Noront Resources Ltd

Noront Resources — Wyloo (Eagle's Nest Project) — Investor Presentation (July 2025)

14 slides from Noront Resources's investor presentation, July 2025

  1. Slide 1: Eagle's Nest Project Overview

    Eagle’s Nest Project Overview

  2. Slide 2: Truth and Reconciliation: Land Acknowledgement

    Truth and Reconciliation Land Acknowledgement We acknowledge that our Toronto office is located on the territory of many nations including the Mississaugas of the Credit, the Anishnabeg, the Chippewa, the Haudenosaunee and the Wendat peoples and is now home to many diverse First Nations, Inuit and M

  3. Slide 3: Wyloo Ring of Fire

    Wyloo Ring of Fire EAGLE’S NEST Developing world-class operations vital for the clean energy transition THUNDER BAY ▪ People: Genuine partnership + collaboration with local communities to create prosperity and opportunity for generations to come ▪ Planet: Industry-leading practices and technologies

  4. Slide 4: Eagle's Nest Project

    Eagle’s Nest Project WEBEQUIE WEBEQUIE SUPPLY ROAD EAGLE’S NORTHERN ROAD NEST Contributing to Canada’s LINK MARTEN FALLS Critical Minerals Supply Ontario MARTEN FALLS ACCESS ROAD Underground Mine Quebec Eagle’s Nest Nakina • Limited footprint • Underground tailings storage ONTARIO Thunder Bay Critic

  5. Slide 5: With Indigenous-led Projects

    With Indigenous-led Projects The current Project is only comprised of the mine site, reducing the overall Project footprint Then (2011) Now (2025) (figures in km2) Eagle’s Nest Mine Site ~1 ~1 Regional Infrastructure Corridor 75 Advanced by (All season road access) First Nations Proponents 98% Aerod

  6. Slide 6: Sustainability at the heart of our design

    Sustainability at the heart of our design Small 1km2 Footprint: ▪ Majority of mine design on uplands (not Twin portals Concentrator peatlands), mainly over existing Esker Camp Underground tailings storage Minimal Surface Disruption ▪ NO → surface tailings, surface quarry, Conveyor Orebody open pits,

  7. Slide 7: Transparency in Action

    Transparency in Action Ensuring Indigenous Nations are meaningfully involved in planning and implementation Glass Box • establishing a culture of radical transparency • ensuring open, near real-time access to “whole of project” information, clear reporting and insight into management of the Project

  8. Slide 8: Comprehensive Indigenous Participation

    Comprehensive Indigenous Participation Partnering with local Indigenous communities and working alongside contractors, suppliers and surrounding communities Create and sustain Maximizing contract Indigenous training awards to Indigenous- and employment led businesses opportunities Signed MOUs Webequ

  9. Slide 9: Our Path to Production

    Our Path to Production Opportunity to supply Ontario and Canada with high-grade nickel sulphide mined sustainably in partnership with local communities Finalizing alternative regulatory process Working with Federal and Provincial governments on regulatory reviews Continuing environmental studies Our

  10. Slide 10: Aim to Create One of the Smallest Footprint Mines in the World

    Aim to Create One of the Smallest Footprint Mines in the World 1 km2 9 km2 12 km2 22 km2 Eagle’s Nest Project Lac des Iles Mine, Dome Mine, Greenstone Gold Ring of Fire, ON Thunder Bay, ON Timmins, ON Mine 10 Geraldton, ON

  11. Slide 11: Driving the Future with Domestic Nickel

    Driving the Future with Domestic Nickel 50% With domestically-sourced and processed material, we are planning to develop up to 50 kt of nickel in sulphate and pCAM, meeting 50% of the demand for Ontario battery facilities that have been announced to date. Wyloo Capacity Eagle’s Nest concentrate Toge

  12. Slide 12: Miigwech

    Miigwech www.wylooeaglesnest.com

  13. Slide 13: Wyloo is an organization driven by a set of Values

    Wyloo is an organization driven by a set of Values Kaa’kichiinetamakin Family Stretch Targets Safety Generating Ideas Peshikoo tipechikewin Niikaan oh’nachikewin A’yakwaamisiwin Kaa’onchi’kaatekin kaakakwe tebinikaatek ohnetamowinan Empowerment Integrity Courage & Humility Mashka’wikaaba’wi’hiwewin

  14. Slide 14: Our Team - Canada

    Our Team - Canada Our team in Canada Stephen Crozier Vice President, Zahir Jina Director, Clyde Moonias Coordinator, is supported by a Sustainability Environment Community Relations group of dedicated Sustainability Alina Shams Ryan Tuomi members across Director, Government Manager, Community severa

Wyloo (Eagle's Nest Project) — Investor Presentation (July 2025) on 6ix