Kingsrose Mining Ltd · ASX:KRM
Kingsrose Mining — Merger or Acquisition (May 2008)
25 slides from Kingsrose Mining's merger presentation, May 1, 2008
Slide 1: Market Update and Acquisitional Growth
For personal use only Kingsrose Mining Limited Market Update and Acquisitional Growth David Hatch Managing Director May 2008
Slide 2: Purpose of update
Purpose of update For personal use only Provide market update on company’s Comet Vale IPO Listing Asset. Provide preliminary market advice on intended acquisition of advanced, high grade underground epithermal gold/silver project in Indonesia.
Slide 3: Kingsrose Capital Structure
Kingsrose Capital Structure For personal use only Listed 7 December 2007 - ASX Code KRM IPO issue price 20 cents 30m new shares issued to new investors to raise $6m 35m shares prexisting or issued to vendors NED Dennis Franks exercised 1m options @ 25 cents in April 2008 5.5m unlisted op
Slide 4: Kingsrose Corporate Structure
Kingsrose Corporate Structure For personal use only Chairman – John Morris Managing Director – David Hatch Non-Executive Director – Bill Phillips Non-Executive Director – Dennis Franks Non-Executive Director – Dr Michael Andrews Company Secretary – Jeannette Smith Track record of devel
Slide 5: Comet Vale Summary
Comet Vale Summary For personal use only Strong relationship with JV Partner, Reed Resources Limited KRM investing in the business via new capital (Genset, Loco’s etc) and employment of four Tanzanian miners and (soon to be mobilised) ten Philippino miners Reed commissioned structural geology
Slide 6: Way Linggo Summary
Way Linggo Summary For personal use only Why proposed acquisition? High margin production increase Advanced project – near term production opportunity Significant exploration potential on +100km2 4th generation CoW Acquire 85% of PT Natarang Mining
Slide 7: Way Linggo continued: Other considerations
Way Linggo continued: Other considerations For personal use only Related party transaction, independent board committee established 1997 JORC compliant resource and reserves not compliant now due to loss of core No drilling since 1996 Series of check due diligence measures undertaken in view
Slide 8: Project Location
Project Location For personal use only Southern Sumatra, Indonesia
Slide 9: CoW Location
CoW Location For personal use only Lampung Province, Sumatra Contract Area 10,540 hectares
Slide 10: Site Layout
For personal use only Site Layout
Slide 11: North Vein Drill Plan
North Vein Drill Plan For personal use only
Slide 12: 10170N Section
For personal use only 10170N Section
Slide 13: Way Linggo Project Grade Distribution
Way Linggo Project Grade Distribution North Vein Long Section Viewed to the North East For personal use only Gold grades colour coded: Yellow >20g/t Red 15-20 g/t Purple 10-15 g/t Green 4-10 g/t
Slide 14: Way Linggo Ridge
For personal use only Way Linggo Ridge
Slide 15: Ore Hoisting and Services Area
Ore Hoisting and Services Area For personal use only
Slide 16: Upper, Way Tikus Portal
Upper, Way Tikus Portal For personal use only
Slide 17: Orebody Mapping in Way Tikus Adit
Orebody Mapping in Way Tikus Adit For personal use only
Slide 18: Resource/Reserve Confirmation
Resource/Reserve Confirmation For personal use only Due to loss of core and evolvement of JORC code , the 1996/97 probable resource and reserve estimates can not be re-estimated and validated from first principles The Way Linggo resource, based upon diamond drilling in the 1990’s, is therefore n
Slide 19: Resource/Reserve Confirmation cont’d: Drill Hole vs. Adit Face Samples
Resource/Reserve Confirmation cont’d… Drill Hole vs. Adit Face Samples For personal use only Way Tikus upper adit at 1065m RL intersected orebody at same location as DDH – LJ13 Drill hole intercept (45° inclination) 7.65m @ 38g/t Au and 304 g/t Ag Face sampling along line of drill hole 3.80m (
Slide 20: Resource/Reserve Confirmation cont’d: Additional Support
Resource/Reserve Confirmation cont’d… Additional Support For personal use only 1990’s drilling, sampling and assaying programme included significant QA/QC procedures, including check assays at two separate, independent assay labaratories Very good assay correlation Independent resource and res
Slide 21: Lower, Way Semung Portal and Ore Tipping Station
Lower, Way Semung Portal and Ore Tipping Station For personal use only
Slide 22: Way Semung Portal and Inclined Skipway
Way Semung Portal and Inclined Skipway For personal use only
Slide 23: Project Summary
Project Summary For personal use only Underground high grade gold/silver mine, initially planned and designed for 65,000 tpa Annualised production approximating 30,000 ozs in initial years of operation A$4 million invested by vendors, to be repaid A$8 million to complete construction Unit
Slide 24: Terms of Acquisition
Terms of Acquisition For personal use only Shareholder approval following completion of due diligence and circulation of Independent Expert Report Repayment of A$4 million vendor loans KRM to fund A$8 million construction completion KRM to issue 42.5 million shares to acquire 100% of Icon En
Slide 25: Acquisition Funding Strategy
Acquisition Funding Strategy For personal use only Pursuing potential funding from equity, financing and metal facility sources Strong equity support Seeking to lock down funding by June 2008