  1. Slide 1: DTE Community Engagement Session

    DTE Community Engagement Session January 22, 2026

  2. Slide 2: Agenda

    Agenda • Welcome and meeting goals • Help resources overview • DTE grounding presentations and Q&A • Feedback topics and discussion norms overview • Small group feedback sessions • Conclusion

  3. Slide 3: Resources

    Resources Comment Cards I Can Help Frequently Desk Requested Resources Handout

  4. Slide 4: A Look at Our Energy System and Planning Processes

    A Look at Our Energy System and Planning Processes Grounding Presentation January 22, 2026

  5. Slide 5: DTE Electric

    DTE Electric • Founded in 1903 • Own and operate generation and distribution assets • Serving 2.3 million customers in southeast Michigan • Nearly 10,000 employees • In 2024: DTE Electric Service ‒ Spent $3.3 billion with local Territory Michigan businesses ‒ Contributed ~63,000 volunteer hours Now

  6. Slide 6: The Electric System

    The Electric System 6

  7. Slide 7: The electric system follows a multi-step process from generation to distribution

    The electric system follows a multi-step process from generation to distribution 7

  8. Slide 8: DTE uses planning tools for generation and distribution

    DTE uses planning tools for generation and distribution 2022 CleanVision 2023 Integrated Resource Plan Distribution Grid Plan1 1. This is now referred to as the Distribution System Plan. See July 10, 2025, Order in MPSC Case No. U-20147, Exhibit A 8

  9. Slide 9: Our generation and distribution planning processes are guided by the following objectives

    Our generation and distribution planning processes are guided by the following objectives SAFE: Public and employees are kept free from injury; meet all State and Federal requirements RELIABLE AND RESILIENT: Minimal equipment outages and disruptions to customers AFFORDABLE: Cost-effective service pr

  10. Slide 10: Planning objectives must be carefully balanced to deliver the best overall outcome for customers

    Planning objectives must be carefully balanced to deliver the best overall outcome for customers Reliable & • Generation Planning - Ensure we have adequate Resilient energy supply to meet customers’ needs 24 hours a day, 7 days a week • Distribution Planning – Reduce outages and improve restoration

  11. Slide 11: DTE has a diverse portfolio of generation assets capable of producing more than 12,000 MW

    DTE has a diverse portfolio of generation assets capable of producing more than 12,000 MW DTE Electric’s generation resources include: • 34 Solar Farms PINE RIVER SOLAR AND WIND PARK LUDINGTON PUMPED STORAGE • 20 Wind Parks • Ludington Pumped Storage1 • Slocum Battery Energy Storage System • Blue Wa

  12. Slide 12: Our generation mix is dramatically changing under our current CleanVision Integrated Resource Plan

    Our generation mix is dramatically changing under our current CleanVision Integrated Resource Plan 2022 Plan Summary Proposed Generation Mix (2023-2042) (2005-2042, MWh%) (2023-2027) 12

  13. Slide 13: Stations, sub-transmission lines, substations and distribution lines make up the distribution system

    Stations, sub-transmission lines, substations and overhead and underground distribution lines make up the power distribution system 13

  14. Slide 14: DTE's electric grid is vast and serves over 2.3 million electric customers

    DTE’s electric grid is vast and serves over 2.3 million electric customers DTE Electric Distribution System DTE Electric's Grid: • 31,000 miles of overhead circuits ─ 28,500 miles of distribution ─ 2,500 miles of subtransmission • 14,500 miles of underground cable • Over 780 substations • Over 1 mil

  15. Slide 15: The goal of our 4-point plan is to reduce power outages and cut outage durations in half by 2029

    The goal of our 4-point plan is to reduce power outages by 30% and cut outage durations in half by 2029 TRANSITIONING TO A SMART UPDATING EXISTING 1 GRID 2 INFRASTRUCTURE 3 REBUILDING SIGNIFICANT PORTIONS OF THE GRID 4 TRIMMING TREES 15

  16. Slide 16: Customer Accessibility and Community Focus is a planning objective for both generation and distribution

    Customer Accessibility and Community Focus is a planning objective for both generation and distribution planning 16

  17. Slide 17: Questions?

    Questions? DTE 17

  18. Slide 18: Feedback Focus Topics

    Feedback Focus Topics • Reliable and Resilient Minimal equipment outages and disruptions to customers • Affordable Cost effective service provided to all customers • Clean Operate in an environmentally sustainable manner and achieve low carbon aspirations enabling a decarbonized economy in Michigan

  19. Slide 19: Small Group Discussion Norms

    Small Group Discussion Norms • Listen for understanding • Make space/take space • Ask questions —Share perspectives and ideas • Practice both/and thinking • Address the idea and not the person

  20. Slide 20: Small Group Discussion

    Three rounds of discussion: • Individual reflection (five min) • Record ideas on ½ sheets of Small paper • Small group discussion (10 min) Group • PSC staff will record ideas on Discussion the flip charts • Final round: Sticky dot voting (three min) • Each individual places a sticky dot next to the

  21. Slide 21: Discussion Questions

    Discussion Questions Reliable: What does reliable electricity look like for your community, and what should DTE consider for the future? Clean: What does clean energy look like for your community, and how should DTE support it? Affordable: How should DTE balance affordability with reliability and cl

  22. Slide 22: Thank you for your time and feedback! Next Steps

    Thank you for your time and feedback! Next Steps DTE will: • Continue with community conversations • Share summary of the feedback received from these sessions • Answer any outstanding questions • File the Integrated Resource Plan before the end of 2026 • File Distribution System Plan by June 30, 20