    Corporate Presentation February 2018 Contact us Kings Buildings, 16 Smith Square, London SW1P 3JJ Web: www.aminex-plc.com 1

  2. Slide 2: Disclaimer

    Disclaimer Certain information contained herein constitutes forward-looking statements, which can be identified by the use of forward- looking terminology such as “anticipates”, “believes”, “estimates”, “expects”, “intends”, “may”, “plans”, “projects”, “should” or “will”, or, in each case, their neg

  3. Slide 3: Achievements to Date

    Achievements to Date Recent Achievements • De-levered balance sheet with approximate net cash of $9MM with no debt • Introduced supportive cornerstone investor (ARA / Eclipse – Zubair ~30% holding) • Kiliwani North 1 well brought onstream for production • Successfully drilled and tested Ntorya 1 and

  4. Slide 4: Corporate Summary

    Corporate Summary • Main market listing on London and Irish Stock Exchanges: AEX • Approximately US$ 9MM (Cash and Cash Receivables) Financial • No Debt • Company supported by largest shareholder to grow (30% Eclipse – Zubair) • 2017 Production: 3600 MMcf (3.6 Bcf) Production • Average Netback price

  5. Slide 5: 2017 Resource Tables Summary

    2017 Resource Tables Summary Gas Contingent Resources Gas Reserves Gross Licence Basis Gross Licence Basis (2P) MMBOE Area 2C (6:1) Area Bcf MMBOE (6:1) Ntorya Development 81 13 pending Ntorya Development Kiliwani North 1.94 0.323 681 113 Unclarified Gross mean unrisked GIIP Interest % Ntorya Apprai

  6. Slide 6: 6

    6

  7. Slide 7: Ntorya Appraisal Area: The Journey

    Ntorya Appraisal Area: The Journey • Company committed to drill Ntorya-3 with forecasted spud 2H 2018 • Ntorya-3 to target possible increase of 2C resources and a potential production well for the early production system • Significant exploration upside remaining outside Ntorya over Ruvuma PSA • Gas

  8. Slide 8: Ntorya Appraisal Area: The Journey

    Ntorya Appraisal Area: The Journey Green bars represent estimated gross unrisked P10 GIIP 11x increase Ongoing technical work 8

  9. Slide 9: Phased Development Concept

    Phased Development Concept Early Production System (EPS) Indicative Full Field Development (FFD) Gross reservoir Gross reservoir complex isopach complex isopach * Pipeline to Madimba Gas Plant to be constructed • io oil & gas consulting (Baker Hughes, GE Company and McDermott joint venture) has prov

  10. Slide 10: Ntorya Significant Remaining Exploration Upside

    Ntorya Significant Remaining Exploration Upside Stratigraphic Column FIELD • Ntorya wells targeting Cretaceous slope channel system • Significant upside exploration exists in the fans 10

  11. Slide 11: Ntorya-3 Pathway to Early Production System

    Ntorya-3 Pathway to Early Production System History / Background • Ntorya-1 gas discovery (2012) proved onshore Cretaceous play in the Ruvuma basin. • Ntorya-2 appraisal well (2017) encountered 51m gross Cretaceous reservoir interval 74m up-dip from Ntorya -1 discovery. Proposed 2018 Work Programme

  12. Slide 12: Seismic section with Proposed Ntorya-3 well

    Seismic section with Proposed Ntorya-3 well A Ntorya-3 Ntorya-2 Ntorya-1 A’ Albian reservoir top Intra-Albian unc. Targeting thicker A gross reservoir system A’ Seismic Line through NT-3 – NT-2 – NT-1 4 km 12

  13. Slide 13: Ntorya-3 – Geological Section

    Ntorya-3 – Geological Section LEGEND R RESERVOIR s SOURCE SAND LIMESTONE SHALE Geological cross-section through the NT-1, NT-2 and proposed NT-3 showing the primary target, the Albian sands located within cretaceous aged deposits and a potential secondary target within Jurassic deposits 13

  14. Slide 14: 14

    14

  15. Slide 15: Kiliwani North Summary

    Kiliwani North Summary Gas Reserves Gross Licence Basis (2P) Area Bcf MMBOE (6:1) Kiliwani North 1.94 0.323 • Cumulative gas produced to date 6.4 Bcf • Remaining reserves to be produced with compression • Actively seeking suitable compressors • Kiliwani North offers low cost operations with high net

  16. Slide 16: Kiliwani and Nyuni Upside New Mapping

    Kiliwani and Nyuni Upside New Mapping RPS SSI Processing Plant Reservoir structure Songo Songo field Kiliwani North field shelf edge Mapped closures Structural closures identified with recent mapping • New lead identified in Kiliwani South • Kiliwani and shelf at Nyuni have significant upside • Exis

  17. Slide 17: Near Term Development Objectives in Tanzania

    Near Term Development Objectives in Tanzania Ruvuma • Finalise development licence over Ntorya with support from Tanzanian Government • Joint venture committed to drilling Ntorya-3 ( proposed spud H2-2018) • Proceed to first gas as quickly as possible • Ongoing technical work: • Basin is area of hig

  18. Slide 18: Future Growth Strategy

    Future Growth Strategy • Consider growth opportunities including M & A involving assets and companies which are production / development led • Leverage existing strong shareholder base to accelerate growth • Key criteria: • Existing or near term production • Look for development / appraisal led grow

  19. Slide 19: Summary

    Summary • Company has cash position of approximately $9MM (cash and cash receivables) at year end • Company is fully debt free • Significant resource base to develop • 763 Bcf (2C); 1.9 Tcf gross Pmean GIIP (Ntorya only) • Supportive shareholders to focus on growth • Actively seeking further growth