Cazaly Resources Limited · ASX:CAZ

Cazaly Resources — Investor Presentation (February 2012)

15 slides from Cazaly Resources's investor presentation, February 2012

  1. Slide 1: Three Iron Ore Regions: Parker Range Ready to Mine

    Slide 1: Three Iron Ore Regions: Parker Range Ready to Mine

    Three Iron Ore Regions Parker Range Ready to Mine February 2012

  2. Slide 2: Disclaimer and Important Information

    Slide 2: Disclaimer and Important Information

    Disclaimer and Important Information • This presentation has been prepared by Cazaly Resources Limited (“Cazaly”). It contains forecasts and forward looking statements which are no guarantee of future performance and which involve certain risks. Actual results and future outcomes will in all likelih

  3. Slide 3: Value

    Slide 3: Value

    Value PARKER RANGE IRON ORE PROJECT (PRIOP) • NPV9: A$384M* Post-tax IRR: 129% • Based upon conservative average Fe pricing • Initial 8-9 year mine life with payback less than two years • Strategic Alliance & sale of PRIOP struck: • Non-exclusive conditional sale • $5M Con-Note – no voting or divide

  4. Slide 4: Parker Range: Project Location

    Slide 4: Parker Range: Project Location

    Parker Range: Project Location • Project located in the Yilgarn Iron Ore Province situated ~400km east of Perth • No road, rail, workforce infrastructure bottlenecks compared to the Pilbara or Mid-West • Port access being addressed Most advanced iron ore project looking to Rail Head utilise Esperanc

  5. Slide 5: Parker Range Iron Ore Project

    Slide 5: Parker Range Iron Ore Project

    Parker Range Iron Ore Project Mount Caudan Iron Ore Deposit Mount Caudan • 100% owned by Cazaly Iron Ore Deposit 4km strike • Total current resource of 35.1Mt @ 55.9% Fe (61.4% CaFe) • Low waste to Ore stripping ratio (2.3:1) • Mine to produce 31.4Mt @ 55.3% Fe (60.7% CaFe) product • Goethite-Hemati

  6. Slide 6: Iron Ore Product

    Slide 6: Iron Ore Product

    Iron Ore Product Indicative Product Specs Single Fines Only Product Targeted Option Fe% CaFe% SiO2% Al2O3% P% MnO% LOI% Fines 56.4 61.9 6.00 2.50 0.020 1.10 9.10 Only • Marketable product with acceptable levels of chemical impurities • Low Phosphorous product • Manganese component also a steel makin

  7. Slide 7: Project Scope

    Slide 7: Project Scope

    Project Scope Scope • Open Pit Mining: Ramping from 2mtpa to 4mtpa • Plant: Crushing, screening & stockpiling • Road Haul: 57km on established roads to rail • Rail Haul: On public rail to port • Other: Grid power and accommodation facilities sited 14km away at town of Marvel Loch • Estimated 750 con

  8. Slide 8: Esperance Port Sea and Land (EPSL)

    Slide 8: Esperance Port Sea and Land (EPSL)

    Esperance Port Sea and Land (EPSL) An Iron Ore Port • Currently capable of exporting 12mtpa. Cliff’s currently utilise ~10mtpa for iron ore • 20mtpa expansion planned in two stages recently announced by the State • Estimated 18-20 month construction time. Awaiting tender process • State government h

  9. Slide 9: Parker Range Project Summary

    Slide 9: Parker Range Project Summary

    Parker Range Project Summary • Potential to deliver new iron ore mine in the Yilgarn of WA at PARKER RANGE • Export option via Port of Esperance • Robust project economics NPV9 A$384M, IRR 129% • Excellent infrastructure Roads, grid power, rail, etc… • Saleable target product Very low phosphorous co

  10. Slide 10: Pilbara Iron Ore

    Slide 10: Pilbara Iron Ore

    Pilbara Iron Ore • Numerous projects in world class province • Strategic land positions • Proven iron ore occurrences • Hamersley project vended out to Winmar Resources

  11. Slide 11: Pilbara Iron Ore – Winmar, Hamersley project

    Slide 11: Pilbara Iron Ore – Winmar, Hamersley project

    Pilbara Iron Ore – Winmar, Hamersley project Winmar Deal • Winmar Resources Ltd earning 51% • Located in Central Pilbara region • Adjacent to FMG’s Solomon project • Upgraded resource: 242Mt @ 54.3% Fe (57.6% CaFe) • CAZ free carried to Definitive Feasibility Study • Exploration target of 350–400Mt

  12. Slide 12: Earaheedy Joint Ventures

    Slide 12: Earaheedy Joint Ventures

    Earaheedy Joint Ventures Potential Major New Iron Ore Province Cecil Rhodes Parker Range • Anglo American Farms-Into joint Cazaly/Vector Resources Project • Anglo to earn 75% via staged payments of up to $51M & completing a BFS • Earaheedy basin comparable in age & size to the Hamersley Basin • Init

  13. Slide 13: Earaheedy Projects

    Slide 13: Earaheedy Projects

    Earaheedy Projects Anglo JV • Prospective for large scale iron ore deposits • Maiden drill programme completed prior to commencement of Anglo JV • Identifies significant mineralisation at the Cecil Rhodes Prospect. Intersections include: 22m @ 58.1% Fe, 22m @ 57.8% Fe 26m @ 55.1% Fe • Initial work b

  14. Slide 14: Cazaly Corporate Summary

    Slide 14: Cazaly Corporate Summary

    Cazaly Corporate Summary Extensive projects in three major Iron Ore regions of Western Australia • PARKER RANGE: Potential to deliver new iron ore mine in the Yilgarn of WA Strategic alliance struck, export options being addressed, economically robust • PILBARA: Vast potential over several underexpl

  15. Slide 15: Thank You

    Slide 15: Thank You

    THANK YOU Level 2, 38 Richardson Street, West Perth, Western Australia, 6005. PO Box 396, West Perth, Western Australia, 6872 Phone: +61 8 9322 6283 Fax: +61 8 9322 6398 email: admin@cazalyresources.com.au ACN 101 049334 www.cazalyresources.com.au