  1. Slide 1: Completion of Refinery Expansion Project

    Essar Oil Limited Completion of Refinery Expansion Project

  2. Slide 2: Vadinar Refinery

    4 nw Vadinar Refinery OIL & GAS . CR ns... a ei

  3. Slide 3: Vadinar Refinery Snapshot

    Vadinar Refinery Snapshot  Commercial production of Vadinar Refinery started in May, 2008 with capacity of 10.5 mmtpa, complexity of 6.1 and investment of Rs 13000 crore.  Strategically located at west coast of India, nearest point for sourcing of crude from Middle East & on major maritime route f

  4. Slide 4: Completion of Refinery Expansion Project

    Completion of Refinery Expansion Project Essar Oil declare completion of Refinery Expansion Project with commissioning one of world largest Delayed Coker Unit 3

  5. Slide 5: Refinery Expansion Project: Highlights

    Refinery Expansion Project : Highlights  Capacity & Complexity of Refinery almost doubled from 10.5 mmtpa to 18 mmtpa and 6.1 to 11.8 respectively in less than 4 years with project cost of Rs 8300 crore.  Vadinar Refinery become second largest single location refinery in India and one of most comp

  6. Slide 6: Refinery Capacity Growth

    Refinery Capacity Growth 405,000 bbl/day capacity by Oct, 2012 4,50,000 405000 20 mmtpa 4,00,000 18 mmtpa 30,000 CAGR 3,50,000 16.5% 75,000 75,000 barrels per day 14 mmtpa 3,00,000 2,50,000 10.5 mmtpa 10.5 mmtpa 2,00,000 1,50,000 3,00,000 3,00,000 3,00,000 2,20,000 2,20,000 1,00,000 50,000 0 March 2

  7. Slide 7: Refinery Expansion Project: Major Units & Licensors

    Refinery Expansion Project : Major Units & Licensors Name of unit Capacity (in MMTPA) Licensor ISOM (Isomerization Unit) 0.7 ARU (Amine Regeneration Unit) 8 HMU (Hydrogen Manufacturing Unit) 130,000 Nm3 / hr H2 SWS (Sour Water Stripper) 1.98 DHDT(Dieseld Hydrotreater) 4 VGOHT (Vacuum Gasoil Hydrotre

  8. Slide 8: Resources

    Resources  Essar Projects (I) Limited (EPIL) executed the entire refinery expansion project on turnkey basis.  More than 4,71,000 cubic meters of concreting.  Around 42000 metric tones of Steel used to built the structure to erect various refinery expansion units.  2000 km plus pipelines were la

  9. Slide 9: Crude Mix & Sourcing Strategy

    Crude Mix & Sourcing Strategy Crude Mix : Existing Refinery  Overall Crude basket to become significantly heavier due to Coker configuration post Ultra Heavy expansion. 20% Light 25%  Ultra heavy crude to increase from 20% currently to 60% of overall crude basket. Heavy / Medium 55%  Avg API of c

  10. Slide 10: Yield to shift towards high grade products

    Yield to shift towards high grade products  Refinery Expansion Project to convert low margin Product Mix : Existing Refinery fuel oil into high value added products like Gasoil, Fuel Loss 6% Gasoline & VGO. Heavy Light 26% 25%  Refinery now capable to operate on virtually zero Fuel Oil from existi

  11. Slide 11: Refinery Expansion with increased complexity

    Refinery Expansion with increased complexity …..………one of the most complex refineries worldwide 16 14 12.8 11.8 12 10 8 6.1 6 4 2 0 Source : Research & Market Report 10

  12. Slide 12: Low Cost Refinery Expansion

    Low Cost Refinery Expansion Low cost expansion 3,000 Cost (USD/complexity/bbl) 2,500 2,435 2,417 2,313 2,000 1,500 1,050 1,046 1,000 891 500 0 EOL Refinery EOL post Central India PSU North India PSU East India PSU Private Refinery Expansion Optimization Refinery Refinery Refinery 11

  13. Slide 13: Health & Safety

    Health & Safety  Achieved 1456 Lost Time Injury free days for Employees and 179 Lost Time Injury free days for Contractors and 1041 major fire free days.  Essar Refinery Integrated Management System(ERIMS) conforms to the requirement of ISO 9001:2008, ISO 14001:2004 & OHSAS 18001:2007 -within firs

  14. Slide 14: Environment Protection & Control Measures

    Environment Protection & Control Measures  Sulhpur Recovery Unit (SRU) for H2S control  Flue Gas Desulphurization (FGD) in Fluidized Catalytic Cracker  Effluent treatment plant for 100% recycled and zero discharge  Hazardous & Non-hazardous waste storage facilities  Low Nox burner in all heater

  15. Slide 15: Refinery Expansion Project Units & Facilities

    Refinery Expansion Project Units & Facilities 14

  16. Slide 16: ISOM Unit (Isomerization Unit)

    ISOM Unit (Isomerization Unit) 15

  17. Slide 17: Amine Regeneration Units (ARU)

    Amine Regeneration Units (ARU) 16

  18. Slide 18: Hydrogen Manufacturing Unit

    Hydrogen Manufacturing Unit 17

  19. Slide 19: Sour Water Stripper

    Sour Water Stripper 18

  20. Slide 20: Diesel Hydrotreater (DHDT)

    Diesel Hydrotreater (DHDT) 19

  21. Slide 21: VGO HT (Hydrotreater Unit)

    VGO HT (Hydrotreater Unit) 20

  22. Slide 22: Sulphur Recovery Unit

    -s” Sulphur Recovery Unit ariies 21

  23. Slide 23: Effluent Treatment Plant

    Effluent Treatment Plant 22 22

  24. Slide 24: Demineralisation Plant, Caustic Pumps & Tanks

    Demineralisation Plant, Caustic Pumps & Tanks Demineralisation Plant Caustic System Pumps & Tanks 23

  25. Slide 25: Desal Plant, NG Station, Tanks Farm Area & OSBL Racks

    Desal Plant, NG Station, Tanks Farm Area & OSBL Racks Tank Farm Area OSBL Pipe Rack Natural Gas Station Desalination Plant Natural Gas Station 24

  26. Slide 26: Air Generations Unit & Raw Water Treatment Plant

    Air Generations Unit & Raw Water Treatment Plant Air Generation Unit Raw Water Treatment Plant 25

  27. Slide 27: Flare Drum and Racks & Cooling Towers

    Flare Drum and Racks & Cooling Towers Flare Drum Area Flare Racks Cooling Tower – I Cooling Tower - II 26

  28. Slide 28: Power Generation Facilities

    Power Generation Facilities Vadinar – Liquid Fuel Vadinar - Gas based Power Plant Vadinar – Coal Based power plant • Capacity: 120 MW (77MW power • Capacity: 380 MW (220MW power & • Capacity: 510 MW (325MW power & & 230 T/H steam) 630 T/H steam) 900 T/H steam) • Fuel: Refinery residue / Liquid Fuel

  29. Slide 29: Port & Terminal Facilities

    Port & Terminal Facilities Ports & Terminals (owned by Essar Port Ltd)  1 SPM, Draft – 32 m crude; intake capacity: 27 mmtpa  2 Jetties (1+1) for product offtake : 14 mmtpa  Pipelines & other supporting infrastructure facilities completed 28

  30. Slide 30: Storage & Evacuation Facilities

    Storage & Evacuation Facilities Tankages, Rail & Road Gantries (Owned by EPL)  136 tankages ( 106 + 30) for crude oils, products and Intermediates with capacity of ~ 2.94 Million KL (1.96 Mn KL earlier + 0.98 Mn KL expansion);  Fully automated Loading Facilities; 3-White Oil truck Gantries, each 8

  31. Slide 31: DCU (Delayed Coker Unit)

    ESSAR DCU (Delayed Coker Unit)

  32. Slide 32: Thank You

    Thank Yow 4 ESSAR’ OIL & GAS