Eldorado Gold Corporation · TSX:ELD
Eldorado Gold — Investor Presentation (September 2012)
45 slides from Eldorado Gold's investor presentation, September 2012
Slide 1: Delivering Sustainable Value – Investor Presentation
Delivering Sustainable Value Investor Presentation September 2012
Slide 2: Forward-looking statements
Certain of the statements made in this Presentation may contain forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of applicable Canadian securities law. These forward-looking statemen
Slide 3: Industry-leading growth profile
Industry-leading growth profile: Commissioning of 6 new mines plus expansion of Kişladağ by 2016 Growing reserves and resources (CAGR: ~ 34%) On track to produce over 1.7 million ounces of gold in 2016 (+160% growth over 5 years) Industry leading cash costs – lowest quartile costs and soli
Slide 4: Strategic focus: low-cost operator of high-quality assets
Eldorado’s strategic focus is on being a low-cost operator of high-quality assets We seek to maximize the potential of our assets, balance sheet and people to deliver sustainable value for all our stakeholders Current asset base provides platform for future growth Skilled High Quality, Managem
Slide 5: Focus on highly prospective areas with established mining cultures
Focus on highly prospective areas with well-established mining cultures: The Mediterranean and Balkans (Turkey, Greece, Romania) Asia (China) South America (Brazil) Legend www.eldoradogold.com 5
Slide 6: Asset base diversified across the mining lifecycle
Asset base is well diversified across the mining lifecycle Stratoni - Silver, Lead, Zinc (Greece) (2005) Pipeline of assets drives Kişladağ (Turkey) (2006) organic growth Jinfeng (China) (2007) Young, high-quality assets Tanjianshan (China) (2007) Production White Mountain (China) (2009) Const
Slide 7: Development projects rank high versus peers
Eldorado’s development projects rank high vs peers: 3 projects in top 10 7 projects in top 60 Ranking of New Projects Scheduled to Commence between 2012-2020 Source: BMO *Projects were ranked for appeal to investors and corporate predators. Equal weight ranking on IRR, payback, years to start-
Slide 8: Focus on quality growth at low cost
Focus on quality growth at low cost: Complete integration of European Goldfields assets Increase gold production to approximately 660,000 oz at US$465/ oz cash operating cost Make construction decisions on Perama Hill, Tocantinzinho and Certej Maintain production costs in lowest quartile
Slide 9: Summarized Financial Results H1 2012
Summarized Financial Results H1 2012 H1 2011 Revenues (millions) $515.7 $471.7 Gold sold (ounces) 283,580 310,694 Average realized gold price ($/ ounce) $1,662 $1,456 Cash operating costs ($/ ounce sold) (1) $465 $403 Total cash cost ($/ ounce sold) (1) $539 $470 Gross profit from gold mining operat
Slide 10: Gold Reserves & Resources growth
Gold Reserves & Resources Gold Reserves and Resources – Ounces per 1,000 shares 40 70.0 Compound average growth rate (CAGR): ~34% Annual reserve per share growth rate: ~13% 35 60.0 30 50.0 Oz (millions) 25 40.0 20 30.0 15 20.0 10 10.0 5 0 0.0 2006 2007 2008 2009 2010 2011 Post 2006 2007 2008 2009 20
Slide 11: Exploration spending and contained ounces
32,500 22,500 $220 30,000 20,000 $200 27,500 $180 25,000 European Goldfields 17,500 Average Cost of Average Cost of Exploration Spending ($mln) ~$220/oz Organic Resource $160 Contained Ounces (000's) 22,500 Acquired Resource 15,000 Contained Ounces (000's) Ounce: ~$11/oz 20,000 Ounce: ~$180/oz $140
Slide 12: Annual Gold Production and Expanding Margins
Annual Gold Production Expanding Margins 1,800 900 Average annual growth rate (AAGR): ~55% 1,600 800 700 1,400 1,200 Oz (000’s) 600 $1,165 (US$/oz) 1,000 $1,110 500 400 800 $800 $658 300 600 $587 $279 $411 200 400 100 200 0 0 2006 2007 2008 2009 2010 2011 2012 E 2006 2007 2008 2009 2010 2011 2012 E
Slide 13: Estimated Gold Production 2012-2016
Estimated Gold Production 2012-2016 2,000,000 2000 Average annual growth rate: 32% 1800 1,750,000 1.7 million oz of gold production 1600 1,500,000 in 2016 Gold Production (oz) 1400 US$ Per Ounce 1,250,000 1200 Cash operating costs (net of by- 1,000,000 1000 product) 800 declining to 750,000 US$3
Slide 14: Gold Production by Country
Gold Production by Country 2012e 2016e Turkey China Greece Turkey China Greece Romania Brazil www.eldoradogold.com 14
Slide 15: Total Cash Costs 2011
Total Cash Costs 2011 Eldorado is one of the $800 lowest-cost primary producers of gold $700 $600 Lowest quartile of cash costs – 2011 $500 operating cash costs (US$/oz) of US$405/ oz and $400 total cash costs of US$472/ oz $300 2012e operating $200 cash costs of US$465/ oz $100 $0 New Gold El
Slide 16: Margin comparison versus peers
75.0% 72.5% 70.0% 67.5% 65.0% 62.5% 60.0% 57.5% 55.0% 52.5% 50.0% Q2 11 Q3 11 Q4 11 Q1 12 Q2 12 Eldorado Yamana Goldcorp Barrick Newmont Kinross Agnico IAMGOLD Average Source: TD Securities www.eldoradogold.com 16
Slide 17: Estimated Development & Expansion Capital
5 Year Estimated Development & Expansion Capital 800 ~US$2 billion being spent on development 700 and expansion projects Capital Requireed (US$ m) over the next 5 years 600 500 ~US$820 million being spent in Greece 400 300 ~US$270 million being spent in Romania 200 100 0 2012 2013 2014 2015 20
Slide 18: Dividend as % of Earnings 2011
Dividend as % of Earnings 2011 30% 25% 20% (% of earnings) 15% 10% 5% 0% Yamana Barrick Eldorado Goldcorp Kinross www.eldoradogold.com 18
Slide 19: Track record working with communities and governments
Political Track record of working with local communities and all levels of government to take projects from exploration to production In-country personnel skilled at permitting and managing relationships in own jurisdictions Technical International teams with proven exploration, operating, dev
Slide 20: 2012 Exploration budget: US$81 million
2012 Exploration budget: US$81 million; 190,000 meters of drilling Romania ($4m) 3 projects 14,000 meters Vancouver (Head Office) ($2.5m) Greece ($13m) 5 projects 48,000 meters Turkey ($15m) China ($28m) 8 projects 17 projects 34,000 meters 82,000 meters Brazil ($16m) 3 projects
Slide 21: Extensive drilling at operating mines and brownfield sites
Extensive drilling at 3 operating mines and associated brownfield sites Jinfeng Revised structural model validated by drilling results from in-fill and step-out drilling Tanjianshan and White Mountain Encouraging results from regional exploration at both sites Tanjianshan www.eldoradogold.
Slide 22: Chalkidiki District and Eastern Thrace, Greece
Chalkidiki District, Greece Highly prospective ground obtained through the acquisition of European Goldfields 9 drills currently drilling targeting: Skouries – gold-copper porphory (in- fill holes to convert inferred resources and deep exploration) Piavitsa – Au/ Ag/ Pb/ Zn replacement dep
Slide 23: Efemçukuru, Tocantinzinho and Certej exploration
Efemçukuru, Turkey Focus on the Kokarpinar Vein and the main Kestani Beleni extensions Work continuing on 7 other early stage projects Tocantinzinho (TZ), Brazil Focus on TZ area of the Tapajos district, plus new generative efforts in other prospective areas of Brazil Certej, Romania D
Slide 24: Upcoming milestones
Announce long-term corporate plan for Greek assets April Receipt of PEIA - Perama Hill February Complete construction refurbishment – Olympias July Commission plant for tailings treatments – Olympias July Drilling results - Piavitsa, Efemçukuru, July Jinfeng and regional programs
Slide 25: Background Information
Background Information www.eldoradogold.com 25
Slide 26: Five cornerstone mines
Five cornerstone mines: Kişladağ Efemçukuru Jinfeng Tanjianshan White Mountain www.eldoradogold.com 26
Slide 27: Kişladağ, Western Turkey
OVERVIEW Location Uşak Province, Western Turkey Deposit Gold porphyry Ownership 100% Eldorado Open pit Type Heap leach gold mine Expected Life of Mine 15-20 years Recovery 65% Overview Strip Ratio 1.3:1 Largest gold mine in Turkey Discovered by Eldorado; commercial production began in July 2006
Slide 28: Kişladağ expansion highlights
Highlights Current production rate 12.5 million tonnes / year (crushing, screening, stacking) Expanded production rate 25.0 million tonnes / year (crushing, screening, stacking) Expanded production rate, average 475,000 ounces / year LOM strip ratio 1.4:1 ROM ore treatment , average 8MT / year Initi
Slide 29: Kişladağ production and cash operating cost
600 $600 500 $500 400 $400 x 1,000 oz US$/oz 300 $300 200 $200 100 $100 0 $0 2012 2013 2014 2015 2016 Cash Operating Cost (US$/oz) www.eldoradogold.com 29
Slide 30: Efemçukuru, Western Turkey
OVERVIEW Location Izmir Province, Western Turkey Deposit High grade epithermal gold vein Ownership 100% Eldorado Underground gold mine Type Flotation and Carbon in Leach Expected Life of Mine 12 years Recovery 87% Overview RESERVES AND RESOURCES (at Dec 31, 2011) Discovered by Eldorado; commercial
Slide 31: Jinfeng, China
OVERVIEW Location Guizhou Province, China Deposit Carlin type 82% Eldorado Ownership 18% Guizhou Lannigou Gold Mine Ltd Open pit and underground gold mine Type Biox and Carbon in Leach Expected Life of Mine 13 years Recovery 85% Overview Acquired by Eldorado from Sino Gold in 2009; commercial RESE
Slide 32: Tanjianshan, China
OVERVIEW Location Qinghai Province, China Deposit Orogenic 90% Eldorado 5% First Institute of Geology and Ownership Mineral Exploration of Qinghai Province 5% Dachaidan Gold Mine Open pit gold mine Type Float roast Carbon in Leach Expected Life of Mine 5 years Recovery 81% Overview Strip Ratio Acq
Slide 33: White Mountain, China
OVERVIEW Location Jilin Province, China Deposit Orogenic 95% Eldorado Ownership 5% Jilin Tonghua Institute of Geology and Minerals Exploration and Development Underground gold mine Type Carbon in Leach plant Expected Life of 9 years Mine Overview Recovery 80% Acquired by Eldorado from Sino Gold in
Slide 34: Vila Nova iron ore, Brazil
OVERVIEW Location Amapa State, Brazil Ownership 100% Eldorado Type Open pit iron ore mine Expected Life of Mine 9 years RESERVES AND RESOURCES (at Dec 31, 2011) Overview Commercial production began in 2011 Proven + Probable Reserves 8.9 M tonnes (60.9% Fe) 2012 Objectives Measured + Indicated Reso
Slide 35: Stratoni, Greece
OVERVIEW Location Chalkidiki Peninsula, Northern Greece Deposit Replacement mixed sulphide 95% Eldorado Ownership 5% Aktor SA Underground drift and fill Type Multi-stage flotation Expected Life of Mine 5 years Overview RESERVES AND RESOURCES (Source: European Goldfields) Acquired from European Gol
Slide 36: Six key development projects
Six key development projects: Eastern Dragon Tocantinzinho Perama Hill Olympias Skouries Certej www.eldoradogold.com 36
Slide 37: Eastern Dragon, China
OVERVIEW Location Heilongjiang Province, China Deposit High-grade, epithermal, gold-silver vein 95% Eldorado Ownership 5% County (Daxinglanling Yihua Development Company Ltd) Open pit and underground gold mine, Type CIL plant under construction Expected Life of Mine 7 years Expected Recovery 90% Est
Slide 38: Tocantinzinho, Brazil
OVERVIEW Tapajos district, Para State, Location central Brazil Shallow, intrusion-hosted, Deposit non-refractory gold deposit Ownership 100% Eldorado Type Open pit gold mine Expected Life of Mine 11 years Estimated Development Capital US$383 million (2012 – 2016) Overview Production Expected Q1 2016
Slide 39: Perama Hill, Greece
OVERVIEW Eastern Thrace, northern Location Greece Epithermal gold-silver vein Deposit deposit Ownership 100% Eldorado Type Open pit gold mine Expected Life of Mine 8 years 90% (Gold) Expected Recovery 60% (Silver) Estimated Development Capital US$189 million (2012 – 2014) Overview Production Expecte
Slide 40: Olympias, Greece
OVERVIEW Chalkidiki Peninsula, Location Northern Greece Polymetallic gold, silver, Deposit lead and zinc 95% Eldorado Ownership 5% Aktor SA Underground mine Type (previously mined using underground drift and fill) Estimated Development Capital US$207 million (2012-2016) Overview Production Expected
Slide 41: Skouries, Greece
OVERVIEW Chalkidiki Peninsula, Location Northern Greece Deposit Gold-copper porphyry 95% Eldorado Ownership 5% Aktor SA Type Open pit and underground Strip Ratio (open pit) 0.75 : 1 Estimated Development US$415 million Capital (2012-2016) Overview Production Expected 2015 Environmental Impact Stud
Slide 42: Certej, Romania
OVERVIEW “Golden Quadrilateral” area Location of the Apuseni Mountains, Western Romania Epithermal gold-silver Deposit deposit Ownership 80% Eldorado Open pit Type (Previously mined via shallow open pit) Expected Life of Mine 12 years Overview Environmental Permit approved by the Regional Departme
Slide 43: Proven & Probable, Measured & Indicated, Inferred resources
Proven & Probable Measured & Indicated Inferred Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces (x1000) (Au g/t) (x1000) (x1000) (Au g/t) (x1000) (x1000) (Au g/t) (x1000) Kisladag 459,870 0.71 10,516 579,860 0.65 12,055 380,760 0.40 4,921 Efemcukuru 5,023 9.13 1,475 5,426 9.57 1,670 2,52
Slide 44: Consensus Metal Price Forecasts (April 2012)
Consensus Metal Price Forecasts (April 2012) Metal Unit 2012 2013 2014 2015 2016 2017 Long-term Gold US$/ oz 1,772 1,816 1,595 1,476 1,346 1,292 1,250 Silver US$/ oz 35.30 33.13 28.21 25.88 25.62 21.75 21.75 Copper US$/ lb 3.83 4.01 3.66 3.38 2.84 2.63 2.59 Lead US$/ t 2,226 2,380 2,446 2,446 2,182
Slide 45: Thank You – Investor Relations
Thank You TSX: ELD NYSE: EGO ASX: EAU Total shares outstanding (as at June 30, 2012): 712.9 M Investor Relations: Nancy Woo (604) 601-6650 ⋅ nancyw@eldoradogold.com www.eldoradogold.com 45
Eldorado Gold — Investor Presentation (September 2012) on 6ix