Xenora Minerals Limited · ASX:XRA

Xenora Minerals — Todd River Resources — Investor Presentation (May 2021)

31 slides from Xenora Minerals's investor presentation, May 2021

  1. Slide 1: Targeted exploration of base and precious metals in Australia

    Targeted exploration of base and precious metals in Australia Investor Presentation May 2021

  2. Slide 2: Disclaimer

    Disclaimer • This presentation has been prepared by Todd River Resources Ltd. This document contains background information about Todd River Resources Ltd current at the date of this presentation. The presentation is in summary form and does not purport to be all inclusive or complete. Recipients sh

  3. Slide 3: Corporate Overview

    Corporate Overview Capital Structure Major Shareholders ASX Code TRT S2R (Southern Star) 13.9% Shares on Issue 542.5m 13.9% Marlee Minerals 11.7% Options on Issue (most at 6c) 104.9m Share price (18 May 2021) 5.5cps Moonknight 6.1% 11.7% Market Capitalisation (fully diluted) $30.0m 62.2% Acorn 6.1%

  4. Slide 4: Investment Highlights

    Investment Highlights Key assets include five WA Projects Experienced Strong share Strong cash 100% owned underpin aggressive exploration register with the projects Ni-Cu-PGE Board featuring Top 20 owning position of and earn-in rights to a exploration strategy Will Dix (MD), approximately sixth whi

  5. Slide 5: Experienced, hands-on team

    Experienced, hands-on team Edward Fry Will Dix Mark Bennett Stuart Crow Ian Murray Non-Executive Chairman Managing Director Non-Executive Director Non-Executive Director Edward has extensive experience Will is a geologist with 25 years’ Mark is a geologist with 30 years’ Non-Executive Director Ian h

  6. Slide 6: Investment Opportunity

    Investment Opportunity A burgeoning market for base and precious metals

  7. Slide 7: Why Nickel and Copper, why now?

    Why Nickel and Copper, why now? Nickel and copper are Nickel is a Nickel and copper’s Infrastructure for Upswing in naturally occurring key attributes support the creation and metallic elements with natural sustainability - management of demand for outstanding physical resource, which corrosion resi

  8. Slide 8: Electric vehicle production is booming

    Electric vehicle production is booming ▪ Strong growth in electric vehicle (EV) Long-term electric vehicle sales projection production, with rising government incentives globally ▪ Tesla has announced they will manufacture own battery cathode to ensure ongoing nickel supply ▪ Major car manufacturers

  9. Slide 9: EV production = high volumes of base metal materials

    EV production = high volumes of base metal materials 8

  10. Slide 10: Current Projects

    Current Projects Targeted Nickel and Copper Exploration throughout WA and NT

  11. Slide 11: Key Asset Overview

    Key Asset Overview NANUTARRA (Earning up to 80%) Mt HARDY (100% TRT) ▪ Large unexplored ultramafic intrusion ▪ Hendrix inferred resource of prospective for Ni-Cu-PGE sulphides 2.6Mt @ 10.5% Zn eq* ▪ Large area of conductance to be followed up and ▪ Resource open at depth and to the south drilled in

  12. Slide 12: Upcoming Activity Timeline

    Upcoming Activity Timeline PROJECT April May June July August September Q4 2021 Initial Drilling of Geochem and Crop in the ground Geophysical Anomalies RESULTS RECEIVED AND RC follow up and Eastern Nickel-Copper-PGE PLANNING FOR ROUND 2 limited exploration to November Trend initial drilling Berkshi

  13. Slide 13: Berkshire Valley Project

    Berkshire Valley Project Nickel, Copper and PGE Project | 100% owned

  14. Slide 14: Project Overview

    Berkshire Valley | Nickel, Copper and PGE Project | 100% owned Project Overview ▪ 100km north of Chalice’s Julimar discovery and only 160km north of Perth ▪ 270km2 granted tenure +40Km strike of target stratigraphy ▪ Geologically and geometrically analogous with the Julimar Project ▪ Associated anom

  15. Slide 15: The Julimar Analogy

    Berkshire Valley | The “Julimar Analogy” The extent of mafic-ultramafic rocks at Berkshire Valley based on magnetic imagery and interpretation are comparable in size to the sequence of intrusives at CHN’s Julimar discovery. Scales are the same 1 block = 10 sq Km 14

  16. Slide 16: Previous Exploration

    Berkshire Valley | Previous Exploration | Auger Geochemistry Previous Exploration Previous Sampling Coverage ▪ Previous exploration for gold mainly between 2006-2009 ▪ Focused coverage was along 8Km of strike of the “western trend” ▪ Work restricted to auger geochemical sampling with limited aircore

  17. Slide 17: New PGE Assays | Auger Geochemistry

    Berkshire Valley | New PGE Assays | Auger Geochemistry Nickel Gridded (ppm) Copper Gridded (ppm) Combined PGE’s (ppb) Broad zone of PGE anomalism Coincident Ni-Cu-PGE anomalies 16

  18. Slide 18: Historic Aircore Drilling

    Berkshire Valley | Previous Exploration Previous | Aircore Drilling Historic Aircore Drilling ▪ Very Limited and incomplete Aircore/RAB drilling targeting gold in auger anomalies ▪ Total of 12 RC holes with average depth 45m ▪ Inconsistently assayed in terms of elements and also methods ▪ Despite th

  19. Slide 19: Berkshire Valley Exploration Auger Geochemical Drilling

    Berkshire Valley | Current Exploration | Eastern Trend Auger Geochemistry Berkshire Valley Exploration Auger Geochemical Drilling ▪ No previous exploration at all over the eastern mafic/ultramafic trend – TRT first with land access ▪ 1850 samples collected in April – currently being “prepped” before

  20. Slide 20: Berkshire Valley Exploration Initial Aircore Drilling

    Berkshire Valley | Current Exploration | Western Trend Aircore Berkshire Valley Exploration Initial Aircore Drilling ▪ Systematic aircore drilling over the areas of the Western Trend where there is Ni-Cu-PGE anomalism ▪ Geology confirms a thick package of the “right” mafic to ultramafic rocks with t

  21. Slide 21: Gold Exploration – Historic Results

    Berkshire Valley | Previous Exploration | Gold Exploration Gold Exploration – Historic Results ▪ Multiple gold anomalies in soil geochemistry followed up in recent aircore drilling ▪ Over 50% of the project remains completely untested for gold mineralisation ▪ Best 2 anomalies bracket an area that h

  22. Slide 22: Nanutarra Project

    Nanutarra Project Nickel and Copper Project | Earning up to 80%

  23. Slide 23: Large ultramafic intrusion

    Nanutarra | Nickel and Copper | Earning up to 80% Large ultramafic intrusion ▪ TRT has exclusive option to earn up to 80% by spending $2M over 3 years on exploration ▪ Large partly exposed Proterozoic mafic-ultramafic intrusion ▪ Permissive environment for Ni-Cu-PGE sulphides ▪ Strongly anomalous Ni

  24. Slide 24: Large ultramafic intrusion

    Nanutarra | Nickel and Copper | Earning up to 80% Large ultramafic intrusion ▪ Detailed Fixed Loop EM survey completed ▪ Large area of increased conductance identified ▪ Sits adjacent to Anaconda drilling that contained anomalous PGE results ▪ Heritage survey completed in April 2021, permitting and

  25. Slide 25: Northern Territory Projects

    Northern Territory Projects Petermann Range | Mt Hardy

  26. Slide 26: Strong Focus on NT

    Northern Territory Assets | Petermann Range Strong Focus on NT ▪ Over 6,000km2 of tenure under application with 3,200km2 to proceed to grant pending finalisation of Exploration Agreement – GOLD and COPPER FOCUSED ▪ Largest land position in the central Musgrave Province ▪ No exploration activities fo

  27. Slide 27: Hendrix and Regional Exploration

    Northern Territory Assets | Mt Hardy Hendrix and Regional Exploration ▪ Mineral Resource estimate at Hendrix 2.6Mt @ 10.5% Zn Equivalent* Hendrix Geological Wireframe ▪ Solid foundation for growth at Hendrix, which is open at depth and to the south ▪ Multiple regional targets successfully tested wit

  28. Slide 28: Priorities for CY2021

    Priorities for CY2021 Considered investment, focused projects

  29. Slide 29: The Next Six Months

    The Next Six Months NANUTARRA (Earning up to 80%) Mt HARDY (100% TRT) ▪ Fixed Loop EM Survey – COMPLETE ▪ Aircore drilling over the northern tenements – 2nd half 2021 ▪ Drilling targets or additional Geophysics – Q3 ▪ Follow up as required – Q3 & Q4 Alice Springs BERKSHIRE VALLEY (100% TRT) ▪ Aircor

  30. Slide 30: Project Pipeline

    Project Pipeline | Western Australia | 100% owned Project Pipeline ▪ 2 recently granted EL’s over targets generated by Marlee Minerals and one large tenement application. ▪ Pingandy – a Sedex copper target in the Edmund Basin 220km southwest of Newman, in the basin adjacent to Rumble Resources’ Eara

  31. Slide 31: trrltd.com.au

    WILL DIX Managing Director 08 6166 0255 corporate@trrltd.com.au trrltd.com.au

Todd River Resources — Investor Presentation (May 2021) on 6ix