Jupiter Energy Limited · ASX:JPR

Jupiter Energy — Investor Presentation (April 2023)

16 slides from Jupiter Energy's investor presentation, April 2023

  1. Slide 1: Corporate Presentation April 2023

    Corporate Presentation April 2023

  2. Slide 2: Disclaimer

    DISCLAIMER This presentation contains forward-looking statements that are subject to risk factors associated with the oil and gas industry. It is believed that the expectations reflected in these statements are reasonable, but they may be affected by a variety of variables which could cause actual r

  3. Slide 3: Table of Contents

    TABLE OF CONTENTS Overview of the company Reserves, licence area and operational status Current and future development

  4. Slide 4: Board of Directors and Management

    BOARD OF DIRECTORS AND MANAGEMENT Directors Geoff Gander Alexey Kruzhkov Baltabek Kuandykov Alexander Kuzev Mark Ewing Chairman/CEO NED - Cyprus NED – Kazakhstan NED - Moscow NED - Australia Kazakhstan & Australia President – Jupiter KZ o Focused on Kazakh business o 40 years’ experience in local an

  5. Slide 5: Overview of Jupiter

    OVERVIEW OF JUPITER Operations started in 2008 on the 100% owned licence area under Contract 2275 and Contract Production Profile: 4803-UVS ME (Akkar East Production Contract) o Commercial Production from the Akkar North (East Block), Akkar East and West Zhetybai fields is currently ~90 tonnes / A t

  6. Slide 6: Progress from 2008-2022

    PROGRESS FROM 2008-2022 KEY PROJECTS DISCOVERIES OIL PRODUCTION CORPORATE DURING 2023 3D seismic data acquired for the 2010/11: NIL March 2023 – All three oilfields no Listed on the ASX entire licence area plus 2011/12: 4,000 tonnes/28,000 longer running under constrained 1,229,850,121 shares on iss

  7. Slide 7: Table of Contents

    TABLE OF CONTENTS Overview of the company Reserves, licence area and operational status Current and future development

  8. Slide 8: Location of the Licence Area

    LOCATION OF THE LICENCE AREA North Akkar Total reserves for the Mangistau basin are estimated to be in excess of 5 billion barrels including two large oil fields, Uzen and Zhetybai

  9. Slide 9: Reserves and Production Summary

    RESERVES AND PRODUCTION SUMMARY Return to optimal production levels from March 2023: Akkar North (East Block), Akkar East and West Zhetybai producing a cumulative ~90 tonnes / ~675 barrels per day Ongoing review of existing wells to continue to optimize production levels. Workovers and installation

  10. Slide 10: Licence Details

    LICENCE DETAILS COMMERCIAL RODUCTION PRODUCTION PROFILE BLOCK 31 EXPLORATION LICENCE LICENCE Permit issued in December 2006 and Completed on all 3 oilfields 25 years for commercial discoveries – o Currently ~90 tonnes / ~675 barrels acquired by Jupiter in June 2008 commenced in 2020 per day producti

  11. Slide 11: Table of Contents

    TABLE OF CONTENTS Overview of the company Reserves, licence area and operational status Current and future development

  12. Slide 12: Current Field Development

    CURRENT FIELD DEVELOPMENT License area of “MMG” JSC Prospect of the reserves’ increase in North Akkar the area of well #54 by 2.8mln. tons oilfield Akkar North (Eastern block) С1+С2 geol./recov. reserves Akkar North 2976/642thous.tons Joint Full Field Development Project with MMG JSC in progress Akk

  13. Slide 13: Current Status of Field Development

    CURRENT STATUS OF FIELD DEVELOPMENT Akkar North (East Block) & East Akkar: 6 wells @ 1-2km apart; All oil produced from the Triassic (T2B) horizon; T2A and Jurassic has shows in all wells, but the Company has not produced from intervals other than T2B; Final Reserve Reports for Akkar E and Akkar N (

  14. Slide 14: Production Outlook: 2023 to 2030

    PRODUCTION OUTLOOK: 2023 to 2030 EXISTING AND PLANNED GAS STAGE 2 OPPORTUNITY TIMING PRODUCTION OUTLOOK INFRASTRUCTURE (2023 – 2030) Detailed 100% Gas Utilisation Tie in with existing gas Stage 1 gas utilization 25 year Production Licence Plan implemented. infrastructure and enable infrastructure co

  15. Slide 15: Further Development Potential

    FURTHER DEVELOPMENT POTENTIAL 10-20 mmbbls 10+ mmbbls

  16. Slide 16: Contact Details

    CONTACT DETAILS Geoff Gander Chairman & CEO Jupiter Energy Limited +7 701 221 8907 (KZ) +61 417 914 137 (AU) geoff@jupiterenergy.com www.jupiterenergy.com

Jupiter Energy — Investor Presentation (April 2023) on 6ix