North American Construction Group Ltd. · TSX:NOA

North American Construction — Investor Presentation (November 2026)

14 slides from North American Construction's investor presentation, November 2026

  1. Slide 1: Investor Presentation

    Investor Presentation TSX – NYSE: NOA November 2026

  2. Slide 2: Forward-Looking Statements & Non-GAAP Financial Measures

    FORWARD-LOOKING STATEMENTS & NON-GAAP FINANCIAL MEASURES This presentation contains forward-looking information which reflects the current plans and This presentation presents certain non-GAAP financial measures because management expectations of North American Construction Group Ltd. (the “Company”

  3. Slide 3: Global, Diversified Heavy Mining & Civil Infrastructure Contractor

    GLOBAL, DIVERSIFIED HEAVY MINING & CIVIL INFRASTRUCTURE CONTRACTOR Built to Move. Ready to Build. Since 1953. Global Leader in Mining Services Full Mine Site Operations • Planning, equipment maintenance, pre-strip • Post mine reclamation, dewatering and waste & ore handling Equipment & Operators • O

  4. Slide 4: Diversified Global Operating Platform

    DIVERSIFIED GLOBAL OPERATING PLATFORM Exposure Across Multiple Commodities, Geographies and Contract Types Mining services, 80% Australia, 75% Time & materials based, 80%‡ Metallurgical Thermal coal, 35% coal, 30% Unit-rate, 10% Contract Vertical Geography Commodity type Rentals, 5% Lithium, 5% Fixe

  5. Slide 5: Diversified, Strong Operational Growth

    DIVERSIFIED, STRONG OPERATIONAL GROWTH Valuation Multiple Lags Fundamentals and Peers – Attractive Entry Point 10x $1,800 2018 20% 9x Major revenue diversification: $1,600 2018-2025 49% stake in Nuna Group 1 (northern Canada) 8x Combined revenue CAGR 1 $1,400 adjusted EBITDA CAGR 2020 7x $1,200 DGI

  6. Slide 6: Growth Drivers for 2026 and Beyond

    GROWTH DRIVERS FOR 2026 AND BEYOND Strategic Building Blocks for Our Success Scaling Into a Securing Expanding Tier 1 Contractor Infrastructure Awards Mining Services Platform in Australia in Northern Canada in Canada and U.S. 23 Global Operating Sites2 NORTH AMERICAN CONSTRUCTION GROUP 6

  7. Slide 7: Australia Platform Driving Growth

    AUSTRALIA PLATFORM DRIVING GROWTH Scale and diversification create a larger platform for sustainable growth 36% Revenue CAGR1 2024 Q1 -2026 Q3 • New leadership adds deep Australian and international mining experience $2.6B • Expanded exposure to copper, gold, lithium, iron ore and nickel strengthens

  8. Slide 8: Positioned to Win in Northern Canada

    POSITIONED TO WIN IN NORTHERN CANADA Q3 awards continue Nuna momentum, while major infrastructure pursuits advance Q3 JOINT VENTURE CONTRACT AWARDS $4.6B¹ • Ontario follow-on scope extends site presence from Q4 2026 well Pipeline supporting into Q2 2027 after successful delivery of earlier work. Nun

  9. Slide 9: Oil Sands Platform for Resilient Returns

    OIL SANDS PLATFORM FOR RESILIENT RETURNS Strong demand and reliable fleet availability support improved operating margins GROWING PRESENCE IN HEAVY EQUIPMENT MAINTENANCE AND SERVICES MARKET Continued growth with a recent $135M five-year contract 30% creates additional near-term equipment-service opp

  10. Slide 10: New CEO: Disciplined Execution, Valuable Growth

    NEW CEO: DISCIPLINED EXECUTION, VALUABLE GROWTH Brad Stronger cash generation to support deleveraging and total shareholder returns Rogers Execution Priorities: 01 Accelerate growth in North America given existing opportunities Incoming President, Chief Executive Officer Seize tailwinds to advance C

  11. Slide 11: 2026 Financial Outlook & Guidance

    2026 FINANCIAL OUTLOOK & GUIDANCE Outlook Confidence • Contractual backlog1 as at September 30, 2026 of $3.2 billion underpinning guidance ranges • Strategic and prudent investments in equipment fleets provide confidence for FY 2026 Guidance: $1.7 – $1.8B reliable performance and operational excelle

  12. Slide 12: Supplemental Information

    SUPPLEMENTAL INFORMATION NORTH AMERICAN CONSTRUCTION GROUP 12

  13. Slide 13: Heavy Equipment Fleet

    HEAVY EQUIPMENT FLEET Category 1 Australia Canada Total +200-ton haul trucks 90 95 185 Large capacity loading units 11 14 25 Large dozers and graders 127 45 172 Large capacity fleet 228 154 382 Haul trucks and articulated trucks 131 151 282 Loading units and other loaders 129 207 336 Dozers and grad

  14. Slide 14: Long-Term Contracts

    LONG-TERM CONTRACTS Type Contract1 Backlog2 Queensland thermal Operations Full mine support $1.1B 2079 coal mine services Queensland metallurgical Operations Maintained support $475M 2040 coal mine rental Queensland metallurgical Operations Maintained support $350M 2037 coal mine rental Queensland m

North American Construction Group — Investor Presentation (November 2026) on 6ix