Black Rock Mining Limited · ASX:BKT

Black Rock Mining — Investor Presentation (August 2018)

20 slides from Black Rock Mining's investor presentation, Aug 6, 2018

  1. Slide 1: Mahenge Graphite Project – August 2018 Investor Update

    For personal use only MAHENGE GRAPHITE PROJECT BEST OF CLASS GRAPHITE PROJECT Naturally Better Graphite August 2018 Investor Update BLACK ROCK MINING (ASX: BKT) BLACKROCKMINING.COM.AU 1

  2. Slide 2: Important Information

    Important Information For personal use only The release, publication or distribution of this presentation in certain COMPETENT PERSONS jurisdictions may be restricted by law and therefore persons in such jurisdictions into which this presentation is released, published or The information in this rep

  3. Slide 3: Table of Contents

    Table of Contents For personal use only 1. Summary 2. Black Rock Overview – Corporate 3. Execution – Focused on Delivery  On track for first product in late CY2019 4. Overview – Mahenge Graphite Project (Location + PFS metrics) 5. DFS – Pilot Plant Confirms Unique Ore and Product Quality  DFS – Ex

  4. Slide 4: Summary

    1. Summary For personal use only  100% Project Ownership – Black Rock Mining (ASX:BKT) has a 100% interest in the Mahenge Graphite Project located in Tanzania  Exceptional PFS – Optimised PFS completed in Aug 2017 with the following key metrics  Long life and meaningful scale – Three stage constr

  5. Slide 5: Black Rock Overview – Corporate

    2. Black Rock Overview – Corporate For personal use only ASX Ticker BKT 4.5 $0.10 Millions Share Price A$0.044 4 3.5 $0.08 Shares on Issue 443.7m Options 64m 3 $0.06 Performance Rights 3.4m 2.5 2 Fully Diluted Market Capitalisation A$22.5m $0.04 1.5 Cash on hand as at 30 June 2018 $1.79m 1 $0.02 Top

  6. Slide 6: Execution – Focused on Delivery

    3. Execution – Focused on Delivery Consistent delivery on promises For personal use only Q1 Q2 Q3 Q4 Complete PFS Balance Sheet Start DFS Validate Design & Leadership & Assumptions Q1 FY18 Q2 FY18 Q3 FY18 Q4 FY18 • Delivered • New Chairman • Metallurgical • Rail confirmed Optimised appointed testing

  7. Slide 7: Execution – Timeline on track for first product in late CY2019

    3. Execution – Timeline on track for first product in late CY2019* For personal use only Focus on construction ready / FY 19 Targets Q1 Q2 2H Study Completion Permitting & Contracts Finance & Construction  ESIA approval  Mining Licence submitted  Mining Licence in place  Resettlement framework 

  8. Slide 8: Overview – Mahenge Graphite Project (Location + PFS metrics)

    4. Overview – Mahenge Graphite Project (Location + PFS* metrics) Crawl, Walk, Run Strategy For personal use only   Three stage construction to deliver a maximum of 250k tonnes per annum of 98.5% graphite concentrate for 31 years. Stages two and three to be funded from free cash flow  Pre-producti

  9. Slide 9: DFS – Pilot Plant Confirms Unique Ore and Product Quality

    5. DFS – Pilot Plant Confirms Unique Ore and Product Quality Purity and size matter For personal use only  Approximately 70% of the primary cleaning circuit for the Ulanzi ore product contained flake sizes over 80 mesh (180 microns)  Primary cleaning delivered a 95% concentrate and a secondary cle

  10. Slide 10: DFS – Study Executing to Plan

    5. DFS – Study Executing to Plan For personal use only DFS remains on budget and on schedule  On track for release in September 2018 Mahenge Graphite Project DFS Schedule  High quality study supported by Jan-18 Feb-18 Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 rigorous test work Engineering

  11. Slide 11: DFS – Simple Reliable Flexible mill

    5. DFS – Simple Reliable Flexible mill For personal use only Three stage cleaning for std product Single Circuit  Flexible – Regular, Premium and Ultra Purity-FP™ Add polishing for premium con Flake Graphite delivered from the same circuit  Straight forward product flow – no mid mill screens Dry S

  12. Slide 12: DFS – Opex Infrastructure Leverage

    5. DFS – Opex Infrastructure Leverage For personal use only Rail haulage demonstrates superior logistics solution  Second bulk sample rail hauled to Port of Dar es Salaam validates logistical viability for Mahenge production  Rail haulage simplifies logistics and materially lowers cost by an estim

  13. Slide 13: Execution – Financing discussions progressing in parallel with DFS completion

    6. Execution – Financing discussions progressing in parallel with DFS completion For personal use only Continued engagement with China  Serious discussions with Chinese engineering, procurement, construction and management (EPCM) firm Potential reduction in CAPEX  A single-source mining infrastruc

  14. Slide 14: Execution – Customer acceptance and product quality

    6. Execution – Customer acceptance and product quality For personal use only Large flake is key point of differentiation  Industry leading large, pure flake graphite distinguishes Mahenge Strong demand for ultra-high grade graphite  Ultra Purity-FP™ Flake Graphite is a superior product with impres

  15. Slide 15: Execution – Permitting process near completion

    6. Execution – Permitting process near completion For personal use only Environmental and Social Impact Assessment • Final submitted in May – expect advice near term • Resettlement Policy Framework – complete and well supported within community DFS provides a number of important documents required f

  16. Slide 16: Graphite Market – More than just batteries!

    7. Graphite Market – More than just batteries! For personal use only Having products that are desirable in diverse markets is a critical risk mitigator 16

  17. Slide 17: Graphite Market – Volume to double over next decade

    7. Graphite Market – Volume to double over next decade For personal use only • Demand doubles over next decade driven by batteries • Increased demand in speciality applications • Expanded demand drives large flake and purity demand • Increased volumes needs to replace mines closing due to environmen

  18. Slide 18: Graphite Market – Supply constraints leading to higher prices

    7. Graphite Market – Supply constraints leading to higher prices For personal use only • Chinese supply constraints (environmental and reserve depletion) • Global shift from China to Africa to drive supply side • Growth in expanded application drives large flake and purity demand 18 18

  19. Slide 19: Why Black Rock?

    8. Why Black Rock? For personal use only Track record of delivering to promise  Demonstrated engagement with government and community derisks project Pilot plant critically de-risks the project  Pilot plant proves that at significant scale the project can deliver premium size high grade concentrat

  20. Slide 20: John de Vries, CEO & Managing Director

    For personal use only John de Vries CEO & Managing Director Black Rock Mining +61 438 356 590 jdv@blackrockmining.com.au BLACK ROCK MINING (ASX: BKT) BLACKROCKMINING.COM.AU 20

Black Rock Mining — Investor Presentation (August 2018) on 6ix