Cobalt Blue Holdings Ltd. · ASX:COB
Cobalt Blue — Investor Presentation (December 2023)
16 slides from Cobalt Blue's investor presentation, December 2023
Slide 1: Investor Update
December 2023 Investor Update
Slide 2: Disclaimer
Disclaimer The following notice and disclaimer apply to this investor presentation (Presentation). Forward-looking statements and forecasts You are, therefore advised to read this carefully before reading or making any other use This Presentation contains certain “forward-looking statements” and com
Slide 3: ASX: COB
ASX: COB 3 Source: Cobalt Blue Holdings Limited
Slide 4: Proven Products and Collaboration
Proven Products and Collaboration MHP (30% Co, 7% Ni) Pilot Plant (2021) + Demonstration Plant (2022/23) Large-scale operations demonstrating all stages of the flowsheet Ongoing optimisation work 35 full-time staff Cobalt Sulphate (20% Co) Global Sample Program +3 years testing, refining MHP
Slide 5: Growth and Catalysts
Growth and Catalysts Cobalt- Nickel Refinery Waste Streams Projects Strategic Partner agreement Flin Flon Mine: Feedstock contracts Large-scale test work Funding: Commercial partner negotiations Domestic and international agencies European Raw Materials Alliance (ERMA): Current par
Slide 6: COB aims to become a top global producer
COB aims to become a top global producer First Australian cobalt refinery Early midstream entrant into Allied Battery Supply Chain Global cobalt sulphate capacity (Kt Co), 2026–2030 ASX: COB 6 Source: Cobalt Blue Holdings Limited, Benchmark Minerals Intelligence
Slide 7: Proposed Cobalt-Nickel Refinery
Proposed Cobalt-Nickel Refinery ASX: COB 7 Source: Cobalt Blue Holdings Limited
Slide 8: Iwatani Corporation
Iwatani Corporation COB is delighted to name Iwatani Corporation as our partner in developing the Cobalt-Nickel Refinery Project (subject to a binding agreement). Japanese multinational specialising in commodity production/trading. Trades intermediates for cathode active materials, including lit
Slide 9: Flin Flon Tailings: Positive Results
Flin Flon Tailings: Positive Results A 50 kg sample of tailings received in August 2023 and subsequent testwork undertaken. Sample contained approximately: 0.8% Zn, 0.1% Pb, 0.2% Cu, 200 ppm Co Results successfully achieved >90% conversion of the pyrite into pyrrhotite and elemental sulphur.
Slide 10: Broken Hill Cobalt Project
Broken Hill Cobalt Project Targeted project life +20 years: Mineral Resource of 127Mt* for 87,300t cobalt. Primary cobalt: 3,500 tpa of cobalt (as MHP). 300,000 tpa of Elemental Sulphur. A multi-pit open cut mine: Extracting 5.3–6.3 Mtpa cobaltiferous pyrite ore Onsite processing plant to
Slide 11: COB Capital Structure
COB Capital Structure As at: 1 December 2023 Capital Structure: Ordinary Shares: 375m Performance Rights 3.4m Promissory Note1 (5yr to 2025): $3.0m Market Cap (undiluted): $107m Share Price: Share Price: $0.29 Cash & equivalents on hand As at 30/09/2023: $10m 1. Three years interest free
Slide 12: COB 2-Year Indicative Timeline
COB 2-Year Indicative Timeline 23 2024 2025 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q Study DFS Published Published Refinery Development Program Permitting Studies Testing intermediate samples at BHCP Demo Plant EIS Submission / Operating Permits 3rd party supply / offtake contracts Completion of Financing Constru
Slide 13: Cobalt outlook: Impending shortfall
Cobalt outlook: Impending Global demand vs supply: tonnes per annum shortfall Cobalt Price: At a cyclical bottom Consolidated global industry: Allied Nations have an immediate requirement ASX: COB 13 Source: Cobalt Blue Holdings Limited Source: Cobalt supply and demand data from Benchmark Minerals I
Slide 14: Mineral Resource
Mineral Resource The Mineral Resource estimates for the BHCP deposits (at a 275 ppm CoEq cut-off)detailed by Mineral Resource classification Classification Tonnes (Mt) CoEq (ppm) Co (ppm) S (%) Ni (ppm) Contained Co (kt) Contained S (kt) Contained Ni (kt) Pyrite Hill Measured 18.0 1,273 1,020 10.8 1
Slide 15: Compliance Statements
Compliance Statements Information included in this presentation is, in part, extracted from reports available via https://www.cobaltblueholdings.com/ and referenced in the following Compliance Statements. The Company confirms that it is not aware of any new information or data that materially affect
Slide 16: Compliance Statements
Compliance Statements Slides 3 & 7: The information related to the Cobalt-Nickel Refinery is extracted from the ASX announcement titled ‘COB to Progress Cobalt Nickel Refinery Project in 2024’ issued on 27 November 2023. Slides 4 & 10: The information related to metallurgical results and specificati
Cobalt Blue Holdings — Investor Presentation (December 2023) on 6ix