James Hardie Industries Plc. · NYSE:JHX

James Hardie Industries — Investor Day (September 2018)

44 slides from James Hardie Industries's investor day presentation, Sep 20, 2018

  1. Slide 1: Operations

    Exhibit 99.6 • Xxx • Xxx OPERATIONS Matt Marsh Ryan Kilcullen Dave Merkley

  2. Slide 2: Agenda

    AGENDA • Introduction • Enabling Growth & Network Returns • Transforming Our Manufacturing Approach • Customer Value Creation & FC Process Innovation • Capacity Project Update PAGE 2

  3. Slide 3: Introduction

    • Xxx • Xxx INTRODUCTION

  4. Slide 4: Hardie Operations – Historical Perspective

    HARDIE OPERATIONS – HISTORICAL PERSPECTIVE JH Operations: A significant enabler of our 35/90 organic growth strategy NETWORK CAPACITY FC MANUFACTURING PROCESS INNOVATION & WITH UNIQUE RETURNS SCALE ADVANTAGE CUSTOMER VALUE • Regional flexibility • Hatcheck scale up • Engineered for Climate ® • Effic

  5. Slide 5: Hardie Plant Overview

    HARDIE PLANT OVERVIEW Manufacturing Key Process Inventory Processes Objectives Model Raw Materials Continuous Long Continuous Make-to- Process Run Inventory Sheet Machine Raw Material Raw Material Postponed Pre-Autoclave Conversion Yield Differentiation Autoclaves Finishing Material Long Continuous

  6. Slide 6: Sheet Machine Index Concept

    SHEET MACHINE INDEX CONCEPT 4x4 Sheet Machine 9x5 Sheet Machine Machine Throughput Drivers Tub 1 Tub 1 Machine throughput of “design product” is determined by: 4 Tubs • Machine index • Film build capability Tub 4 9 Other factors that influence Tubs throughput: 4’ Width • Product line discounts on fe

  7. Slide 7: Machine Indexing Created High Throughput FC

    MACHINE INDEXING CREATED HIGH THROUGHPUT FC A culture of engineering step-change has yielded a tremendous increase in manufacturing scale Key: Tub Config Finishing SM Index PAGE 7

  8. Slide 8: Manufacturing Scale Creates FC Moat

    MANUFACTURING SCALE CREATES FC MOAT Manufacturing scale creates a significant competitive advantage machine hour machine Volume/gross Throughput Capital $/Annual Capital Fontana Plant City Tacoma Pulaski Fontana Plant City Tacoma Pulaski Capital Efficiency Unmatched Machine Size & Automation by Comp

  9. Slide 9: Process Innovation Leads to Customer Value

    PROCESS INNOVATION LEADS TO CUSTOMER VALUE Internally developed process capability enables product differentiation Product thickness & density HardieTrim ® & Artisan ® control product lines Fit-to-purpose manufacturing HardieZone ® Engineered processing for Climate ® Post-processing Aspyre engineeri

  10. Slide 10: Hardie Operations – Enabling Future Value Creation

    HARDIE OPERATIONS – ENABLING FUTURE VALUE CREATION JH Operations: Organized to deliver on the next phase of value creation in our 35/90 organic growth strategy NETWORK CAPACITY FC MANUFACTURING PROCESS INNOVATION & WITH UNIQUE RETURNS SCALE ADVANTAGE CUSTOMER VALUE High scale mega-sites Transforming

  11. Slide 11: Enabling Growth & Network Returns

    • Xxx • Xxx ENABLING GROWTH & NETWORK RETURNS

  12. Slide 12: Historical Core Concepts in Capacity Planning

    HISTORICAL CORE CONCEPTS IN CAPACITY PLANNING Core concepts of our approach to capacity management Provide supply ahead of demand to enable JH organic growth strategy Make network design investments with the end state in mind Design an optimal network footprint for JH by optimizing a multi-part equa

  13. Slide 13: Designing an Optimized JH Footprint

    DESIGNING AN OPTIMIZED JH FOOTPRINT JH Total Network Cost Trade-Off Curve Total Network Cost Network Total # of Site Locations As the Number of Freight Total Manufacturing Sites Increases Capex Site Opex PAGE 13

  14. Slide 14: Phases of Our Network Expansion

    PHASES OF OUR NETWORK EXPANSION Phase 1 Phase 2 Phase 3 Markets Existing Enabled HZ10 HZ5 Approach Greenfield Greenfield Brownfield Bias Network Significant LOH Continued LOH Reductions Product Line Flexibility Enabler Reductions Post-autoclave Value Add Multi-Line Sites Full-Wrap Capability Brownfi

  15. Slide 15: JH North American Manufacturing Network

    JH NORTH AMERICAN MANUFACTURING NETWORK Post-recessionSingle & double capacity line flat sheetadds –plants combination were constru of greenfctedield to enable& brownfield NA FC sites growth LocationsRecent brownfield driven by sites proximity have usedto raw site materials optionality & ma torket c

  16. Slide 16: Key Learnings Through Phase 3 of Our Expansion

    KEY LEARNINGS THROUGH PHASE 3 OF OUR EXPANSION Insights from our expansion to date have led us to value creation opportunities for our phase 4 expansion Key Insights Brownfield expansion offers a significant capital efficiency over greenfield Multi-line (3+ SM) plants can be efficiently run and have

  17. Slide 17: Insight Example #1: Multi-Line Operating Opportunity

    INSIGHT EXAMPLE #1: MULTI-LINE OPERATING OPPORTUNITY Addition of 3 rd SM Opportunities Cleburne Pre-Expansion Post-autoclave flexibility ColorPlus® By-pass finishing for Color Finishing Finishing Finishing Shared systems running at high utilizations, driving plant decision making despite low value a

  18. Slide 18: Insight Example #2: Regional Product Specialization

    INSIGHT EXAMPLE #2: REGIONAL PRODUCT SPECIALIZATION Regional Specialization of Products: • Input cost advantage • Machines advantaged Operational Advantages • Reduced changeovers • Improvements from specialization Opportunity to ship higher ratio of products via rail PAGE 18

  19. Slide 19: Insight Example #3: Post Autoclave Spoke Opportunity

    INSIGHT EXAMPLE #3: POST AUTOCLAVE SPOKE OPPORTUNITY Enabled mega-site provides in market, post autoclave operations  Low input cost  Low capital cost (land, building, and installation) Rail  In plant economies of scale  Competitive rail enabled Prattville, AL  Shortened truck length of haul PA

  20. Slide 20: Insight Example #4: Specialization for Effective Capacity

    INSIGHT EXAMPLE #4: SPECIALIZATION FOR EFFECTIVE CAPACITY 5 foot wide machines Optimize products to Plank Opportunity machines Plank Plank Plank Panel Plank More output with same hours Changeover Reduction Low incremental cost to produce Efficient supply chain Plant B 5 foot machine Plant A 4 foot m

  21. Slide 21: Today to 35/90 – Phase 4 of Our Network Expansion

    TODAY TO 35/90 – PHASE 4 OF OUR NETWORK EXPANSION In our phase 4 network expansion we will look to apply these insights Brownfield expansions at existing sites Investments in multi-line (3+ SM) sites will enable efficient mega-sites Individual capacity investments will deliver total network optimiza

  22. Slide 22: Core Concepts of a Mega-Site (Inside the Walls)

    CORE CONCEPTS OF A MEGA-SITE (INSIDE THE WALLS) Capex & opex efficiencies from multi- In 6 1 Market line construction & operations Potential Mega-Site Spoke Configuration 2 Flex product line capability for full local Finished Goods market coverage, specialized to distribute Inventory unit cost advan

  23. Slide 23: Core Concepts of Mega-Sites (Outside the Walls)

    CORE CONCEPTS OF MEGA-SITES (OUTSIDE THE WALLS) Deliver landed cost advantage while benefiting from site scale – In-market spoke enables freight Tacoma, WA efficiencies Reno, NV Peru, IL – High volume rail capability Pulaski, VA Fontana, CA Summerville, SC Waxahachie, TX – Optimized plant and produc

  24. Slide 24: Capacity Summary

    CAPACITY SUMMARY • Our current network footprint was designed to enable future organic volume growth at a high efficiency • Insights from our network build out are well understood, and learnings are being applied to future investments • Mega-site facilities will enable a scale advantage locally & cr

  25. Slide 25: Transforming Our Manufacturing Approach

    • Xxx • Xxx TRANSFORMING OUR MANUFACTURING APPROACH

  26. Slide 26: Historical Manufacturing Approach

    HISTORICAL MANUFACTURING APPROACH JH Manufacturing Approach: A decentralized, entrepreneurial approach utilizing step change engineering to scale a process with unlocked potential An approach that enabled unique …that contributed significantly to manufacturing capabilities… the value creation equati

  27. Slide 27: An Approach That Aligns With the Opportunity

    AN APPROACH THAT ALIGNS WITH THE OPPORTUNITY The value creation opportunity in JH manufacturing has shifted significantly… Potential of the technology Raise the potential 6x Reach the Raise the potential 18x potential 20x Machine design potential Reach the Actual machine performance Sheet Machine Th

  28. Slide 28: A New Path Forward for Hardie Manufacturing

    A NEW PATH FORWARD FOR HARDIE MANUFACTURING We are in the early stages of deployment of a shift in how we manage of manufacturing site operations… From To Local site autonomy Network standardization Step change delivers the gains Continuous improvement sustains & improves Technical/Engineering manag

  29. Slide 29: A Transformation to Lean Manufacturing

    A TRANSFORMATION TO LEAN MANUFACTURING The adoption of a lean manufacturing approach will create the platform for our manufacturing transformation Expected Outcomes of Lean Sustain & Build on Improvements • A JH manufacturing operating system • Increased standardization • Common problem solving appr

  30. Slide 30: Machine & Process Reliability

    MACHINE & PROCESS RELIABILITY We have recently launched a reliability initiative designed to increase the net production hours of our sheet machines Opportunity Approach Total Available Hrs Type 1 Loss 1. Planned Outage Type 2 Loss Minimization Type 3 Loss 2. Critical Asset Reliability Program Run W

  31. Slide 31: Additional Areas of Opportunity & Focus

    ADDITIONAL AREAS OF OPPORTUNITY & FOCUS We have invested in organizational capability to deliver on a number of specific additional opportunities inside of JH operations Product Line Operations ColorPlus ® Operations Post Autoclave 2.0 Manufacturing focus on Enabling the market share gain Creating a

  32. Slide 32: JH Manufacturing Strategy Summary

    JH MANUFACTURING STRATEGY SUMMARY • A culture of innovation & step change has delivered significant value creation from our historical manufacturing approach • Greater efficiencies in our base network will be generated from a shift to continuous improvement, world class manufacturing • We are design

  33. Slide 33: Customer Value Creation & FC Process Innovation

    • Xxx • Xxx CUSTOMER VALUE CREATION & FC PROCESS INNOVATION

  34. Slide 34: JH Manufacturing Step Change

    JH MANUFACTURING STEP CHANGE We have also doubled down on our ability to deliver break through engineering step change in all areas of JH manufacturing Step innovation in… …enables break through progress Next Generation Hatschek New Product Enablers Mfg Platform Development JH Manufacturing Capabili

  35. Slide 35: Step Changing the Hatschek Process

    STEP CHANGING THE HATSCHEK PROCESS Current Speeds vs. Enabled by step change Nameplate innovation… Potential Speed Gains Beyond Design • Significant increase in drainage rate Potential to Close Gap to Nameplate • Raw material formation modifications Current Current Speed Speed • Felt technology inno

  36. Slide 36: Manufacturing Platform Step Change

    MANUFACTURING PLATFORM STEP CHANGE Manufacturing platform innovation has the potential to unlock significant process, product and cost levers in fiber cement manufacturing Enabling Product Enabling Total Enabling New Attributes Cost Optimization Products Platform A Platform B Platform C Longer Lower

  37. Slide 37: Manufacturing and Supply Chain Scale

    MANUFACTURING AND SUPPLY CHAIN SCALE Supply Chain enables efficient, full truck load shipments to distribution Scale and aggregation allows for efficient manufacturing Optionality offered Full Truck Aggregated Paint Long Sheet Machine to Customer Shipments Runs Product Runs PAGE 37

  38. Slide 38: Manufacturing Capability Summary

    MANUFACTURING CAPABILITY SUMMARY • We have an established history in step change manufacturing innovation • We are adding to and enhancing the talent and capability of our engineering teams with the talent & capability to accelerate the pace of step change in JH • The value associated with continuou

  39. Slide 39: Capacity Project Update

    • Xxx • Xxx CAPACITY PROJECT UPDATE

  40. Slide 40: Tacoma Update

    TACOMA 2 UPDATE • In start-up phase – C+ line expected 1H FY20 • Nameplate Capacity - 300 mmstdft/year • Capabilities – Plank, Backer, HardieShingle ®, ColorPlus ® Technology • 130 Employees at full production First Stacks Produced • Site benefits – Low input cost – Proximity to growing markets PAGE

  41. Slide 41: Alabama Update

    ALABAMA UPDATE • Construction in process • Expected commissioning 1H FY20 • Initial Nameplate Capacity – 600 mmstdft/year • Anticipated Capabilities – HZ10 & HZ5 Plank, Backer, Aspyre Plank • 175 – 200 Employees at full production • Site benefits • Low input cost • Skilled manufacturing workforce •

  42. Slide 42: Summary

    SUMMARY • Tacoma II and Alabama projects are on-track • Both investments bring incremental flat sheet and product line capacity to support future demand creation • Learnings from our previous experience in building & operating sites are being applied PAGE 42

  43. Slide 43: Overall Summary

    OVERALL SUMMARY • We have a clear path forward in operations to continue to enable our 35/90 organic growth strategy • Our network design capabilities continue to improve and mega- sites are expected to be important to future capacity • Our journey to world class manufacturing has started • Process

  44. Slide 44: Q&A

    • Xxx • Xxx Q&A

James Hardie Industries — Investor Day (September 2018) on 6ix