    Forward-Looking & Cautionary Statements This presentation contains forward-looking statements and forward-looking information (collectively, "forward-looking statements") within the meaning of applicable Canadian and US securities legislation. All statements, other than statements of historical fact

  3. Slide 3: Livengood: A Large-Scale Deposit in Alaska

    Livengood: A Large-Scale Deposit in Alaska Prudhoe Bay • 100% Control of Livengood Gold Project • +10Moz resource among largest discoveries in past 20 years • Expanding resource and new district-wide discovery potential • Located near Fairbanks, Alaska • Pro-development area with long mining history

  4. Slide 4: Located in World-Class Tintina Gold Belt

    Located in World-Class Tintina Gold Belt Livengood exploration camp (former Alaska Pipeline Camp) • Fort Knox Mine (Kinross Gold): In production for 16 years; 2010 Production of 349,729 oz Au (at $550/oz cost) 2010 P&P Reserves: 253 Mt @ 0.44 g/t for 3.58 Moz • Pogo Mine (Sumitomo affiliates): In pr

  5. Slide 5: Livengood Project Overview

    Livengood Project Overview Livengood Property Package Resource Gold Tonnes Grade Million (in Yellow) Classification Cutoff (millions) (g/t) Ounces • Current +10Moz gold resource (g/t) Gold covers 2.5 km2 of land package Measured & 0.30 777 0.61 15.3 totaling 145 km2 Indicated Inferred 0.30 282 0.54

  6. Slide 6: Pre-Feasibility Engineering

    Pre-Feasibility Engineering Key Work Programs Underway/Nearing Completion • Baseline environmental studies by third-party consultants and in-house personnel • Metallurgical work programs including column leaching, gravity concentration and flotation-CIL testing • Process Design and Trade-Off Studies

  7. Slide 7: Livengood 3-D Surface Mine Model

    Livengood 3-D Surface Mine Model Greater than 0.5 g/t gold resource Outline of surface mine: 648 Mt at 0.65 g/t for 13.63 Moz gold contained Grade between 0.3 - 0.5 g/t gold resource 0.3 km 2 km • Model illustrates thickness, size and distribution of gold at various cutoff grades • Deposit configura

  8. Slide 8: Livengood Conceptual Mining and Processing

    Livengood Conceptual Mining and Processing Mining: • Surface mine with potential ore production of greater than 75,000 tpd • Low strip ratio of 1.1:1 Processing (review ongoing): • Upper most oxidized units (surface to 150 m depth) sent to milling facility • Oxide mill recoveries average 90% • Sulfi

  9. Slide 9: Conceptual Mine Development Timeline

    Conceptual Mine Development Timeline 2011 2012 2013 2014 2015 2016 2017 Optimization Prefeasibility Construction Production & Permitting PFS Milestones Key State Permits Construction Production Resource Update and Mine Reclamation Permit Main Milling/Process Facilities Production begins 2016 updated

  10. Slide 10: Continued Livengood Resource Expansion

    Continued Livengood Resource Expansion Deposit Remains Open Laterally and at Depth • 2010-11 drilling continues to expand higher grade areas in the Core and Sunshine zones (eg. 34m @ 8.07 g/t Au; 112m @ 2.5 g/t Au and 95m @ 1.9 g/t Au) • Major resource expansion to the southwest of the deposit and a

  11. Slide 11: FY2011 Drilling Programs and Budget

    FY2011 Drilling Programs and Budget 1) Resource Growth Drill Program: $7.5 Million, 28,000-metre deposit focused infill/resource expansion drill program to test lateral and depth expansion potential 2) Geotechnical Drill Program: $3.9 Million, 10,800-metre to determine ideal locations for site facil

  12. Slide 12: Share Structure

    Share Structure TSX: ITH - NYSE-A: THM - Frankfurt: IW9 (as of June 30, 2011) Issued & Outstanding Shares 86,648,919 Shares Fully Diluted 91,248,919 Cash C$105 Million Market Capitalization C$630 Million Major Shareholders Shares Held % Tocqueville Asset Management LP 11,447,387 13.2 AngloGold Ashan

  13. Slide 13: Market Valuation Comparison

    Market Valuation Comparison Per ounce industry valuation commonly reflects project advancement toward production and de-risking of the production plan Junior Gold Explorers and Developers AMC/oz of M+I+I Resources ($US) $400 : Prefeasibility Stage Feasibility & Permitting Construction & $350 Small S

  14. Slide 14: 2-Year Market Performance (TSX)

    2-Year Market Performance (TSX) Close of Financing ITH Added to S&P TSX Global Gold Index Mill/Heap PEA Heap Only PEA Resource Update Spin-off of exploration Resource Updates assets into Corvus Gold Resource Update 14

  15. Slide 15: Investment Highlights

    Investment Highlights Experienced management and operation teams moving the project forward through feasibility and permitting. Upcoming PEA and PFS further de-risk the Livengood project and will demonstrate the underlying value of ITH. 100% control of one of the largest new gold discoveries made in

  16. Slide 16: Management Team

    Management Team Track Record of Exploration, Development & Permitting Success James Komadina 32 years of natural resource experience in project development, construction and operations with CEO major gold producers. Senior management positions previously held include President and CEO, North America

  17. Slide 17: Board of Directors

    Board of Directors Hendrik Van Alphen 25 years in the mining industry, first as President of Pacific Rim Mining Corp. Since 1999, he has been a Chairman director and President of Cardero Resources Corp. and a director of Wealth Minerals, Ethos Capital and Balmoral Resources. James Komadina 32 years

  18. Slide 18: Analyst Coverage

    Analyst Coverage FIRM ANALYST DATE INITIATED RBC Capital Markets Haytham Hodaly 17-Mar-11 Macquarie Michael Gray 3-Mar-11 Credit Suisse Alex Terentiew 29-Sept-10 Dahlman Rose & Co. Adam Graf 22-June-10 BMO Capital Markets John Hayes 23-Apr-10 GMP Securities Craig West 27-Apr-09 Canaccord Genuity Wen

  19. Slide 19: Vancouver Office and Investor Relations contacts

    Vancouver Office: 1177 West Hastings St., Suite 2300 Vancouver, BC, Canada V6E 2K3 Investor Relations: Telephone: 604-683-6332 Shirley Zhou U.S. Office: VP Corporate Communications 9137 S. Ridgeline Blvd., Suite 250 Email: szhou@ithmines.com Highlands Ranch, CO, USA 80129 Phone: 604-638-3247 Telepho

International Tower Hill Mines — Investor Presentation (July 2011) on 6ix