Vior Gold Corporation Inc. · TSXV:VIO
Vior Gold — Investor Presentation (September 2025)
22 slides from Vior Gold's investor presentation, September 2025
Slide 1: Corporate Presentation September 2025
TSXV: VIO ∙ OTCQB: VIORF ∙ FRANKFURT: VL5 S E P T E M B E R 2 0 2 5 CORPORATE PRESENTATION
Slide 2: Forward Looking Statements & Technical Content
FORWARD Statements in this document, to the extent Such risks and uncertainties with respect to not based on historical events, constitute the company include the effects of general LOOKING forward-looking looking statements. statements include, Forward- without economic conditions, changing exchang
Slide 3: Unlocking Value Through Discoveries
UNLOCKING VALUE THROUGH DISCOVERIES QUEBEC Wemindjii Sept-Iles Matagami Chibougamau LIGNERIS Rouyn-Noranda Quebec Val d’Or BELLETERRE Winneway Belleterre Montreal 3
Slide 4: Belleterre Gold Project: Highlights & Opportunity
Rouyn-Noranda BELLETERRE Val-d’Or GOLD PROJECT 95 km Highlights & Opportunity 95 km • Historic high-grade Belleterre mine produced over 750,000 oz Au at 10.7 g/t (MERN) Winneway • Gold system untested at depth and along strike • Excellent location and low-cost exploration Belleterre • District scale
Slide 5: Belleterre Gold Project: Mineral Claims
BELLETERRE BELLETERRE GOLD MINERAL CLAIMS 635 Claims ~350 km2 N GOLD PROJECT Winneway Belleterre Gold Mine Aubelle Deposit Belleterre DISTRICT-SCALE GOLD PROJECT 1,195 claims over 670 km2 LEGEND Brownfield Exploration Area Area of Significant Gold Exploration Potential Advanced Exploration Prospect
Slide 6: Belleterre Gold Project: Proven Mining Belt
BELLETERRE GOLD PROJECT One of the last under explored historic high-grade gold mining camps in the Abitibi Greenstone Belt … PROVEN MINING BELT PROVEN VALUE CREATION STRATEGY • Historic Belleterre gold mine produced M&A ACTIVITIES from previous consolidated past-producing camps: over 750,000 oz Au
Slide 7: Belleterre Gold: Completed Drill Holes
BELLETERRE GOLD: COMPLETED DRILL HOLES Collar Locations for 60,000m Drill Program HOSKIN VEIN 59.8 g/t Au & 44.9g/t Ag 16.0 g/t Au & 32.5g/t Ag BELLETERRE MINE PAQUIN ZONE 274.9 g/t Au 21.7 g/t Au & 60.1g/t Ag CONWAY ZONE BT#9 VEIN 45.3 g/t Au 50.1 g/t Au AUBELLE ZONE LEGEND QFP A Vior Claim Boundar
Slide 8: BT Mine Trend Plan Map - Assay Results
BT MINE TREND BV25-076 BV25-073 5.01 g/t Au HOSKIN ZONE 11.6 g/t Au over 0.5 m over 0.3 m BV24-033 Plan Map - Assay Results BV25-085 BV25-088 6.6 g/t Au 27.5 g/t Au 4.76 g/t Au over 3. 0m over 0.5 m over 2.6 m Including including 23.5 g/t Au 21.9 g/t Au over 0.8 m over 0.5 m BV24-028 BV24-061 15.9 g
Slide 9: New Discovery Plan Map - Assay Results
HOSKIN ZONE NEW DISCOVERY BV25-143 3.0 g/t Au over 4.3 m Plan Map - Assay Results BELLETERRE MINE PAQUIN ZONE PORC-EPIC 151.5 g/t Au and 89.3 g/t Au CONWAY ZONE SCHOOLHOUSE JAG 27.7 g/t Au AUBELLE ZONE BV25-141 Jolette Vein BELLETERRE 5W 97.9 g/t Au over 1.5 m 121.28 g/t Au and 53.2 g/t au Lac Expan
Slide 10: BT Mine Assay Results East x-Section
BT Mine Assay Results East x-Section N BV24-019 2.1 g/t Au over 4.4 m BV25-063 BV25-076 7.34 g/t Au 5.01 g/t Au over 0.5 m over 0.6 m 250 m BV25-104 7.84 g/t Au over 1.5 m BV25-088 500 m 4.76 g/t Au BV25-073 over 2.6 m 11.6 g/t Au including over 0.3 m 21.9 g/t Au over 0.5 m BV25-085 27.5 g/t Au BV24
Slide 11: ACP Area Assay Results West x-Section
ACP Area Assay Results AUBELLE ZONE CONWAY ZONE PAQUIN ZONE N West x-Section 250 m BV24-056 9.0 g/t Au over 0.5m BV25-094 0.7 g/t Au over 13.7 m BV24-045 BV21-001 24 g/t Au 55.2 g/t Au 500 m BV25-130 BV25-126 over 1.0m over 0.5 m 0.4 g/t Au 9.96g/t Au over 11.6 m over 0.6 m BV24-002 1.6 g/t Au over
Slide 12: BT Mine Trend North Long-Section - DDH Results
BT MINE TREND North Long-Section - DDH Results PAQUIN ZONE CONWAY ZONE AUBELLE ZONE BELLETERRE MINE BV25-063 7.34 g/t Au over 0.60 m BV24-048 39.1 g/t Au over 0.5m BV24-019 2.1 g/t Au BV24-061 over 4.4 m 1.0 g/t Au BV21-001 BV25-094 over 13.0m 55.2 g/t Au 0.7 g/t Au BV24-033 including over 0.5 m ove
Slide 13: Belleterre Gold Project: Next Phase of Drilling
BELLETERRE GOLD PROJECT Next Phase of Drilling Lac Therien Lac Vert Belleterre Mine Lac Guillet South Vein#14 Belleterre Mine Aubelle - Conway Pine Lake Lac Guillet East Vior Claim Boundary Lac Guillet North Deformation Zone Lac Moore Mafic Volcanic Lac Guillet South Gabbro Felsic Volcanic Lac Souff
Slide 14: Next Drilling Phase: South Guillet DZ
NEXT DRILLING PHASE: SOUTH GUILLET DZ
Slide 15: Lignéris Project: Highlights & Opportunity
LIGNERIS PROJECT LIGNERIS PROJECT Highlights & Opportunity 60 km • Excellent location and low-cost exploration • Located 100 km NE of Rouyn-Noranda, Quebec. La Sarre 50 km • Orogenic Au and Auriferous polymetallic vms- related showings (Bousquet-LaRonde type deposits) untested at depth and along str
Slide 16: Lignéris: Historic Drilling Results
LIGNERIS: HISTORIC DRILLING RESULTS • Economical drilling intercepts that includes 13.5 g/t Au over 10.6 m. • Very little work carried out oustide known areas. • North and Central zones are dominated by Au-quartz veins (structurally controlled) • South Zone shows similarities with Au-VMS type deposi
Slide 17: Lignéris Project Historic Drilling Gold Values
A 70 g/t Au / 0,6 m VG 2526 g/t / 0.3 m 8,2 g/t Au / 0,5 m A North Zone 5,0 g/t Au / 6,5 m 73 g/t Au /0,7 m 3,5 g/t Au /4,1 m 4,9 g/t Au / 5,4 m Central Zone 0,9 g/t Au / 24 m Inc 5,7 g/t Au /3,1 m 23,5 g/t Au / 1 m 2,7 g/t Au / 6 m 15 g/t / 1 m LIGNERIS PROJECT HISTORIC DRILLING GOLD VALUES 62,1 g/
Slide 18: Belleterre Gold Project: Exploration Timeline and Project Milestones
BELLETERRE GOLD PROJECT Exploration Timeline and Project Milestones SIGNIFICANT IDENTIFICATION INITIATED MINE TREND AND DISTRICT SCALE PROJECT GOLD OF MINERALIZED EXTENSIVE EXPLORATION CONSOLIDATION RESULTS AT STRUCTURAL DRILL SURFACE TRAPS PROGRAM 2021 – 2024 ACHIEVEMENTS 2025 – 2026 OBJECTIVES • C
Slide 19: Corporate Structure
CORPORATE STRUCTURE + WORKING CAPITAL $54.8M(1) Adjusted Working Capital 415M Shares Outstanding $58.1M Market Capitalization ($0.14/share) Note 1: : The "adjusted working capital“ on March 31, 2025 is a non-IFRS measure that includes cash and non-current investments (GIC ) and excludes listed share
Slide 20: Corporate Profile
CORPORATE PROFILE BOARD OF DIRECTORS MANAGEMENT MATHIEU SAVARD CHARLES-OLIVIER TARTE MATHIEU SAVARD President & CEO President & CEO PASCAL SIMARD VP Exploration INGRID MARTIN CFO SHAYAAN BELLUZZO Corporate Secretary MARK FEDOSIEWICH ANDRE LEBEL Chairman TECHNICAL TEAM ROSE-ANNE BOUCHARD, P.Eng. Expl
Slide 21: Value Based on Strong Fundamentals
SAFE JURISDICTION TEAM WITH PROVEN Quebec TRACK RECORD Amongst world’s top mining Management and Technical Team jurisdictions (Fraser Institute, 2023) Track record of World Class Gold Discoveries CORPORATE PROFILE VALUE BASED ON STRONG FUNDAMENTALS Strategy: Unlocking Value through Discoveries STRON
Slide 22: Contact Us
22 CONTACT US Mathieu Savard President, CEO & Director 418-670-1448 msavard@vior.ca TSXV: VIO OTCQB: VIORF FRANKFURT: VL5 Learn more at VIOR.CA