Indiana Resources Limited · ASX:IDA

Indiana Resources — Investor Presentation (October 2020)

16 slides from Indiana Resources's investor presentation, Oct 8, 2020

  1. Slide 1: A Golden Future

    A Golden For personal use only Future Investor Presentation ASX: IDA October 2020

  2. Slide 2: Disclaimer & Competent Person's Statement

    DISCLAIMER & COMPETENT PERSON’S STATEMENT For personal use only This presentation (the “Presentation”) has been prepared by Indiana Resources Limited (‘”Indiana”). No party other than Indiana has authorised or caused the issue of this document, or takes responsibility for, or makes any statements, r

  3. Slide 3: Investment Highlights

    INVESTMENT HIGHLIGHTS For personal use only 5,090 km² highly prospective gold Drilling to commence Q4 2020 – tenement package in the Central Results by end 2020 Gawler Craton, South Australia Multiple advanced targets located Drill ready and fully permitted between the historic mining centres target

  4. Slide 4: Central Gawler Craton Gold Province

    CENTRAL GAWLER CRATON GOLD PROVINCE For personal use only 5,090 KM² PORTFOLIO OF HIGHLY PROSPECTIVE GOLD TENEMENTS IN THE CENTRAL GAWLER CRATON GOLD PROVINCE Strategic holding between historic gold deposits at Tunkillia and Tarcoola Multiple advanced to early stage targets proximal to existing gold

  5. Slide 5: Large Strategic Ground Position

    LARGE STRATEGIC GROUND POSITION For personal use only EXCITING UNDER EXPLORED GOLD PROVINCE Tunkillia Gold Project (558,000 ounce gold resource) adjoins the southern edge of the tenements Historical mining centre of Tarcoola, adjoins the northern edge of the tenements (historic production and curren

  6. Slide 6: Target Overview

    TARGET OVERVIEW For personal use only Underexplored historic gold workings - Lake Labyrinth, Company Well and Earea Dam Extensive Harris Greenstone Belt coverage. Equivalent in age and style to the prolific WA Archaean greenstone belts Lake Labyrinth Shear Zone hosts several exciting targets includi

  7. Slide 7: Lake Labyrinth Shear Zone

    LAKE LABYRINTH SHEAR ZONE MULTIPLE TARGETS FULLY PERMITTED For personal use only AND READY TO DRILL 30km strike of Lake Labyrinth Shear Zone - exposure to multiple exciting untested targets Minos Prospect - mineralisation over wide intervals along 400m strike length from 12m depth Significant histor

  8. Slide 8: Minos and Ariadne Historical Drilling Highlights

    MINOS AND ARIADNE HISTORICAL DRILLING HIGHLIGHTS For personal use only 8 | INDIANA RESOURCES LIMITED | ASX: IDA | OCTOBER 2020 |

  9. Slide 9: Earea Dam

    EAREA DAM Fully granted Mining Lease For personal use only High-grade historic mine (c1899-1940’s) Producing ~2,000 ounces at an average grade of ~35 g/t Au from 1,870 t/ore Wide spaced historic drilling (50m) & minimal drilling per cross section 4.0m @ 10.2 g/t Au from 4m 3.0m @ 13.8 g/t Au from 39

  10. Slide 10: Earea Dam Historical Drilling Highlights

    EAREA DAM HISTORICAL DRILLING HIGHLIGHTS For personal use only 10 | INDIANA RESOURCES LIMITED | ASX: IDA | OCTOBER 2020 |

  11. Slide 11: Double Dutch

    DOUBLE DUTCH Previous exploration includes geological For personal use only mapping, ground mag surveys, soil sampling and RC drilling Multiple gold targets identified in magnetics along strike from Double Dutch – warrants follow-up Drilling intersected significant thicknesses (>10m) of +1 g/t Au at

  12. Slide 12: Double Dutch Historical Drilling Highlights

    DOUBLE DUTCH HISTORICAL DRILLING HIGHLIGHTS For personal use only 12 | INDIANA RESOURCES LIMITED | ASX: IDA | OCTOBER 2020 |

  13. Slide 13: USD$95M Compensation Claim - Tanzanian Government

    USD$ 95M COMPENSATION CLAIM - TANZANIAN GOVERNMENT For personal use only USD$95m compensation claim against the Government of Tanzania for illegal expropriation of Ntaka Hill Nickel Project Indiana is major shareholder (~60%) and manager of joint venture Request for Arbitration lodged with Internati

  14. Slide 14: Near-Term Value Catalysts

    NEAR-TERM VALUE CATALYSTS For personal use only Ability to leverage historical drilling Drilling to commence Q4 2020 on data to quickly compile an updated Minos and Ariadne JORC Resource Estimate for Minos Strong pipeline of drilling activity across the tenement package for Multiple high-grade drill

  15. Slide 15: Corporate Snapshot

    CORPORATE SNAPSHOT For personal use only BOARD & MANAGEMENT CORPORATE STRUCTURE ASX:IDA Shares on issue 225.09m Bronwyn Barnes Executive Chair Options on issue 204.29m* Robert (Bob) Adam Non-executive Director Market Cap (at 08/10/2020 A$0.047) ~A$10.58m Steven Zaninovich Non-executive Director 52 w

  16. Slide 16: Contact

    CONTACT For personal use only Executive Chair: Bronwyn Barnes +61 417 093 256 info@indianaresources.com.au www.indianaresources.com.au Unit 18, Level 2, 100-104 Railway Road, Subiaco WA 6008 ASX: IDA

Indiana Resources — Investor Presentation (October 2020) on 6ix