Integra Resources Corp · TSXV:ITR

Integra Resources — Investor Presentation (July 2025)

47 slides from Integra Resources's investor presentation, July 2025

  1. Slide 1: Growing Precious Metals Producer in the Great Basin

    Growing Precious Metals Producer in the Great Basin CORPORATE PRESENTATION – JULY 2025 TSX-V: ITR I NYSE: ITRG INTEGRARESOURCES.COM

  2. Slide 2: Cautionary Note & Disclaimer

    CAUTIONARY NOTE & DISCLAIMER This document has been prepared by Integra Resources Corp. (“Integra” or the “Company”) solely for the use in connection with the recipient’s evaluation of the Company. This document is a presentation of information about the Company’s activities as the date of the prese

  3. Slide 3: Growth Focused Precious Metals Producer in the Great Basin of the USA

    Florida Canyon Mine: Nevada DeLamar Project: Idaho Nevada North Project: Nevada GROWTH FOCUSED PRECIOUS METALS PRODUCER IN THE GREAT BASIN OF THE USA Focused on demonstrating profitability Delivering value through successful mining and operational success at principal operations, efficient project d

  4. Slide 4: Growth Focused Precious Metals Producer

    Growth Focused Precious Metals Producer DeLamar Production & Florida Canyon generates cash flow to support Cash Flow the advancement of DeLamar & Nevada North Florida Canyon Growth Built-in pipeline of complementary heap leach Pipeline projects underpin unmatched growth profile Idaho Resource Peer l

  5. Slide 5: Key People: Proven Track Record

    Key People: Proven Track Record Executive team with extensive experience in operations, project development, exploration and capital markets George Salamis Clifford Lafleur Andrée St-Germain President, CEO & Director Chief Operating Officer Chief Financial Officer • +30 years of experience • +25 yea

  6. Slide 6: Key Assets: Complementary, High-Quality, Great Basin Focused

    Key Assets: Complementary, High-Quality, Great Basin Focused Florida Canyon Mine (Nevada)1 DeLamar Project (Idaho)1 Nevada North Project (Nevada)1,2 Production & Cash Flow Engineering & Permitting De-risking & Growth Status: Acquired by Integra in 2024; Status: 2022 Pre-feasibility Study, 2023 Statu

  7. Slide 7: Key Assets: Sequencing & Production Potential

    Key Assets: Sequencing & Production Potential Florida Canyon provides near-term cash flow to fund project advancement and future growth from DeLamar and Nevada North Project Sequencing Exploration Studies & Permitting Production Building blocks in place for potential 20+ Nevada Florida DeLamar year

  8. Slide 8: Corporate Snapshot

    Corporate Snapshot Share Structure1 Approx. Ownership Breakdown2 Basic Shares Outstanding 169.0M Top Institutional Investors Options 3.8M Warrants 8.0M RSUs / DSUs 3.3M Fully Diluted Shares Outstanding 184.1M 15% Basic Market Capitalization ~US$265M Retail & Other 45% Cash Balance ~US$61M Institutio

  9. Slide 9: Driving Tangible Value for Stakeholders & Communities

    Driving Tangible Value for Stakeholders & Communities OUR APPROACH TO ESG Environmental Social Governance Guided by our mission and core values, ESG is embedded in our decision making at all levels. Integra is committed to creating broad social and economic benefit for the communities surrounding ou

  10. Slide 10: Florida Canyon Mine

    Florida Canyon Mine Nevada, USA 10

  11. Slide 11: Florida Canyon Mine: Overview

    Florida Canyon Mine: Overview Summary • Heap leach gold operation located approximately 45 miles southwest of Turquoise Ridge Winnemucca, Nevada, adjacent to Interstate Highway 80 NEVADA Hog Ranch (Barrick/Newmont) NORTH (Rex Minerals) Goldstrike • Continuous operation from 1986-2011 and then interm

  12. Slide 12: Florida Canyon Mine: Site Overview

    Florida Canyon Mine: Site Overview Maintenance Shop Site Arial View Mining CIC Circuit Crushing Recovery Plant Note: Refer to NI 43-101 technical report titled “Technical Report Florida Canyon Gold Mine, Pershing County, Nevada, USA”, dated July 11, 2024, with an effective date of June 28, 2024, ava

  13. Slide 13: Florida Canyon Mine: Operations Overview

    Florida Canyon Mine: Operations Overview Processing Profile Operating Metrics Crushed Tonnes Placed (Mt) ROM Tonnes Placed (Mt) 15 Operating Metrics Unit Q1 2025 FY 20242 Total Material Placed (Mt) 12 Increased ROM material to pad 9 Ore kt 3,021 12,866 6 Waste kt 1,799 8,829 3 Strip ratio waste/ore

  14. Slide 14: Florida Canyon Mine: 2025 Outlook

    Florida Canyon Mine: 2025 Outlook Integra is focused on consistent mining operations, process optimization, significant capital investment, and growth 2025 Guidance Gold production ounces 70,000 - 75,000 Total cash cost1 $/oz sold $1,800 - $1,900 Mine-site AISC1 $/oz sold $2,450 - $2,550 Sustaining

  15. Slide 15: Florida Canyon Mine: Optimization & Continuous Improvement

    Florida Canyon Mine: Optimization & Continuous Improvement Ongoing optimization studies and trade-off analysis to be reflected in an updated NI 43-101 study in 2026 Continuous improvement initiatives across mining operation Mine Metallurgy Planning Mining Process G&A Fleet Efficiency Note: Refer to

  16. Slide 16: Florida Canyon Mine: Growth Potential

    Florida Canyon Mine: Growth Potential Integra focused on defining additional oxide material to support production growth and mine life extension Near Mine Growth Regional Growth North Florida Pit North Canyon Mine HLP Central Pit I-80 Radio ~5 miles Towers Pits South Main HLP Standard Pit Jasperoid

  17. Slide 17: Florida Canyon Mine: 2025 Growth Drilling

    Florida Canyon Mine: 2025 Growth Drilling 10,000m RC drill program initiated in May 2025 focused on near-mine, near-surface oxide gold growth targets Drill Program Highlights Opportunity 1: Near-surface oxide potential from historical dump • Targeting large volumes of historical gold-mineralized bac

  18. Slide 18: Florida Canyon Mine: Workforce & Community

    Florida Canyon Mine: Workforce & Community Integra’s top priority is developing and protecting Florida Canyon’s workforce and delivering value to local communities • Proud to be an active community partner with financial and volunteer support for various area organizations and events • ~ 270-person

  19. Slide 19: DeLamar Project

    DeLamar Project Idaho, USA 19

  20. Slide 20: DeLamar Heap Leach Project: Overview

    DeLamar Heap Leach Project: Overview Property includes Summary1 the historic Kinross • 100% owned, advanced gold-silver project in southwestern Idaho DeLamar mine that produced 750koz Au Lucky Friday • 2022 PFS (open-pit, heap-leach) operation producing avg. ~136koz AuEq per (HL) and 47.6Moz Ag1 yea

  21. Slide 21: DeLamar Heap Leach Project: Robust Development Project

    DeLamar Heap Leach Project: Robust Development Project 2022 Pre-feasibility Study (HL only) demonstrated solid project economics; Feasibility Study to be delivered in 2025 954koz / 136koz US$314M NPV5% US$814/oz 8-year LOM AuEq 33% IRR 2-year Payback LOM AISC at 35,000tpd Total / Avg. LOM After-Tax

  22. Slide 22: DeLamar Heap Leach Project: Stockpiles & Backfill

    DeLamar Heap Leach Project: Stockpiles & Backfill1 • For >20 years, Kinross and other previous owners stockpiled and/or used the mineralized material for backfill that was below the mill cut- off grade • Total defined resource of 504kozs AuEq M&I and 46kozs AuEq Inferred • Average M&I grade of ~0.37

  23. Slide 23: DeLamar Heap Leach Project: The Right Time

    DeLamar Heap Leach Project: The Right Time Executive Orders signed at both State and Federal levels to streamline permitting for large development projects Idaho Strategic Permitting, Efficiency, & Economic Development (SPEED) Act: • Executive Order signed by Idaho Governor Brad Little in January 20

  24. Slide 24: Nevada North Project

    Nevada North Project Nevada, USA 24

  25. Slide 25: Nevada North Heap Leach Project: Overview

    Nevada North Heap Leach Project: Overview Summary1 Wildcat Deposit: Turquoise Ridge • PEA stage, low-sulphidation epithermal gold-silver deposit located in the NEVADA Hog Ranch (Barrick/Newmont) NORTH (Rex Minerals) Goldstrike Farrell Mining District, Nevada, ~56km from the town of Lovelock; 17,612-

  26. Slide 26: Nevada North Heap Leach Project: Simple, High-Margin Operation

    Nevada North Heap Leach Project: Simple, High-Margin Operation 2023 Preliminary Economic Assessment outlined a simple, high margin operation with significant exploration potential US$310M NPV5% US$973/oz 1Moz / ~80koz AuEq 13-year LOM 37% IRR 3-year Payback LOM AISC Total / Avg. LOM 100Mt of Ore Min

  27. Slide 27: Wildcat Heap Leach Deposit: Exploration Potential

    Wildcat Heap Leach Deposit: Exploration Potential Wildcat is located ~30 miles away from currently operating Florida Canyon mine and demonstrates solid growth potential Commentary Wildcat Surface Samples • Mineralized targets discovered at surface outside the current pit; surface samples collected i

  28. Slide 28: Integra’s Value Proposition

    Integra’s Value Proposition 28

  29. Slide 29: Relative Positioning: Cash Flow, Resource Scale & Growth Potential

    Relative Positioning: Cash Flow, Resource Scale & Growth Potential Production and cash flow from Florida Canyon supports built-in growth pipeline: DeLamar and Nevada North Basic Market Cap. (US$M) Mineral Resources (Moz AuEq) $3,051 M&I Inferred 13.4 Large gold & silver resource $2,102 $1,823 8.6 in

  30. Slide 30: Relative Positioning: Closing the Valuation Gap

    Relative Positioning: Closing the Valuation Gap Transition from developer to producer provides an extremely attractive entry point for investors Consensus P/NAV (ratio) 1.22x 1.06x Significant near-term re-rating potential supported by current peer junior producer multiples; index inclusion to bolst

  31. Slide 31: Next Steps & Corporate Timeline

    Next Steps & Corporate Timeline Near term success through profitability, rapid project advancement, disciplined capital allocation, and strategic M&A 2025 Key Objectives Integra Corporate Timeline Exploration Studies & Permitting Production Florida Canyon: generate cash flow, optimization, significa

  32. Slide 32: Building a Mid-tier Precious Metals Producer

    Building a Mid-tier Precious Metals Producer Production & Florida Canyon expected to produce ~70kozs Au annually for ~6 years providing Cash Flow exposure to the strong gold price environment; potential for mine life extension Growth Cash flow from Florida Canyon supports built-in growth pipeline vi

  33. Slide 33: Appendix

    Appendix

  34. Slide 34: 2025 Corporate Guidance

    2025 Corporate Guidance Focused on optimization and capital investment at Florida Canyon and significant advancement of development projects 2025 Guidance Summary Florida Canyon Mine: gold production ounces 70,000 - 75,000 Florida Canyon Mine: total cash cost1 $/oz sold $1,800 - $1,900 Florida Canyo

  35. Slide 35: Board of Directors & Advisors

    Board of Directors & Advisors Board of Directors provides deep industry knowledge and strong governance to support the execution of Integra’s strategy Anna Ladd-Kruger Ian Atkinson Carolyn Clark Loder Chair of Board Director Director • +25 years of experience • +50 years of experience • +30 years of

  36. Slide 36: IFRS Measures

    IFRS Measures Cautionary Note Regarding Non-IFRS Financial Measures Alternative performance measures in this document such as “cash cost”, “AISC” “after-tax cash flow” are furnished to provide additional information. These non-GAAP performance measures are included in this presentation because these

  37. Slide 37: Mineral Reserves & Resources – Effective December 31, 2024

    Mineral Reserves & Resources – Effective December 31, 20241 Mineral Reserves Proven Probable Proven & Probable GOLD (Au) Tonnes (kt) Grade (g/t) Ounces (koz) Tonnes (kt) Grade (g/t) Ounces (koz) Tonnes (kt) Grade (g/t) Ounces (koz) Florida Canyon Mine (a) Oxide - - - 70,385 0.35 785 70,385 0.35 785

  38. Slide 38: Florida Canyon Mine: Notes to Mineral Reserve & Resource Estimate

    Florida Canyon Mine: Notes to Mineral Reserve & Resource Estimate Notes to Mineral Reserves: 1. Mineral reserve estimate has been converted into metric tonnes from short tons using a factor of 0.9072. 2. Mineral reserves are reported at the point of delivery to the process plant, using the 2014 CIM

  39. Slide 39: DeLamar Project: Notes to Mineral Reserve & Resource Estimate

    DeLamar Project: Notes to Mineral Reserve & Resource Estimate Notes to Mineral Reserves: 1. All estimates of mineral reserves have been prepared in accordance with NI 43-101 and are included within the current measured and indicated mineral resources. 2. Thomas L. Dyer, P.E. for RESPEC in Reno, Neva

  40. Slide 40: Nevada North Project: Notes to Mineral Resource Estimate

    Nevada North Project: Notes to Mineral Resource Estimate Notes to Mineral Resources: 1. Mineral resources that are not mineral reserves do not have demonstrated economic viability. 2. William Lewis, P.Geo, and Alan S J San Martin, AusIMM(CP), of Micon International Limited have reviewed and validate

  41. Slide 41: Portfolio Overview: Complementary Portfolio of Great Basin Projects

    Portfolio Overview: Complementary Portfolio of Great Basin Projects Idaho Beartrack-Arnett (Revival) Florida PRODUCTION Stibnite (Perpetua) Canyon Kilgore (Excellon) Boise City DeLamar DeLamar Twin Falls Oxide RESOURCE GROWTH Oregon Oakley Black Pine Hog Ranch (Excellon) Turquoise Ridge (Liberty) Ne

  42. Slide 42: DeLamar Project: Untapped Exploration Potential

    DeLamar Project: Untapped Exploration Potential ~28km2 of highly prospective exploration ground along strike from current ~4.8Moz AuEq M&I resource; significant non- oxide potential underlying the oxide-mixed resource at DeLamar and Florida Mountain1 BlackSheep Target • ~25km2 of exploration ground

  43. Slide 43: Wildcat Heap Leach Deposit: 2024 Drilling Overview

    Wildcat Heap Leach Deposit: 2024 Drilling Overview Drilling confirmed continuity of mineralization and gathered important technical data; critical markers for working exploration hypothesis remain intact for Breccia Pipe target Note: Refer to news release dated December 12, 2024; NI 43-101 technical

  44. Slide 44: Red Canyon Project: Overview

    Red Canyon Project: Overview Summary • Red Canyon is located within the most productive stratigraphic horizon in Nevada, host to the largest Carlin style gold deposits; property consists of 6,650-acre land package Turquoise Ridge NEVADA Hog Ranch (Barrick/Newmont) • Broad area of strong hydrothermal

  45. Slide 45: Red Canyon Project: Geochemical Anomalies & Relative Location

    Red Canyon Project: Geochemical Anomalies & Relative Location Geochemical Anomalies Project Location Cortez Mine Regional Rampart & Wall productive faults Red Canyon Property Gold Bar Mine Geochemical anomalies suggest a large-scale hydrothermal system is present at the property with elevated Carlin

  46. Slide 46: Red Canyon Project: Drilling Overview

    Red Canyon Project: Drilling Overview Long/Cross Sections Drill Targets 2.6 g/t over 22m including 3.0 g/t over 19m 4.5 g/t over 54m A including A’ 9.2 g/t over 22m 3.0 g/t over 11m including 10.3 g/t over 3m 0.5 g/t over 35m 1.1 g/t over 15m 4.6 g/t over 18m Source: Refer to Millennial Precious Met

  47. Slide 47: For more information, please contact

    For more information, please contact: Jason Banducci, Vice President Corporate Development & Investor Relations TSX-V: ITR | NYSE: ITRG Email: jason.banducci@integraresources.com 47