Broken Hill Gold Ltd. · ASX:BH6
Broken Hill Gold — Pacgold — Investor Presentation (May 2021)
21 slides from Broken Hill Gold's investor presentation, May 2021

Slide 1: Investor Presentation May 2021
INVESTOR PRESENTATION MAY 2021 INVESTOR PRESENTATION | MAY 2021 | Page 1

Slide 2: Cautionary Statement
Cautionary Statement This presentation has been prepared by Pacgold deciding if an investment is appropriate. All securities This presentation does not purport to contain all the Competent Persons Limited (PGO or the Company). This document involve risks which include (among others) the risk of info

Slide 3: Unlocking an Entire Gold Corridor
Horn Island (0.5Moz) Unlocking an Entire Gold Corridor LEGEND ALICE RIVER GOLD PROJECT ALICE RIVER GOLD PROJECT Compelling new, high-grade gold targets along 30km corridor centred on historical producing goldfield Palmer River (2Moz) Drilling to commence shortly after IPO Red Dome/Mungana (2Moz) Pot

Slide 4: Investment Highlights
Investment Highlights Pacgold Limited (ASX:PGO) First mover in an overlooked prospective gold terrain – strong ground position (inc. granted mining leases) in an underexplored region, AngloGold Ashanti now securing tenure close by Untapped upside for large gold discoveries through leveraging histori

Slide 5: Capital Structure
Capital Structure CAPITAL STRUCTURE PROPOSED IPO METRICS (at max) FREE FLOAT AND ESCROW Existing shares on issue 25,366,250 Offer price (per new Share) $0.25 Anticipated free float (at max) ~66% IPO (at max $6M raising) 24,000,000 IPO size $4M - $6M Majority of non-tradeable shares Total post IPO (a

Slide 6: Experienced Board and Management
Experienced Board and Management DISCOVERY | PROJECT FINANCING | MINE DEVELOPMENT Cathy Moises Non-Exec Chair Tony Schreck Managing Director Geologist with over 30 years in resource finance industry including Geologist with over 30 years of precious and base metal exploration, senior roles for sever

Slide 7: Alice River Gold Project Overview
OPERATING AIRSTRIP Alice River Gold Project Overview FRESH WATER DAM ACQUISITION & MINING HISTORY CAMP AQ OPEN PIT Limited exploration over past 20 years (held by private company / prospector) – Pacgold acquired the project from a deceased estate in Dec 2020 (100%) 30km of prospective target structu

Slide 8: Geological Setting
Geological Setting High-Grade Epithermal Gold System BONANZA GOLD GRADES & HISTORY OF PROFITABLE MINES Epithermal Gold in Queensland Majority of Qld’s current large operating gold mines are epithermal-style gold systems Potential for bonanza grades & long-life gold mines Many Qld examples inc. Pajin

Slide 9: Large-Scale Epithermal Gold System
Large-Scale Epithermal Gold System OVERLOOKED BY MODERN EXPLORATION Gold intersected in regional scout drilling along a 30km-long shear zone Pacgold’s initial focus on three priority targets covering 7km of the gold bearing shear zone: Central Target: Strong geophysical targets along strike from ope

Slide 10: IP Geophysics Reprocessing – Giant Step Forward
IP Geophysics Reprocessing – Giant Step Forward RESISTIVITY IP LOW HIGHLIGHTS LARGE-SCALE SYSTEM/STRUCTURE Pacgold’s reprocessing of Historical data collected by 1989 IP data with modern Cyprus in 1989 techniques was a critical Interpretation of IP data in IRGS step forward for the project has evolv

Slide 11: Central Target
Central Target IP CHARGEABILITY GEOPHYSICAL TARGET Strong IP geophysical target (chargeability high) immediately along strike High-grade mineralisation open down-plunge (heading towards IP target) from the gold system (interpreted as a main ‘feeder up-flow’ gold zone) 14m @ 1.2g/t Au 14m @ 2.2g/t Au

Slide 12: Central Target
Central Target IP CHARGEABILITY GEOPHYSICAL TARGET Drill hole adjacent to IP chargeability target intersected zones of gold mineralisation associated with strong sulphides (5-10%) Potential to represent the main ‘up-flow gold feeder zone’ High-order bedrock Au-As-Sb geochemistry associated with IP g

Slide 13: Central Target
Central Target TARGET HIGH-GRADE AU DOWN PLUNGE Pacgold’s forward programme for the Central Target IP geophysics to create 3D model 2,000m RC + 200m DD drilling first (survey to 350m depth) phase 14m @ 1.2g/t Au 14m @ 2.2g/t Au 16m @ 9.6g/t Au 12m @ 28g/t Au 20m @4.0g/t Au 17m @3.3g/t Au INVESTO

Slide 14: Southern Target
Southern Target UNTESTED BROAD GEOCHEMISTRY & GEOPHYSICAL ANOMALIES Largest bedrock Au-As (Sb) anomaly on project (1.8km x 500m wide) Widest zone of alteration / structures (IP resistivity low) Not effectively tested by previous shallow drilling Untested IP geophysical anomalies adjacent to

Slide 15: Southern Target
Southern Target POTENTIALLY WIDE UNTESTED STRUCTURES Pacgold’s forward programme for the Southern Target IP geophysics to create 3D model (survey to 350m depth) 1,500m RC drilling first phase Section 1 • Gold zones dip to the west 18m @ 4.6g/t Au • Wide mineralised structure 50m true width Secti

Slide 16: Northern Target
Northern Target 2KM LONG INTERPRETED VEIN SYSTEM Interpreted 2km-long vein system concealed by shallow sand cover, which has not previously recognised or tested Previous surface geochemical sampling (BLEG soils) ineffective due to extensive sand cover masking basement host rocks IP geophysics (2km-l

Slide 17: Project Pipeline - Regional Structures
Project Pipeline - Regional Structures EXCELLENT REGIONAL PROSPECTIVITY Vast majority of 30km-long target structure not effectively tested due to the extensive shallow sand cover 6m @ 1.1g/t Au 6m @ 2.7g/t Au Regional BLEG soils (1990 and 1996) identified outcropping / sub-cropping gold 10m @ 1.7g/t

Slide 18: Attractive Deal Structure
Attractive Deal Structure ALICE RIVER GOLD PROJECT - ASSET ACQUISITION Gold project acquired from a deceased estate (Tinpitch Pty Ltd) Pacgold owns the project 100% (five granted EPM’s and eight granted Mining Leases) following replacement of $647,000 environmental bond in Dec 2020 Deferred success

Slide 19: Recognising Opportunities Early
Recognising Opportunities Early EXCEPTIONAL TARGETS TO BE DRILLED IN FIRST PHASE Large-scale high-grade gold targets generated using latest Intrusion-Related Gold Systems (IRGS) models – First Mover Opportunity (AngloGold Ashanti pegging ground 30km to the north) 30km of prospective shear zone virtu

Slide 20: Indicative Budget and Timetable
Indicative Budget and Timetable ALICE RIVER GOLD PROJECT Minimum Maximum Use Of Funds Subscription Subscription (A$’000) (A$’000) Year 1 and 2 Drilling 1,754 3,431 Tenement Fees 440 440 Geophysics 130 300 Mapping and Geochemistry 26 26 Metallurgical and Mining Studies 40 50 Stakeholder and Environme

Slide 21: Contact
CONTACT Tony Schreck Managing Director e tschreck@pacgold.com.au p (+61) 419 683 196 INVESTOR PRESENTATION | MAY 2021 | Page 21
Source: Internet Archive copy of pacgold.com.au
More decks from Broken Hill Gold Ltd.
Pacgold — Noosa Mining Investor Conference (July 2026)17 slides · July 2026
Pacgold — Merger or Acquisition (June 2026)10 slides · June 2026
Pacgold — RIU Sydney Resources Roundup (May 2026)18 slides · May 2026
Pacgold — Bell Potter Unearthed 202615 slides · February 2026
Pacgold — RIU Explorers Conference (February 2026)14 slides · February 2026
Pacgold — Noosa Mining Unearthed 202113 slides · Nov 10, 2021