  1. Slide 1: Financial Results Q1-3 2022

    Slide 1: Financial Results Q1-3 2022

    FINANCIAL RESULTS Q1-3 2022 Warsaw, November 2022 1

  2. Slide 2: Agenda

    Slide 2: Agenda

    AGENDA PART 01 Summary PART 02 Presales and revenue’s perspective PART 03 Estimated financial results PART 04 Plans of ROBYG Group PART 05 ESG PART 06 Appendices 2

  3. Slide 3: Part 01 Summary

    Slide 3: Part 01 Summary

    ROBYG PART 01 Summary Q1-3 2022

  4. Slide 4: Summary Q1-3 2022

    Slide 4: Summary Q1-3 2022

    01. Summary Q1-3 2022 Summary Operating cash flow: Revenues: Strong cash position*: PLN 147 million PLN 509 million PLN 344 million (excl. purchase of new plots) 4 * Including amounts kept on individual escrow accounts.

  5. Slide 5: Summary Q1-3 2022

    Slide 5: Summary Q1-3 2022

    01. Summary Q1-3 2022 Summary Developer agreements signed: Units presold: 1 464 1 644 (net after cancellations) (net after cancellations) Number of units under Units on offer: 4 935 construction: 6 923 (out of which <1% finished goods) 5

  6. Slide 6: Material investing and financial activities

    Slide 6: Material investing and financial activities

    01. Summary Q1-3 2022 ROBYG Group – material investings and financial activities Total new financing: New plots PLN 75 million NEW PLOTS FINANCING Warsaw, Gdansk ROBYG S.A. – revolving loan for VAT Total expected potential for construction (with the limit of PLN 75 million). of ca. 13 000 sqm of usa

  7. Slide 7: Part 02 Presale & revenue perspective

    Slide 7: Part 02 Presale & revenue perspective

    PART 02 Presale & revenue perspective 7

  8. Slide 8: Presale structure – quarterly

    Slide 8: Presale structure – quarterly

    02. Presales & revenue’s perspective ROBYG Group – presale structure Presale in Q1-3 2022: 1 464 units (-34% Q1-3’22/Q1-3’17-21*), PLN 757 million (-15% Q1-3’22/Q1-3’17-21*) Net number of presold units (quarterly) 1196 1110 1032 938 755 633 606 638 445 381 162 Q1 2020 Q2 2020 Q3 2020 Q4 2020 Q1 2021

  9. Slide 9: Presale structure – annual

    Slide 9: Presale structure – annual

    02. Presales & revenue’s perspective ROBYG Group – presale structure Presale in Q1-3 2022: 1 464 units (-34% Q1-3’22/Q1-3’17-21*), PLN 757 million (-15% Q1-3’22/Q1-3’17-21*) Net number of presold units (annually) 4276 4308 57% 17% 3471 -27% 98% 27% 2957 2% 10% -16% 2738 2520 2569 22% 2333 2118 2156

  10. Slide 10: Presale structure by city

    Slide 10: Presale structure by city

    02. Presales & revenue’s perspective ROBYG Group – presale structure Presale in Q1-3 2022: 1 464 units (-34% Q1-3’22/Q1-3’17-21*), PLN 757 million (-15% Q1-3’22/Q1-3’17-21*) Poznan 5% Gdansk & Gdynia 38% 72 units 567 units Wroclaw 15% 215 units Warsaw 42% 610 units 10 * The average number/value of c

  11. Slide 11: Units on offer

    Slide 11: Units on offer

    02. Presales & revenue’s perspective ROBYG Group – units on offer FINISHED GOODS ON OFFER: <1% 5187 4925 33 27* 2214 2306 5154 4898 1852 19 30 34 2195 2276 1818 3Q 2021 4Q 2021 1Q 2022 2Q 2022 3Q 2022 Units under construction** Units completed * The offer is decreased by 10 commercial units which ar

  12. Slide 12: Revenue recognition

    Slide 12: Revenue recognition

    02. Presales & revenue’s perspective ROBYG Group – revenue recognition (as at 30 September 2022) Recognition potential of units in revenues Number of units recognized in revenues (quarterly) Units not presold and not 1840 recognized: 4 935 1555 Completed: 37 Under construction: 2 350 Which construct

  13. Slide 13: Units to be completed in 2022-2023

    Slide 13: Units to be completed in 2022-2023

    02. Presales & revenue’s perspective Number of units to be completed in 2022-2023 and also (contracted) until 30 September 2022 Note: Due to uncertainty pertained to the spreading of Coronavirus Total & Presold disease (COVID-19), estimation of the completed investments may 2021 2022 2023 2022+2023

  14. Slide 14: Units to be completed in 2022

    Slide 14: Units to be completed in 2022

    02. Presales & revenue’s perspective Number of units to be completed in 2022 Gdansk Warsaw Wroclaw Total no. of units to be Total no. of units to be Total no. of units to be Project Project Project completed in 2022 completed in 2022 completed in 2022 Lawendowe Osiedle Życzliwa 299 Jagodno 227 Wzgór

  15. Slide 15: Units to be completed in 2023

    Slide 15: Units to be completed in 2023

    02. Presales & revenue’s perspective Number of units to be completed in 2023 Gdansk Warsaw Wroclaw & Poznan Total no. of units to be Total no. of units to be Total no. of units to be Project Project Project completed in 2023 completed in 2023 completed in 2023 Lawendowe Wzgórze 361 Royal Residence 5

  16. Slide 16: Part 03 Estimated financial results

    Slide 16: Part 03 Estimated financial results

    PART 03 Estimated financial results 16

  17. Slide 17: Estimated financial results

    Slide 17: Estimated financial results

    03. Estimated financial results Estimated fiancial results (PLNk) Q1-3 2022 Q1-3 2021 Change 2021 Revenues 508 668 640 970 (20,6%) 1 299 900 Cost of sales (365 396) (447 962) (18,4%) (929 778) Gross profit on sales 143 272 193 008 (25,8%) 370 122 Selling and marketing expenses (19 687) (26 843) (26,

  18. Slide 18: Estimated financial condition

    Slide 18: Estimated financial condition

    03. Estimated financial results Estimated financial condition (PLNk) Q1-3 2022 Q1-3 2021 Change 2021 Total assets, including: 3 720 856 3 579 351 4,0% 3 479 289 Non-current assets, including: 684 979 696 818 (1,7%) 709 734 Investment properties and investment 515 726 510 741 1,0% 522 641 properties

  19. Slide 19: Estimated statement of cash flow

    Slide 19: Estimated statement of cash flow

    03. Estimated financial results Estimated statement of cash flow (PLNk) Q1-3 2022 Q1-3 2021 2021 Net cash flows from operating activities, 106 091 1 003 238 926 including: Expenditures for the purchase of new plots (41 239) (343 487) (346 127) Net cash flows from investing activities: 220 286 (131 3

  20. Slide 20: Debt financing

    Slide 20: Debt financing

    03. Estimated financial results Debt financing Nominal value and maturity of bank credit facilities and bonds as at September 30th, 2022 (PLNm). DEBT – Aging <1 year 1-2 years 2-3 years 3-4 years 4-5 years Over 5 years Total BANK CREDIT 214.31 0.00 0.00 0.00 0.00 0.00 214.31 FACILITIES BONDS 360.00

  21. Slide 21: Leverage and collections

    Slide 21: Leverage and collections

    03. Estimated financial results Leverage and collections as at September 30th, 2022 * Net debt ratio = net debt ** / equity ** Net debt = interest bearing liabilities + derivatives + guarantees Net debt ratio* = 0.54 granted – intercompany loans – cash and cash equivalents – amounts kept on individu

  22. Slide 22: Part 04 Plans of ROBYG Group

    Slide 22: Part 04 Plans of ROBYG Group

    PART 04 Plans of ROBYG Group 22

  23. Slide 23: Strategy

    Slide 23: Strategy

    04. Plans of ROBYG Group Strategy Strategy for the operational and business activities of the ROBYG Group agreed with TAG Immobilien AG (hereinafter: "TAG") for all TAG activities on the Polish residential market, i.e. for the activities of the ROBYG Group and Vantage Development S.A. Areas ROBYG Gr

  24. Slide 24: Strategic goals

    Slide 24: Strategic goals

    04. Plans of ROBYG Group Strategic goals Number of presold of residential units in 2022 app. 2.100 units Increase of sales in the years ahead Accumulating financial resources to strengthening liquidity Maintaining the margins Realisation of the ROBYG’s ESG strategy 24

  25. Slide 25: Land bank

    Slide 25: Land bank

    04. Plans of ROBYG Group Total land bank 14 000 units + 4 925 units on offer = 18 925 units Gdansk/Gdynia Warsaw Wroclaw Poznan Number of Number of Number of Number of District % District % District % District % units units units units Śródmieście/Gdynia 610 21% Włochy 2 080 31% Other* 1 150 100% Pi

  26. Slide 26: Commercial potential

    Slide 26: Commercial potential

    04. Plans of ROBYG Group Commercial potential = 55 000 sqm of usable area Commercial potential = 55 000 sqm of usable area WROCLAW* POZNAN 35 000 20 000 TOTAL: 55 000 sqm 26 * Preliminary land purchase agreements.

  27. Slide 27: ROBYG Group estimates – presold and handovers

    Slide 27: ROBYG Group estimates – presold and handovers

    04. Plans of ROBYG Group ROBYG Group estimates Presold (units) Handovers (units) 3275 3550 3680 2850 2650 2500 2800 2650 2500 2100 2022 2023 2024 2025 2026 2022 2023 2024 2025 2026 27

  28. Slide 28: ROBYG Group estimates – collections and cash flow

    Slide 28: ROBYG Group estimates – collections and cash flow

    04. Plans of ROBYG Group ROBYG Group estimates Amount to be collected from clients (PLNm) Cash flows from operating activities (PLNm) 1700 1685 1600 1490 385 1390 365 310 240 245 2022 2023 2024 2025 2026 2022 2023 2024 2025 2026 Cash flows from operating activities assume net expenses for the purcha

  29. Slide 29: Part 05 ESG

    Slide 29: Part 05 ESG

    PART 05 ESG ROBYG FOR SOCIETY AND ENVIRONMENT 29

  30. Slide 30: ESG – Mission, philosophy, actions

    Slide 30: ESG – Mission, philosophy, actions

    05. ESG FOR SOCIETY AND ENVIRONMENT MISSION PHILOSOPHY ACTIONS “Our mission is to inspire others CARE The protection of natural resources and to work together, to fulfil the vision care for the environment are very of a sustainable world for our important to us, hence we implement ecological solutio

  31. Slide 31: ESG – Environmental dimension

    Slide 31: ESG – Environmental dimension

    05. ESG – Environmental dimension ROBYG FOR PLANET Focus Areas ▪ Green standard: successfully incorporating eco- friendly and low-carbon solutions 15 ▪ Making 15-minute city concept a reality ▪ Water and biodiversity Strategic Goals We lead sustainable development processes fully respecting the natu

  32. Slide 32: ESG – Environmental dimension

    Slide 32: ESG – Environmental dimension

    05. ESG – Environmental dimension ROBYG FOR PLANET 32 * Estimated values. Data for all projects in company’s history unless otherwise stated

  33. Slide 33: ESG – Social dimension

    Slide 33: ESG – Social dimension

    05. ESG – Social dimension ROBYG FOR PEOPLE Focus Areas ▪ Building new, integrated communities ▪ Employee well-being: be the employer that attracts, retains and grows people. ▪ Client satisfaction ▪ Through its projects, ROBYG shapes new communities. Strategic Goals ▪ We are also considering our soc

  34. Slide 34: ESG – Social dimension

    Slide 34: ESG – Social dimension

    05. ESG – Social dimension ROBYG FOR PEOPLE 34 * Estimated values. Data for all projects in company’s history unless otherwise stated

  35. Slide 35: ESG – Governance dimension

    Slide 35: ESG – Governance dimension

    05. ESG – Governance dimension ROBYG FOR SUSTAINABLE BUSSINES Focus Areas ▪ ESG in management practices ▪ Annual ESG disclosure & transparent business Strategic Goals ▪ ROBYG ESG Website- already launched ▪ We are managing the company responsibly while www.esg.robyg.pl delivering strong financial per

  36. Slide 36: ESG

    Slide 36: ESG

    05. ESG All of us at ROBYG acknowledge how important sustainable growth is for the envirnomnent and society. So far we have done a lot, but we treat this is a journey that will involve over time. Thus, we are committed to continuing our work to constantly improve our performance and disclose it to t

  37. Slide 37: Part 06 Appendices

    Slide 37: Part 06 Appendices

    PART 06 Appendices 37

  38. Slide 38: Senior Management Team

    Slide 38: Senior Management Team

    06. Appendices Senior Management Team Oscar Kazanelson Artur Ceglarz Dariusz Pawlukowicz Eyal Keltsh Marta Hejak Chairman of the Supervisory Vice President, Vice President, Vice President, COO Vice President, CFO Board Head of Business Dev. Head of HR Years at ROBYG: 20+ Years at ROBYG: 15 Years at

  39. Slide 39: Ownership structure

    Slide 39: Ownership structure

    06. Appendices Ownership structure TAG Immobilien AG holds indirectly 100% of ROBYG S.A. shares. TAG Immobilien AG is a MDAX-listed (Frankfurt Stock Exchange) real estate company. 39

  40. Slide 40: TAG Immobilien AG consolidated financials

    Slide 40: TAG Immobilien AG consolidated financials

    06. Appendices TAG Immobilien AG consolidated financials (EURm) Financial data (EURm) H1 2022 2021 2020 2019 2018 Assets 8 582,3 7 088,6 6 478,0 5 647,0 5 033,3 Equity 3 302,6 3 129,5 2 681,5 2 394,2 2 048,3 EBITDA (adjusted) 117,6 226,1 222,3 214,7 206,4 Consolidated net profit 301,8 585,6 402,6 45

  41. Slide 41: Investments under construction (1)

    Slide 41: Investments under construction (1)

    06. Appendices Description of investments – under construction (1) Lawendowe Wzgórza / Osiedle Kameralne City Sfera Stacja Nowy Gdansk City: Gdansk City: Warsaw City: Warsaw District: Jasień District: Bemowo District: Włochy No. of stages: ca. 40 No. of stages: 8 No. of stages: 14 Stages completed:

  42. Slide 42: Investments under construction (2)

    Slide 42: Investments under construction (2)

    06. Appendices Description of investments – under construction (2) Nowa Letnica Young City 2 Modern City City: Gdansk City: Warsaw City: Warsaw District: Letnica District: Bemowo District: Bemowo No. of stages: 15 No. of stages: 6 No. of stages: 9 Stages completed: 13 Stages completed: 1 Stages comp

  43. Slide 43: Investments under construction (3)

    Slide 43: Investments under construction (3)

    06. Appendices Description of investments – under construction (3) Jagodno Osiedle Życzliwa Praga Nadmotławie Estate City: Wroclaw City: Warsaw City: Gdansk District: Krzyki District: Tarchomin District: Śródmieście No. of stages: 10 No. of stages: 7 No. of stages: 12 Stages completed: 3 Stages comp

  44. Slide 44: Investments under construction (4)

    Slide 44: Investments under construction (4)

    06. Appendices Description of investments – under construction (4) Moment Park Południe Apartamenty Królewskie City: Gdansk City: Gdansk City: Warsaw District: Ujeścisko District: Łostowice District: Wilanów No. of stages: 4 No. of stages: 8 No. of stages: 2 Stages completed: 1 Stages completed: 5 S

  45. Slide 45: Investments under construction (5)

    Slide 45: Investments under construction (5)

    06. Appendices Description of investments – under construction (5) Więcej Mój Ursus Lagom City: Gdansk City: Warsaw City: Gdansk District: Łostowice District: Ursus District: Ujeścisko No. of stages: 2 No. of stages: 9 No. of stages: 1 Stages completed: 1 Stages completed: 3 Stages under constructio

  46. Slide 46: Investments under construction (6)

    Slide 46: Investments under construction (6)

    06. Appendices Description of investments – under construction (6) Szumilas Wojszyckie Alejki Porto City: Gdansk (Kowale) City: Wroclaw City: Gdansk District: Krzyki District: Nowy Port No. of stages: 6 No. of stages: 2 No. of stages: 16 Stages under construction*: 3 Stages completed: 1 Stages under

  47. Slide 47: Investments under construction (7)

    Slide 47: Investments under construction (7)

    06. Appendices Description of investments – under construction (7) Praga Deco Młode Stogi Royal Residence City: Warsaw City: Gdansk City: Warsaw District: Praga Południe District: Stogi District: Wilanów No. of stages: 1 No. of stages: 1 No. of stages: 7 Stages under construction: 1 Stages under con

  48. Slide 48: Investments under construction (8)

    Slide 48: Investments under construction (8)

    06. Appendices Description of investments – under construction (8) Kameralna Olszówka Początek Piątkowo Sady Ursynów City: Wrocław City: Poznań City: Warsaw District: Krzyki District: Piątkowo District: Ursynów No. of stages: 1 No. of stages: 6 No. of stages: 5 Stages under construction: 1 Stages un

  49. Slide 49: Investments under construction (9)

    Slide 49: Investments under construction (9)

    06. Appendices Description of investments – under construction (9) Wiśniowa Aleja VISTA Dożynkowa 43 City: Gdańsk City: Gdańsk City: Wrocław District: Ujeścisko District: Piecki-Migowo District: Krzyki No. of stages: 2 No. of stages: 1 No. of stages: 1 Stages under construction: 2 Stages under const

  50. Slide 50: Investments under construction (10)

    Slide 50: Investments under construction (10)

    06. Appendices Description of investments – under construction (10) Osiedle nad Widawą Rytm Mokotowa Praga Piano City: Wrocław City: Warszawa City: Warszawa District: Psie Pole District: Mokotów District: Praga Południe No. of stages: 1 No. of stages: 6 No. of stages: 1 Stages under construction*: 1

  51. Slide 51: Investments under construction (11)

    Slide 51: Investments under construction (11)

    06. Appendices Description of investments – under construction (11) Jutrzenki Wendy Sea Salt City: Warszawa City: Gdynia City: Gańsk District: Włochy District: Śródmieście District: Zaspa No. of stages: 1 No. of stages: 5 No. of stages: 1 Stages under construction*: 1 Stages under construction*: 1 S

  52. Slide 52: Investments completed (1)

    Slide 52: Investments completed (1)

    06. Appendices Description of investments – completed (1) Szczęśliwy Dom Osiedle Zdrowa Nowa Rezydencja Królowej Marysieńki City: Warsaw City: Warsaw City: Warsaw District: Ochota District: Wilanów District: Wilanów No. of stages: 3 No. of stages: 5 No. of stages: 10 No. of units: 304 units No. of u

  53. Slide 53: Investments completed (2)

    Slide 53: Investments completed (2)

    06. Appendices Description of investments – completed (2) City Apartments Osiedle Królewskie Albatross Towers City: Warsaw City: Warsaw City: Gdansk District: Żoliborz District: Wilanów District: Przymorze No. of stages: 6 No. of stages: 6 No. of stages: 5 No. of units: 1 190 units No. of units: 640

  54. Slide 54: Investments completed (3)

    Slide 54: Investments completed (3)

    06. Appendices Description of investments – completed (3) Królewski Park Park Wola Residence Modern Żoliborz City: Warsaw City: Warsaw City: Warsaw District: Wilanów District: Wola District: Żoliborz No. of stages: 6 No. of stages: 1 No. of stages: 1 No. of units: 528 units No. of units: 317 units N

  55. Slide 55: Investments completed (4)

    Slide 55: Investments completed (4)

    06. Appendices Description of investments – completed (4) Young City Młody Wilanów Mila Baltica City: Warsaw City: Warsaw City: Gdansk District: Bemowo District: Wilanów District: Zaspa No. of stages: 9 No. of stages: 3 No. of stages: 2 No. of units: 1 302 units No. of units: 257 units No. of units:

  56. Slide 56: Investments completed (5)

    Slide 56: Investments completed (5)

    06. Appendices Description of investments – completed (5) Apartamenty Villa Nobile Słoneczna Morena MoreNova City: Warsaw City: Gdansk City: Gdansk District: Wilanów District: Piecki-Migowo District: Piecki-Migowo No. of stages: 3 No. of stages: 22 No. of stages: 3 No. of units: 637 units No. of uni

  57. Slide 57: Investments completed (6)

    Slide 57: Investments completed (6)

    06. Appendices Description of investments – completed (6) Ogrody Wilanów Green Mokotów Stacja Nowy Ursus City: Warsaw City: Warsaw City: Warsaw District: Wilanów District: Mokotów District: Ursus No. of stages: 3 No. of stages: 9 No. of stages: 5 No. of units: 221 units No. of units: 673 units No. o

  58. Slide 58: Investments completed (7)

    Slide 58: Investments completed (7)

    06. Appendices Description of investments – completed (7) Forum Wola Praga Arte Leśna Przystań City: Warsaw City: Warsaw City: Wroclaw District: Wola District: Praga Południe District: Osobowice No. of stages: 4 No. of stages: 1 No. of stages: 1 No. of units: ca. 880 units No. of units: ca. 250 unit

  59. Slide 59: Investments completed (8)

    Slide 59: Investments completed (8)

    06. Appendices Description of investments – completed (8) Willa Nad Potokiem Uroczysko Zajezdnia Wrzeszcz City: Wroclaw City: Wroclaw City: Gdansk District: Fabryczna District: Psie Pole District: Wrzeszcz No. of stages: 1 No. of stages: 3 No. of stages: 14 No. of units: 13 units No. of units: 309 u

  60. Slide 60: Summary Q1-3 2022 and contact

    Slide 60: Summary Q1-3 2022 and contact

    Summary Q1-3 2022 Please contact us: Units presold: 1 464 Investor Relations (net after cancellations) ROBYG S.A. ri@robyg.com.pl Number of signed development agreements: 1 644 (22) 419 11 00 (net after cancellations) Units on offer: 4 935 (out of which <1% are finished goods) Revenues: PLN 509 mill

  61. Slide 61: Disclaimer

    Slide 61: Disclaimer

    Disclaimer ROBYG S.A. endeavours to ensure that the information in the presentation is complete and up-to-date, however, we do not make any guarantees in this respect. ROBYG S.A. accepts no liability for the any errors and inaccuracies of this presentation. This presentation has been prepared solely