New Gold Inc

New Gold — Q3 2016 Earnings Presentation

11 slides from New Gold's earnings presentation, Oct 28, 2016

  1. Slide 1: Management's Discussion and Analysis

    newg«:ld Management's Discussion and Analysis For the three and nine months ended September 30, 2016

  2. Slide 2: Production costs remained very competitive

    New Gold’s production costs remained very competitive compared to the broader gold mining space as New Gold had total cash costs (1) of $350 per gold ounce sold and all-in sustaining costs (1) of $682 per gold ounce sold in the third quarter of 2016. We believe New Gold continues to establish itself

  3. Slide 3: Total cash costs, AISC and Q3 2016 gold production

    TOTAL CASH COSTS " 32016 a 35. 3 2015 2 32 TT 2 ° 100 200 «300 400«S 500 ALL-IN SUSTAINING COSTS ‘ 3 2116 TT 652 32 72: 3) 00 soo 700 900 Q3 2016 GOLD PRODUCTION BY OPERATING MINE = New 15% Afton 25% = Mesquite 95,546 OUNCES = Peak Mines 40% _ = Cerro San Pedro

  4. Slide 4: Summary of quarterly results and non-GAAP notes

    2016 2015 2016 2015 95,546 122,580 285,780 303,999 96,452 115,695 284,303 295,847 1,328 1,117 1,269 1,174 350 495 346 464 682 788 718 895 178.7 177.3 513.5 513.9 5.1 (157.8) 22.8 (191.9) 13.4 (8.5) 26.7 (13.9) 89.6 51.0 230.5 177.7 88.6 58.4 233.3 188.5 151.2 384.6 151.2 384.6 22.4 24.5 71.9 97.9 13

  5. Slide 5: Asset locations: operating, development and stream assets

    Blackwater Rainy River New Afton Cerro San Pedro Mesquite El Morro gold stream * DEVELOPMENT + OPERATING + STREAM ASSET Peak Mines

  6. Slide 6: Gold, copper and silver prices

    GOLD PRICES COPPER PRICES. SILVER PRICES (US. dollars per ounce) (US. dollars per pound) (US. dollars per ounce) 1400, ——_____ oe $40, ———_____ . . : WS i200 oso ss s1.i90 $200 so sepa spas sepis sepa spas sepas sep sepas sep —owarenty average resizes price ‘anise ance coat ele, —ewartery average re

  7. Slide 7: Economic outlook and foreign exchange impact

    14 For an analysis of the impact of foreign exchange fluctuations on operating costs for the three and nine months ended September 30, 2016 relative to prior-year periods, refer to the “Review of Operating Mines” sections for New Afton, Peak Mines and Cerro San Pedro. Economic Outlook The LBMA p.m.

  8. Slide 8: Reconciliation of net (loss) earnings – year to date 2015 to 2016

    RECONCILIATION OF NET (LOSS) EARNINGS – YEAR TO DATE 2015 TO 2016 ( in millions of U.S. dollars )

  9. Slide 9: SDNINYE LAN OLA sto ED

    SDNINYE LAN OLA sto ED -an0D34 yet a0 anon SDNYNHY 40 13M ‘S150 DNL Sasson ato nanwovsnga ssaNisne aNY NoLLWHO KA siswaaxa _Lnarunya casvEavHS aNY NouwuLsIMVaY auyeosH09 a Nowwanosnoo {DUO 04 NoISIAOHA NoUTWI0 aNY NoMa = ea) (292) 100 ° (200) 0

  10. Slide 10: Reconciliation of adjusted net (loss) earnings – year to date 2015 to 2016

    RECONCILIATION OF ADJUSTED NET (LOSS) EARNINGS – YEAR TO DATE 2015 TO 2016 ( in millions of U.S. dollars )

  11. Slide 11: (24) a el (14) (10) (20) spin san aausnray aL sro £0 aswauna eeLanvoon1

    (24) 52 a el (14) (10) (20) spin san aausnray aL sro £0 aswauna eeLanvoon1 aaLsnray awoDNi-DNMNEL 40.N ‘51509 -DWaN narwo7gAaa ssaNsne aNY NolLyHowKa siswasa navinyd aasveivs any NouuLsivay aty¥oau0> NoUrWIa aNy HowLvioasaa siswasea onuviaa0 sso JN aaisnvoy aLA stoe €0

New Gold — Q3 2016 Earnings Presentation on 6ix