Enlight Renewable Energy Ltd · TASE:ENLT
Enlight Renewable Energy — Investor Presentation (February 2024)
21 slides from Enlight Renewable Energy's investor presentation, February 2024

Slide 1: Investor Presentation February 2024
INVESTOR PRESENTATION F e b r u a r y 2024

Slide 2: Legal disclaimer
Legal disclaimer This presentation contains forward-looking statements within the meaning of the U.S. Private Securities Litigation Reform Act of 1995. We and disagreements with partners, investors and other counterparties that could reduce our right to cash flows generated by our projects; intend s

Slide 3: Enlight at a glance
Enlight at a glance Next generation global renewable energy platform Greenfield developer and IPP Global platform Wind, solar and energy storage Control over entire project life cycle Growing activity across Expertise across main renewable U.S., Europe and Israel technologies Extensive track record

Slide 4: Enlight represents a differentiated investment opportunity
Enlight represents a differentiated investment opportunity Control over entire project lifecycle from greenfield development to power generation maximizes project returns Global platform with operational infrastructure in the largest renewable energy markets across the U.S. and Europe Diversified po

Slide 5: Achieving ~3X growth every 3 years in the past decade
Achieving ~3X growth every 3 years in the past decade Founder mentality, market innovation and business discipline 4.2 GW + 1.9 GWh successfully developed2 56 quarters as a public company 2023 Expansion across major global markets 2020-2021 Raising $271 Early mover within million in an 2021 IPO on E

Slide 6: Control over entire project lifecycle as both a greenfield developer and IPP
Control over entire project lifecycle as both a greenfield developer and IPP Lead project design Leverage global platform to optimize supply Competitive advantage chain access and terms with low cost of capital Project Engineering Construction Asset Finance Sourcing & Procurement Management Manageme

Slide 7: Our combined developer & IPP model: 5.4 GW and 5.6 GWh Mature Projects
Our combined developer & IPP model: 5.4 GW and 5.6 GWh Mature Projects Generation, Storage, Graph, MW MWh scale Portfolio definitions Operational, under construction and pre- + + Mature construction (expected to start construction within 12 months) + 10,549 12,603 20,618 30,743 4,693 12,491 Projects

Slide 8: Global renewable platform in the right markets at the right time
Global renewable platform in the right markets at the right time Europe Regional energy crisis Renewables the key to energy security Pan European footprint 3.3 GW + 1.6 GWh across 9 European countries Near term upside 1.6 GW + 0.6 of mature projects United States Israel Renewables IRA a game changer

Slide 9: Diversified mature portfolio reduces exposure to volatility
Diversified mature portfolio reduces exposure to volatility Diversity across technology, geography and revenue structure 5% 14% 18% 15% 9% 53% Revenue 57% Region Technology Structure 17% 5.4 GW 5.4 GW 5.4 GW 29% 63% 20% Israel CEE Western Europe US Solar Wind Solar+Storage Fixed PPA Linked PPA Merch

Slide 10: Creating long term growth through "land and expand" development strategy
Creating long term growth through “land and expand” development strategy Addressing transmission scarcity by leveraging existing large-scale interconnection assets to fuel expansion U.S.: CO Bar Europe: Gecama Israel: Genesis Wind 1.2 GW interconnection position in Leveraging Enlight owned transmiss

Slide 11: Medium term picture: unique leadership position across interconnection
Medium term picture: unique leadership position across interconnection Transmission infrastructure is the principal constraint for renewable energy today Mature Projects Advanced Development Development 3.1 GW + 3.6 GW + 2.9 GW 100% of 100% of U.S 32% of U.S U.S Mature Advanced Development Developme

Slide 12: Case study: delivery of PJM portfolio
Case study: delivery of PJM portfolio 1.4 GW and 2.2 GWh of energy storage fast tracked to final interconnection agreements Project Name Status Generation (MW) Storage (MWh) State 1 PJM portfolio carries minimal network upgrade costs Near Gemstone 185 - Michigan Construction Advanced Blackwater 720

Slide 13: Strong growth in 2023 with continued improvement in profitability
Strong growth in 2023 with continued improvement in profitability Demonstrated value of combined developer and IPP business model Q4 2023 versus Q4 2022 FY 2023 versus FY 2022 21% ($m) ($m) 74 33% 256 61 8% 45% 192 189 47 -35% 66% 43 150 37 130 157% 48% 98 24 90 16 11 38 Revenue Net income Adjusted

Slide 14: Moving into 2024: improving fundamentals
Moving into 2024: improving fundamentals Equipment prices continue to fall … … while PPA pricing continues to rise … … and interest rates stabilize Key commodity prices Price ($/MWh) US PPA Prices 10-year US government bond yield 120 60.11 $60 100 56.4 5.0% 4.9% 80 $50 52.69 4.5% 4.3% 60 $40 40 Sola

Slide 15: Project returns: mid-teens levered returns expected for 2024-26 CODs
Project returns: mid-teens levered returns expected for 2024-26 CODs Overlaying a 10% unlevered return with a 5.25%-5.75% cost of debt Global Portfolio of 2024-26 CODs Equity IRR 3.5 GW 5.4 GWh 90% With Mid-teens % Signed PPAs Unlevered Ratio $352-370m Estimated First 10% Full Year EBITDA1 $3.6bn Es

Slide 16: Growth in 2024: Starting on three new flagship projects, Atrisco reaches COD
Growth in 2024: Starting on three new flagship projects, Atrisco reaches COD Combination of large-scale projects at high returns Country Acres Roadrunner Location California Location Arizona Capacity 392 MW + 688 MWh Capacity 294 MW + 940 MWh Status Construction starts 1H24 Status Construction start

Slide 17: Growth in 2024: Diverse mix of new wind, solar and battery projects
Growth in 2024: Diverse mix of new wind, solar and battery projects Continuing to expand presence across EU and Israel with high projected project returns Gecama Hybrid Location Solar, Spain Capacity 225 MW + 200 MWh Status Near Construction First Year $38-40m / $28-29m Revenues / EBITDA1 Unlevered

Slide 18: 2024 Guidance – Revenues of $335-360m and Adjusted EBITDA of $235-255m
2024 Guidance – Revenues of $335-360m and Adjusted EBITDA1 of $235-255m Operational Portfolio Revenue Adjusted EBITDA1 (MW & MWh) ($m) ($m) 50% CAGR 335-360 Key Assumptions +236% CAGR in MW • 90% of generation sold at fixed prices +579% CAGR 2,426 MW+ 35% through hedges or PPAs in MWh 1,880 MWh 256

Slide 19: Expected growth to continue apace in the coming years
Expected growth to continue apace in the coming years Massive growth into middle of decade: operational capacity expected to triple to 5.3 GW and 5.7 GWh by the end of 2026 2024 | Atrisco (364 MW, 1.2 GWh) Major Expected 2025 | Gecama & Roadrunner (519 MW, 1.1 GWh) 5,338 MW + 5,649 MWh CODs 2026 | C

Slide 20: Appendix
APPENDIX 20

Slide 21: Reconciliation between Net Income to Adjusted EBITDA
Reconciliation between Net Income to Adjusted EBITDA ($ thousands) For the 12 months ended For the three months ended 12/31/23 12/31/22 12/31/23 12/31/22 Net Income (loss) 98,067 38,113 16,228 10,955 Depreciation and amortization 65,796 42,267 21,611 13,454 Share based compensation 4,970 8,673 970 1
Source: Internet Archive copy of enlightenergy.co.il
More decks from Enlight Renewable Energy Ltd
Q3 2026 Earnings Presentation36 slides · Nov 3, 2026
Investor Presentation (November 2026)48 slides · November 2026
Q3 2026 Earnings Presentation36 slides · November 2026
Investor Presentation (October 2026)46 slides · October 2026
Investor Presentation (August 2026)44 slides · August 2026
Q2 2026 Earnings Presentation36 slides · August 2026