Slide 29: Generation Location CBI

    DRAFT Generation Location CBI #8: Generation in WA and/or Connected Transmission System (as a Percent of System Load) 100% 80% 81% 83% 81% 80% 80% 79% Percent of Load 77% 76% 76% 76% 77% 77% 77% 77% 77% 75% 76% 76% 80% 75% 60% 40% 20% 0% 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 20

  30. Slide 30: Washington Air Emissions CBI

    Metric Tons 24 Metric Tons 0 1 2 3 4 5 0.00 0.01 0.02 0.03 0.04 0.05 2026 2026 2027 2027 2028 2028 2029 2029 2030 2030 2031 2031 2032 2032 2033 2033 2034 2034 2035 2035 #9c: Mercury 2036 2036 #9a: SO2 2037 2037 2038 2038 2039 2039 2040 2040 2041 2041 2042 2042 2043 2043 2044 2044 2045 2045 Metric To

  31. Slide 31: WA Greenhouse Gas Emissions CBI

    DRAFT WA Greenhouse Gas Emissions CBI #10a: Greenhouse Gas Emissions 1.2 Direct Emissions Net Emissions 1.0 Metric Tons (Millions) 0.8 0.6 0.4 0.2 - 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 #10b: Regional Greenhouse Gas Emissions 12.0 10.3 1

  32. Slide 32: Job Creation (Direct and Induced)

    DRAFT Job Creation (Direct and Induced) Jobs Created From Resource Selection 1,000 904 900 800 760 700 644 664 Jobs 600 529 479 496 511 500 412 400 357 386 286 321 300 250 198 200 157 117 76 100 23 48 0 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 20

  33. Slide 33: Resource Diversity (Resource Resiliency Metrics)

    DRAFT Resource Diversity (Resource Resiliency Metrics) Facility Diversity Fuel Diversity 3,500 3,500 Winter Summer Winter Summer 3,000 3,000 2,500 2,500 HHI Score HHI Score 2,000 2,000 1,500 1,500 1,000 1,000 500 500 - - 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041